HomeMy WebLinkAboutR-4332447co
co
O
w
J
LL
O�
U)
c�
(I
O
N
O
N
Ui
6
N
m
U)
'O
N
O
N
U)
O
.-2�I
U
O
J
�I
Q �
N ,I
� U
0
Ln a
N (n
O L
m
0
N
� U
71
1
103
BT120-DBDC-111
BT120-DBSC-111
BT120-N2-106
129 101 BT120-HHLV-0
BT120-N2-102
BT120-DBDC-141
0
m
:1 DO6 ------ ��-Z ... .... ..... .... .....
BT1 20-DBSC-1 31
BT120-DBDC-161
BT120-DBDC-171
T120-HH C-0 101
�10�1�129 BT120-HHLV-10
�► �� M��
.:=■���
/U - - - - -
7: 7
10
1
BT1 20-DBSC-1 51
BT1 20-DBSC-1 61
\ Z__�BT120-HHSC-11 101
-
I 1
BT120-EPP231
I
REC NO. 910%"13110844
20' PUBLIC UTILITY
EASEMENT
GENERAL NOTES:
1. SEE DWG BT120-ESP204, BT120- 201, AND
BT120-EPD104 FOR DUCT BA PLAN, PROFILE,
AND TRENCH DETAIL.
2. SEE DWG BT120- 123 FOR BEB CHARGING
YARD CONDUI ND CONDUCTOR SCHEDULE.
KEY ES:
1 BT120-HHLV-08 & BT120-HHLV-10 PULL BOXES
FOR DC POWER CABLES; BT120-HHLV-09 &
BT120-HHLV-11 PULL BOXES FOR AC
AUXILIARY POWER, PE WIRE AND DATA
CABLES.
103 (6)3" CONDUIT AND (3)3" SPARE CONDUIT FOR
DC POWER CABLES FROM PULL BOX
BT120-HHLV-08 OR BT120-HHLV-10 TO
CHARGING ACM CONTROL MODULE ON
GANTRY VERTICAL STRUCTURE.
104 (3)3" CONDUIT FOR AC AUXILIARY POWER, PE
WIRE AND DATA CABLES FROM PULL BOX
BT120-HHLV-09 OR BT1 20-HHLV-1 1 TO
CHARGING ACM CONTROL MODULE ON
GANTRY VERTICAL STRUCTURE.
105 (3)3" CONDUIT FOR AC AUXILIARY POWER, PE
WIRE AND DATA CABLES FROM PULL BOX
BT120-HHLV-09 OR BT120-HHLV-11 TO FUTURE
CHARGING ACM CONTROL MODULE ON
GANTRY VERTICAL STRUCTURE. CONDUIT
STUB UP AT GANTRY SHALL BE PROTECTED
WITH CONDUIT CAP.
106 (9)3" CONDUIT FOR FUTURE DC POWER
CABLES FROM PULLBOX BT120-HHLV-08 OR
BT120-HHLV-10 TO FUTURE CHARGING ACM
CONTROL MODULE ON GANTRY VERTICAL
STRUCTURE. CONDUIT STUB UP AT GANTRY
SHALL BE PROTECTED WITH CONDUIT CAP.
129 SEE DETAIL 4, DWG BT120-EPD101 FOR VAULT
DETAIL.
147 CONTRACTOR TO INSTALL CONDUIT TO
EXISTING SERVICE TAP LOCATION AND
TERMINATE CONDUIT PER PSE
REQUIREMENTS. CONTRACTOR WILL NEED TO
COORDINATE CONDUIT TERMINATION
REQUIREMENTS WITH PSE PRIOR TO
INSTALLATION OF 4"C AND 2/0 SVC CABLE.
J06 BT120-EPP242 + + + + +
'F'r
0 00 00 0 0 00 00 0 0 00 o• + + + + +
J_JJ J_J__J J_J__J J_J__J J_J_ + + + '+ + + +
Pvi J [103] +
I+ + o 0 0 0+ +
PV2
II 147+
+ + + + e
+ / C
+ + PLATFORM
TRANSFORMER VAULT
NEW TRANSF
- - - - - - - - - - - - PER PSE CUSTOMER DRAWING. E
+ + + + + 0o4"C, 2/0 SVC CABLE INSTALLED F N
+ + + + + + + + + 1 BY CONTRACTOR, i K
CONNECTIONS BY PSE. GANTRY
+ + + + + + �� / H 10 5 0 10 20
+ + +.. +. + + + + CORE
+ : +. + + + ' FACILITY EQUIP YARD
SCALE IN FEE
SITE PLAN - ENLARGED KEY PLAN DEVELOPMENT ENGINEERING
msippo 11 /25/2025 -1-1�
SCALE: 1" = 10'-0" BT120-ESP101 R-4332447
DESIGNED BY: SCALE: DRAWING NO.:
D. TAFTFARREN Q w 1" = 10' STRIDE BUS RAPID TRANSIT
DRAWN BY: U FILENAME: SOUTH RENTON TRANSIT CENTER BT120-ESP401
E. HAJAS .JaCO S,4bf w J S1-BT120-E-v2020 BT105 FACILITY ID:
CHECKED BY: BRT General Engineering Consultant SOUNDTRANSIT CONTRACT No.: ELECTRICAL BT120
1 06/13/2025 EH DA DT ADDENDUM #1 D. ANDERSON RTA/CN 0205-24 SHEET No: REV:
0 12/10/2024 EH DA DT ISSUED FORBID APPROVED BY: SUBMITTED BY: DATE: REVIEWED BY: DATE: SUBMITTAL DATE: SITE PLAN - ENLARGED
EQUIPMENT YARD 525 1
No. DATE DSN CHK APP REVISION D. TAFTFARREN R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024