HomeMy WebLinkAboutR-4332440N
C'7
C'7
0
LU
0
N
0
N
0
N
H
m
V1
U
w
C�
H
I
V)
Z
Q
ry
H
I
c)
d
ry
I
D
m
0
I
0
co
00
LO
d 0
N I
N >Q
CD
U)
0
0
o cy)
N
m
BMS POINTS LIST
SYSTEM
EQUIPMENT TYPE
EQUIPMENT ID
BMS 1/0 DESCRIPTION
POINT TYPE
BMS
NOTES
INDICATE/
ALARM
CONTROL
OUTPUT
ELECTRICAL
LIGHTING CONTROL PANEL
BT105-LCP-01
STATUS
DV
X
THE PACKAGED LIGHTING CONTROL PANEL SHALL COMMUNICATE WITH THE BMS THROUGH THE BACNET INTERFACE. THE BMS SHALL MONITOR THESE POINTS FOR EACH LIGHTING
CIRCUIT/ZONE ON THE LIGHTING CONTROL PANEL.
ELECTRICAL
LIGHTING CONTROL PANEL
BT105-LCP-01
SCHEDULE
AV
X
THE PACKAGED LIGHTING CONTROL PANEL SHALL COMMUNICATE WITH THE BMS THROUGH THE BACNET INTERFACE. THE BMS SHALL MONITOR THESE POINTS FOR EACH LIGHTING
CIRCUIT/ZONE ON THE LIGHTING CONTROL PANEL.
ELECTRICAL
LIGHTING CONTROL PANEL
BT105-LCP-02
STATUS
DV
X
THE PACKAGED LIGHTING CONTROL PANEL SHALL COMMUNICATE WITH THE BMS THROUGH THE BACNET INTERFACE. THE BMS SHALL MONITOR THESE POINTS FOR EACH LIGHTING
CIRCUIT/ZONE ON THE LIGHTING CONTROL PANEL.
ELECTRICAL
LIGHTING CONTROL PANEL
BT105-LCP-02
SCHEDULE
AV
X
THE PACKAGED LIGHTING CONTROL PANEL SHALL COMMUNICATE WITH THE BMS THROUGH THE BACNET INTERFACE. THE BMS SHALL MONITOR THESE POINTS FOR EACH LIGHTING
CIRCUIT/ZONE ON THE LIGHTING CONTROL PANEL.
ELECTRICAL
LIGHTING CONTROL PANEL
BT105-LCP-03
STATUS
DV
X
THE PACKAGED LIGHTING CONTROL PANEL SHALL COMMUNICATE WITH THE BMS THROUGH THE BACNET INTERFACE. THE BMS SHALL MONITOR THESE POINTS FOR EACH LIGHTING
CIRCUIT/ZONE ON THE LIGHTING CONTROL PANEL.
ELECTRICAL
LIGHTING CONTROL PANEL
BT105-LCP-03
SCHEDULE
AV
X
THE PACKAGED LIGHTING CONTROL PANEL SHALL COMMUNICATE WITH THE BMS THROUGH THE BACNET INTERFACE. THE BMS SHALL MONITOR THESE POINTS FOR EACH LIGHTING
CIRCUIT/ZONE ON THE LIGHTING CONTROL PANEL.
ELECTRICAL
UPS
BT105-UPS-01
BMS INTERFACE
AV/DV
X
THE PACKAGED CONTROLLER SHALL COMMUNICATE WITH THE BMS THROUGH THE BACNET INTERFACE. THE BMS SHALL MONITOR THESE POINTS.
ELECTRICAL
UPS
BT105-UPS-01
STATUS
DV
X
THE PACKAGED CONTROLLER SHALL COMMUNICATE WITH THE BMS THROUGH THE BACNET INTERFACE. THE BMS SHALL MONITOR THESE POINTS.
ELECTRICAL
UPS
BT105-UPS-01
GENERAL ALARM
DV
X
THE PACKAGED CONTROLLER SHALL COMMUNICATE WITH THE BMS THROUGH THE BACNET INTERFACE. THE BMS SHALL MONITOR THESE POINTS.
ELECTRICAL
ATS
BT105-ATS-01
BMS INTERFACE
AV/DV
X
THE PACKAGED ATS CONTROLLER SHALL COMMUNICATE WITH THE BMS THROUGH THE BACNET INTERFACE. THE BMS SHALL MONITOR THESE POINTS AT A MINIMUM.
ELECTRICAL
ATS
BT105-ATS-01
ATS-UTILITY POSITION
DV
X
THE PACKAGED ATS CONTROLLER SHALL COMMUNICATE WITH THE BMS THROUGH THE BACNET INTERFACE. THE BMS SHALL MONITOR THESE POINTS AT A MINIMUM.
ELECTRICAL
ATS
BT105-ATS-01
UTILITY POWER AVAILABLE
AV
X
THE PACKAGED ATS CONTROLLER SHALL COMMUNICATE WITH THE BMS THROUGH THE BACNET INTERFACE. THE BMS SHALL MONITOR THESE POINTS AT A MINIMUM.
ELECTRICAL
ATS
BT105-ATS-01
STANDBY POWER AVAILABLE
AV
X
THE PACKAGED ATS CONTROLLER SHALL COMMUNICATE WITH THE BMS THROUGH THE BACNET INTERFACE. THE BMS SHALL MONITOR THESE POINTS AT A MINIMUM.
ELECTRICAL
ATS
BT105-ATS-01
ATS-STANDBY POSITION
DV
X
THE PACKAGED ATS CONTROLLER SHALL COMMUNICATE WITH THE BMS THROUGH THE BACNET INTERFACE. THE BMS SHALL MONITOR THESE POINTS AT A MINIMUM.
ELECTRICAL
ATS
BT105-ATS-01
ATS FAIL
DV
X
THE PACKAGED ATS CONTROLLER SHALL COMMUNICATE WITH THE BMS THROUGH THE BACNET INTERFACE. THE BMS SHALL MONITOR THESE POINTS AT A MINIMUM.
ELECTRICAL
POWER QUALITY METER
BT105-SWGR-01
BMS INTERFACE
AV/DV
X
THE PACKAGED CONTROLLER SHALL COMMUNICATE WITH THE BMS THROUGH THE BACNET INTERFACE. THE BMS SHALL MONITOR THESE POINTS.
ELECTRICAL
GENERATOR
BT105-GEN-01
BMS INTERFACE
AV/DV
X
THE PACKAGED CONTROLLER SHALL COMMUNICATE WITH THE BMS THROUGH THE BACNET INTERFACE. THE BMS SHALL MONITOR THESE POINTS.
NOTES: Al = ANALOG INPUT, AO = ANALOG OUTPUT, DI = DIGITAL INPUT, DO - DIGITAL OUTPUT. AV = ANALOG POINT THOUGH BACNET INTERFACE / PACKAGED CONTROLLER. DV = DIGITAL POINT THROUGH BACNET INTERFACE / PACKAGED CONTROLLER.
GENERAL NOTES:
1. SEE DWG BT120-MHS005 - MHS007 AND MHS010 COMMUNICATION SET FOR BMS CONTROLLER DETAILS, CABLES AND TAGS LOCATION.
2. SEETHE CONTROLS NETWORK DIAGRAM BT120-MHS006 FOR SENSOR AND DEVICE CONNECTIONS. ADD POINTS OR DEVICES AS REQUIRED FOR A COMPLETE SYSTEM.
0 1 12/10/2024 I DW I MP I JHS I ISSUED FOR BID
No. I DATE I DSN I CHK I APP I REVISION
DESIGNED BY:
M. LUCERO
DRAWN BY:
R. PREWITT
CHECKED BY:
J.BEAUDRY
APPROVED BY:
J. SACKINGER
30676
ESS1oN
Signed: 12-10-2024
.;acobs
SUBMITTED BY:
R. PARGAS
4STmRIDE
BRT General Engineering Consultant
DATE: REVIEWED BY:
12/10/2024 J. ALTCHECH
Q w
Q
cn �
W J
J
z " SOUNDTRANSIT
DATE:
12/10/2024
SCALE:
NTS
FILENAME:
S1-BT120-MH-v2020
CONTRACT No.:
RTA/CN 0205-24
SUBMITTAL DATE:
12/10/2024
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
MECHANICAL-HVAC
CONTROLS SCHEDULE
CORE FACILITY
R-4332440
DEVELOPMENT ENGINEERING
msippo 11 /25/2025 Ul
DRAWING NO.:
BT120-MHS010
FACILITY ID:
BT105
SHEET No: REV:
518 0