Loading...
HomeMy WebLinkAboutR-4332425N co cy) O W 0 N 0 N > a 75 N m U w UI H z ry ~I a I V) 100 0 I 0 co 2 't a o o LO U) O 0 mco m ISOLATION1" BAL VALVE AT 24" AFF 1/2" BALL VALVE SET AT 18" AFF (WINTER RELIEF) 1" NPW CAPPED MINIMUM OF 12" ) FOR FUTURE USE 1" NPW ROUTED UNDERGROUND TO PLATFORM HOSE BIBBS WINTERIZE NPW INSTRUCTIONS SCALE: NTS 36)( WC-1 CANOPY GROUND HYDRANTS SEVERE WINTERIZING INSTRUCTIONS: STEP 1: CLOSE UPPER 1" BALL VALVE. STEP 2: ATTACH HOSE TO 1/2" BALL VALVE AND RUN TO MOP SINK OR FLOOR DRAIN. STEP 3: OPEN 1/2" BALL VALVE. STEP 4: OPEN GROUND HYDRANTS AT CANOPY FOR MINIMUM TIME OF 1 MINUTE EACH, THEN CLOSE THEM. STEP 5: LEAVE 1/2" BALL VALVE OPEN AND FOR WINTER REMOVE HOSE. TO RETURN GROUND HYDRANTS TO IN-SERVICE: CLOSE 1/2" BALL VALVE AND OPEN 1" UPPER BALL VALVE. BT120-MPS001 2" DCW 2" DCW 1 1/2" DCW 1" DCW WC-1 36 1" DCW 1 " DCW ------------ ----------- 1 1/2" DCW L-1 UR-1 BT120-EWH-01 36 L-1 (T_j� HB-1 3/4" DCW HB-2 0 12/10/2024 DOS MP JHS ISSUED FOR BID No. DATE DSN CHK APP REVISION DESIGNED BY: D. SILVA DRAWN BY: D. SILVA CHECKED BY: M. PHILLIPS APPROVED BY: J. SACKINGER 2" DCW ACU-I ACU-01 - - BT120-BFP-02 FCV 9 BT120-BFP-01 CPG BT120-PRV-01 0 U AIR GAP INTO 3" HUB DRAIN AT CONFORT STATION 4 1 1 /4" DCW 2" DCW--- PG - 1 1/2" DCW WC-1 36 2" DL WHA 1" DCW -3/4" DCW WHA UR-1 � 36 l 1 1/2" DCW �u 36 UR-1 L-1 L-1 CHBD-I BT120-EWH-02 3/4" DCW `'r^1RATE PENETRATIONS STORAGE ROOM J ELECTRICAL ROOM TYPICAL HVAC CONTRACTOR TO RUN CONDENSATE TUBE FROM INDOOR CONDENSOR TO INDIRECT DRAIN, COORDINATE TEE PLACEMENT WITH HVAC ACU-05 \CU-03 - - - ACU-04 ACU-16 i v W W Vi CD ] AIR GAP INTO 3" HUB DRAIN AT CONFORT STATION 4 KEY NOTES: 36� FLUSH VALVES SCHEDULED AIR TOUCHLESS, HANDLE FLUSH VALVES ARE SHOWN IN CASE THE OWNER CHANGES DIRECTION. TYPICAL WC-1 AND UR-1 UNITS. 39 > BACKFLOW PREVENTER IS POWERED FLOOD CONTROL ACU-26 ACU-36 - - ACU-46 - - ACU-56 TYPE. IT CLOSES OFF WATER UPON DETECTION OF \ / \ / BACKFLOW ACTIVATION. NO BMS. W W v ] AIR GAP INTO 3" HUB DRAIN o CLEANOUT AT CONFORT U CAP OR PLUG STATION 2 ERU-01 I (TYPICAL) NOTES: ALL TEES, ELBOWS, INDIRECT DRAIN PIPE AND THREADED CLEANOUT CAPS OR PLUGS IN 2" PVC, MINIMUM SLOPE OF 1%. PIPING NOT SHOWN ON PLUMBING FLOOR PLAN. SEE HVAC FOR LOCATIONS OF UNITS. RISER DIAGRAM - CONDENSATE INDIRECT DRAIN SCALE: NTS 3/4" DCW 2" DCW 1/2" DCW BT120-EWH-05 1/2" DHW - 1" NPW BT120-EW F S-1 BT120-EV MS-1 1" DCW THROUC 1" NPW DOWN THROUGH FLOOR 2" DCW UP THROUGH FLOOR 111 NON -POTABLE WATER - REFER TO CIVIL FOR CONTINUATION RISER DIAGRAM - DOMESTIC WATER SCALE: NTS A ®3067�� Signed: 12-10-2024 pacobs SUBMITTED BY: R. PARGAS WHA) BT120-MPP222 Tm)?IDE BRT General Engineering Consultant DATE: REVIEWED BY: 12/10/2024 J. ALTCHECH AIR GAP INTO MOP SINK BT120-MPP221 SCALE: Q wM;rr NTS Q FILENAME: w J S1-BT120-MP-v2020 z J SOUNDTRANSIT CONTRACT No.: RTA/CN 0205-24 DATE: SUBMITTAL DATE: 12/10/2024 12/10/2024 ACU-07 v CONDENSATE TUBE INTO PIPE TO CONDENSATE TRAP STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 MECHANICAL -PLUMBING RISER DIAGRAM - DOMESTIC WATER CORE FACILITY BT120-EWH-04 R-4332425 DEVELOPMENT ENGINEERING msippo 11 /25/2025 IDRAWING NO.: BT120-MPS001 FACILITY ID: BT120 SHEET No: REV: 503 0