HomeMy WebLinkAboutR-4332423N
co
co
O
W
0
N
0
N
ii
0
N
H
m
w
CAI
z
ry
I
0
a
I
D
00
of
0
co
00
LO
a o
o I
N Q
N_
LO U)
,�t D
0
0
rn cy)
m
2.5 2.6 2.7 2.8 2.9
2" DOMESTIC WATER
SERVICE - REFER TO
CIVIL FOR CONTINUATION
I I I I I
4" SANITARY
SEWER - REFER
TO CIVIL FOR
CONTINUATION
4" SANITARY
SEWER - REFER
TO CIVIL FOR
CONTINUATION
CORE FACILITY ENLARGED PLUMBING - BELOW FINISHED
FLOOR
SCALE: 1/4" = V-0" BT120-MPP121
2.5 2.6 2.7 2.8 2.9
I I I I I
r/BT1210-13FP-02�
0-BFP-01
OPERAT R OPERATOR
RESTRO M RESTRO M
BT120L1?07 BT120L1206 18
BT120-PRV-01 BT120-EWH-06 HB-3
�I I
' V`
HB-1
BCO
20
OPERATOR
RESTRO M
BT120L1205
HB-1
BCO
20
2" DCW"
WC-1
22
0 FD-1
UR-1
BT120-EWH-02
L-1 21
1
HB-1
OPERATOR
RESTROOM
BT120L1204
1" NPW
MS-1
1 g 3/4" DCW
SEC
BT120-EWH-03 STORAGE
LACTATION
ROOM
BT120L1202
BT120L1201
FCO
- I
. . . . . . . . . . . . . . . . . . . . . . . i I
a
KEY NOTES:
C1/2" TP FROM ABOVE - DETAIL 4/BT120-MPD001.
02 1" DCW FROM ABOVE.
3 1" NPW FROM ABOVE.
C4, 2" DCW UP THROUGH FLOOR.
5 3" WASTE FROM LAVATORIES.
O3" WASTE FROM SINK.
70 3" WASTE FROM MOP SINK.
8 4" WASTE FROM URINALS.
(�)� 4" SANITARY SEWER FROM WATER CLOSETS.
(10\1 4" WASTE FROM FLOOR DRAIN.
(11212" WASTE FROM HUB DRAIN. SEE DETAIL
3/BT120-MPS001.
(E2 4" WASTE FROM HUB DRAIN.
(13 4" UP TO CLEANOUT - DETAIL 2/BT120-MPD001.
T41, DROP 4" SANITARY SEWER DOWN TO LOWER
ELEVATION.
15 2" VENT UP THROUGH FLOOR.
40 MAINTAIN 24" VERTICAL LIMIT AT FLOOR DRAINS.
17 3" HUB DRAIN (3" X 2" REDUCER).
(E8,4" HUB DRAIN (8" X 4" REDUCER). ROUTE DRAIN FROM
BACKFLOW PREVENTER TO HUB DRAIN. REFER TO
DETAIL 1/BT120-MPD002
19 3" VENT THROUGH ROOF.
20 4" DOUBLE TWO-WAY CLEANOUT - DETAIL
2/BT120-MPD001.
21 PROVIDE TAILPIECE TYPE TRAP PRIMER - DETAIL
4/BT120-MPD001. ROUTE 3/4" CONDENSATE LINE FROM
ACU UNIT IN THIS ROOM TO SINK TAILPIECE.
22 SEE DOMESTIC WATER DIAGRAM 1/BT120-MPS001.
23 SEE SANITARY SEWER RISER DIAGRAM 1/BT120-MPS002.
24 3" UP TO CLEANOUT - DETAIL 1/BT120-MPD001.
25 2" WASTE FROM SINK.
26 1" DCW FROM BELOW FLOOR.
27 1" DCW UP THROUGH FLOOR.
37 2" VENT THROUGH ROOF.
C38\> CONNECT 3/4" CONDENSATE LINE FROM ACU IN THIS
ROOM TO TAILPIECE AT SINK.
CORE FACILITY ENLARGED PLUMBING - AT OR ABOVE 4 2 0 4 8
FINISHED FLOOR 2 DEVELOPMENT ENGINEERING
� SCALE IN FEET
SCALE: 1/4" - V-0" BT12��221 msippo 11/25/2025
S LVADESIGNED BY DRAWING NO.:
Y q w 1/4= 1-0" " ' STRIDE BUS RAPID TRANSIT
D
�WASfC'1r 7 Q J BT120-MPP222
DRAWN BY: ��w �G,r� U FILENAME: SOUTH RENTON TRANSIT CENTER
OST)?IDE D. SILVA�� `vaCS� w J S1-BT120-MP-v2020 BT105 FACILITY ID:
CHECKED BY: .ipob 30676 �� BRT General Engineering Consultant :3'� SpUNDTRANSIT CONTRACT No.: MECHANICAL -PLUMBING BT120
M. PHILLIPS t% QST RTA/CN 0205-24 SHEET No: REV:
0 12/10/2024 DOS MP JHS ISSUED FOR BID APPROVED BY: 'rsItONALG� SUBMITTED BY: DATE: REVIEWED BY: DATE: SUBMITTAL DATE: ENLARGED FLOOR PLANS
No. DATE I DSN CHK APP I REVISION 1J. SACKINGER I
Signed: 12-10-2024 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024
CORE FACILITY 501 0