Loading...
HomeMy WebLinkAboutR-4332446N co co W 0 N O N w 0 N m co w C� I z ~I a Q I D m of 0 00 LO co a 0I N j ti U) M LO o N (0 o cY) N � I m GENERAL NOTES: 1. SEE SHEET BT120-EPS121 FOR SITE CONDUIT AND CONDUCTOR SCHEDULE. 2. SEE SHEET BT120-EPS104 FOR SITE LIGHTING CONDUIT AND CIRCUITING. 3. PROVIDE 5/8" X 10' COPPER GROUND ROD, #6 CU GND, AND EXOTHERMIC WELD TO ALL METAL BENCHES, BIKE RACKS, AND OTHER METAL OBJECTS LOCATED UNDER THE SCL POWER LINES. LN-1 BT120-HH-SL-05 ' ' 4. THE ELECTRICAL CONDUIT INFRASTRUCTURE IS COMPRISED OF 5,7 TWO DISTINCT AND PHYSICALLY SEPARATED SYSTEMS: ONE BT120-EPP212 DESIGNATED FOR KING COUNTY METRO (KCM) AND THE OTHER / FOR SOUND TRANSIT (ST). PROVIDE LABEL WITH THE BT120-HH-SL-06 RESPECTIVE OWNER'S IDENTIFICATION (KCM OR ST) IN BT120-HH-SL-10 / LN-1 ADDITION TO THE DISCIPLINE MARKER (ELECTRICAL) TO ALL 5,7 JUNCTION BOX LIDS. /LN-1 BT120-HH-SL-07 1 �5,7 BT120-HH-SL-08 i� KEY NOTES: BT120-EPP213 LN-1' �" �; 122 PROVIDE 5/8" X 10' COPPER GROUND ROD IN LIGHTING LN-2 5,7 BT120-EPP214 BT120-EPP215 %132 HANDHOLES LOCATED IN THE SCL EASEMENT AREA 6,8 TYP UNDER POWER LINES. BOND WITH #6 GND TO LIGHT BT120-HH-SL-09 r 5,7 BT120-HH-SL-04 POLE. BT120-HH-SL-19 BT120-HH-SL-20 BT120-HH-SL-21 BT120-HH-SL-22 BT120-HH-SL-23 13 ALL SITE LIGHTING CIRCUITS TO PANEL BT120-PB4-01 ON LN-1 THIS SHEET. � 5,7 zN_L�Ni 122 122122 LN-3 r 122BT120-HH-SL-11 6,8 BT120-N2-205 _ _�% -LN-1� _ _ _ _ _ _ - n 5,7 --LN-1;- - - - 5,7 140 PROVIDE GROUNDING FOR FENCE AT FENCE END 5,7 - - - - LN-1' - 5,7 _ POSTS, POSTS EVERY 160 FEET, AND POSTS ON EACH LN-2 �� BT120-HH-SL-12��,� � '� / � 5,7 I I - � 5,7 � L 5,7 6 g 1 �, LN-2 I L - - - - - J - - - -1 I SIDE OF AN SCL OVERHEAD LINE. SEE SHEET BT120-HH-SL-16 6,8 LN-1 ----= BT120-EPD111 FOR GROUNDING DETAIL. ;,, _ I S,7 I BT120-HH-SL-03 BT120-HH-SL-13 BT120-HHLV-15 - \ _ LN-2 I 141 CONDUIT GROUP INCLUDES CONDUIT TAGS: LN-1 I/ ®` 5,7 I BT120-N4-202 BT120-E4-202A BT120-E4-202B BT120-HH-SL-31 "r LN-2 LN-2 6,8 BT120-N2-209 5,7 BT120-HH-SL-25 2,4 BT120-HH-SL-14BT120-N2-201, BT120-SC-203, BT120-SC-204. _ 2 4 � � \ BT120-N2-208_ BT120-HH-SL-24 LN-1 I --_----- - --------- - - - - -J y/ BT120-HH-SL-82 BT120-HHLV-29 BT120-HH-SL-80 LN-2 LN-2 -122 122 10,12 142 CONDUIT GROUP INCLUDES CONDUIT TAGS: BT120-HH-SL-15 10,12 ' LN-1 BT120-HH-SL-17 N_1 10,12 BT120-HH-SL-30 - � 'BT120-E4-201A, BT120-E4-201B, BT120-E4-203, BT120-HH-SL-34 � a r' --_ 6 8 6,8 ---- BT120-SC-201, BT120-SC-202, BT120-N2-202. -- 1 � i-BT120-HH-SL-02 BT120-EVCS-01 BT120-HH-SL-27 s LN-2 �__ r � BT120-HH-SL-29 � - - 140 T120-PB2-06-1,3,2,4 122 143 CONDUIT GROUP INCLUDES CONDUIT TAGS: BT120-HH-SL-35 2,4 BT120-N2-204 122 O BT120-HH-SL-37 ° LN-2 BT120-HH-SL-32� / / ! BT120-N2-207 120-HH-SL-26 _1 - BT120-HH-SL-28 LN-1 BT120-N4-201A AND BT120-N4-201 B. 9_ LN-2 --- 2,4 2 r �� 10,12 10,12 122 LO LN-2 148 6,8 r � � �, ��- BN11 O-HH-SL-18 LN-2 � LN-2 147 CONTRACTOR TO INSTALL CONDUIT TO EXISTING 6,8 LO 2,4 \ \ ' �� Xy 6,8 6,8 122 122 9,11 BT120-HH-SL-01 SERVICE TAP LOCATION AND TERMINATE CONDUIT PER _ 1,3 BT120-N2-211 1 BT120-HH-SL-48 PSE REQUIREMENTS. CONTRACTOR WILL NEED TO - - 8 BT120-HH-SL-33 LN-2 ---� _ COORDINATE CONDUIT TERMINATION REQUIREMENTS LN-1 BT120-HHLV-14 10,12 / y I� 1 WITH PSE PRIOR TO INSTALLATION OF 4"C AND 2/0 SVC 2,4 BT120-N2-203 T120-HH-SL-42 140 CABLE. LO \ LN-2 LN-1 122 LN-1 2,4 BT120-HH-SL-36 ------ ----- - BT120-N2-206 6,8 10712 1,3 a BT120-N4-201C,D `BT120-HH-SL-86 LN-2 LN-2 :% 10,12 2 148 CONTRACTOR SHALL FURNISH AND INSTALL THE DUAL BT120-HH-SL-39 2,4 BT120-N2-210 ® BT120-N2-212 BT120-HH-SL-43 BT120-HH-SL-85 122 LN-2 122 �g EV CHARGER. THE DUAL EV CHARGER SHALL BE - - _ BT120-HHLV-28- 10,12` CHARGEPOINT CT4021 DUAL PORT BOLLARD MOUNT. BT120-HH-SL-49 BT120 HH SL-40 BT120 HHLV-27 BT120-HH-SL-41 �� LN-1 LN-2 140 LO � BT120-HHLV-13 LN-2 BT120-HH-SL-73 LN-1 , , 1,3 1,3 9,11 149 ALL PSE TRANSFORMER AND VAULTS PROVIDED BY PSE. 1 3-BT120-HH-SL-47 BT120-N4-203 - 1'3 LN-1 ` CONTRACTOR SHALL COORDINATE EXCAVATION OF BT 120-HHLV-26 BT120-E4-204 1,3 / VAULT PITS WITH PSE SERVICE DRAWING. BT 120-H H-S L-50 --- 141 -�° LN-1 BT120-HH-S -44 122 BT120-HH-SL-72 BT120-N4-204A B BT120-HH-SL-45 ' BT120-HH-SL-51 LN-2 1,3 , BT120-N -213 140 122 r' 313 TERMINATE AND CAP CONDUIT UNDERGROUND FOR BT120-HH-SL-53 -HHLV-12 1 FUTURE USE. PROVIDE MARKING SIGN ABOVE GRADE LN-2 2'4 BT120 142 PV1 1 4"C 2 - - - DENOTING THE BURIED CONDUIT END LOCATIONS. LO 2,4 BT120-HHSC-25 _ O 2 BT120 HH SL 46 BT120-GEN-01 BT120-HH-SL-79 �, BT120-HH-SL-71 1,3 BT120-HH-SL-78 122 LO BT120-HH-SL-52 `� LN-2 PV2 LN-1 LO LO -'1,3 BT120-HH-SL-57 1,3 149 1,3 _ 1,3` �9,11 LN-2 �L 1,3 31 BT120-HH-SL-7 (TYP) - / L- BT120-HH-SL-54 S 83 2'4 B -214 BT120-HH- - PV3 �� q BT120-HH-SL-58 NEW TRANSFORMER 2 BT120-HH-SL-55 120-PB2-03: 23 147 4"C, 2/0 SVC CABLE VAULT PER PSE C D LN-2 IRRIGATION PEDESTAL INSTALLED BY CUSTOMER DRAWING. PLATFORM J02 1,3 LN- LO LO� CONTRACTOR, E EXISTING VAULT - 1 1,3 BT120-HH-SL-75 1,3 CONNECTIONS BY PSE. 1 TO REMAIN (1) 4 C �; 1 3 BT120-HH-SL-76 F N BT120-HH-SL-74 G 313 LO H 40 20 0 40 80 1 1,3 CORE FACILITY GEN SCALE IN FEET KEY PLAN DEVELOPMENT ENGINEERING msippo 11 /25/2025 R-4332446 DESIGNED BY: SCALE: DRAWING NO.: D. TAFTFARREN TAFTF w 1"=40" STRIDE BUS RAPID TRANSIT o� BT120-ESP101 DRAWN BY: o FILENAME: SOUTH RENTON TRANSIT CENTER E. HAJAS Jacobs w J S1-BT120-E-v2020 BT105 FACILITY ID: 9 2 06/27/2025 EH DA DT ADDENDUM #2 CHECKED BY: BRT General Engineering Consultant z " SOUNDTRANSIT CONTRACT No.: ELECTRICAL BT120 1 06/13/2025 EH DA DT ADDENDUM #1 D. ANDERSON ��o �'��ss �Fc ST- 707�� `{� RTA/CN 0205-24 SITE PLAN SHEET No: REV: �R 0 12/10/2024 EH DA DT ISSUED FORBID APPROVED BY: N A L �� SUBMITTED BY: DATE: REVIEWED BY: DATE: SUBMITTAL DATE: SOUTH RENTON TRANSIT CENTER 524 2 No. DATE DSN CHK APP REVISION D. TAFTFARREN 6127125 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024