Loading...
HomeMy WebLinkAboutR-4332447co co O w J LL O� U) c� (I O N O N Ui 6 N m U) 'O N O N U) O .-2�I U O J �I Q � N ,I � U 0 Ln a N (n O L m 0 N � U 71 1 103 BT120-DBDC-111 BT120-DBSC-111 BT120-N2-106 129 101 BT120-HHLV-0 BT120-N2-102 BT120-DBDC-141 0 m :1 DO6 ------ ��-Z ... .... ..... .... ..... BT1 20-DBSC-1 31 BT120-DBDC-161 BT120-DBDC-171 T120-HH C-0 101 �10�1�129 BT120-HHLV-10 �► �� M�� .:=■��� /U - - - - - 7: 7 10 1 BT1 20-DBSC-1 51 BT1 20-DBSC-1 61 \ Z__�BT120-HHSC-11 101 - I 1 BT120-EPP231 I REC NO. 910%"13110844 20' PUBLIC UTILITY EASEMENT GENERAL NOTES: 1. SEE DWG BT120-ESP204, BT120- 201, AND BT120-EPD104 FOR DUCT BA PLAN, PROFILE, AND TRENCH DETAIL. 2. SEE DWG BT120- 123 FOR BEB CHARGING YARD CONDUI ND CONDUCTOR SCHEDULE. KEY ES: 1 BT120-HHLV-08 & BT120-HHLV-10 PULL BOXES FOR DC POWER CABLES; BT120-HHLV-09 & BT120-HHLV-11 PULL BOXES FOR AC AUXILIARY POWER, PE WIRE AND DATA CABLES. 103 (6)3" CONDUIT AND (3)3" SPARE CONDUIT FOR DC POWER CABLES FROM PULL BOX BT120-HHLV-08 OR BT120-HHLV-10 TO CHARGING ACM CONTROL MODULE ON GANTRY VERTICAL STRUCTURE. 104 (3)3" CONDUIT FOR AC AUXILIARY POWER, PE WIRE AND DATA CABLES FROM PULL BOX BT120-HHLV-09 OR BT1 20-HHLV-1 1 TO CHARGING ACM CONTROL MODULE ON GANTRY VERTICAL STRUCTURE. 105 (3)3" CONDUIT FOR AC AUXILIARY POWER, PE WIRE AND DATA CABLES FROM PULL BOX BT120-HHLV-09 OR BT120-HHLV-11 TO FUTURE CHARGING ACM CONTROL MODULE ON GANTRY VERTICAL STRUCTURE. CONDUIT STUB UP AT GANTRY SHALL BE PROTECTED WITH CONDUIT CAP. 106 (9)3" CONDUIT FOR FUTURE DC POWER CABLES FROM PULLBOX BT120-HHLV-08 OR BT120-HHLV-10 TO FUTURE CHARGING ACM CONTROL MODULE ON GANTRY VERTICAL STRUCTURE. CONDUIT STUB UP AT GANTRY SHALL BE PROTECTED WITH CONDUIT CAP. 129 SEE DETAIL 4, DWG BT120-EPD101 FOR VAULT DETAIL. 147 CONTRACTOR TO INSTALL CONDUIT TO EXISTING SERVICE TAP LOCATION AND TERMINATE CONDUIT PER PSE REQUIREMENTS. CONTRACTOR WILL NEED TO COORDINATE CONDUIT TERMINATION REQUIREMENTS WITH PSE PRIOR TO INSTALLATION OF 4"C AND 2/0 SVC CABLE. J06 BT120-EPP242 + + + + + 'F'r 0 00 00 0 0 00 00 0 0 00 o• + + + + + J_JJ J_J__J J_J__J J_J__J J_J_ + + + '+ + + + Pvi J [103] + I+ + o 0 0 0+ + PV2 II 147+ + + + + e + / C + + PLATFORM TRANSFORMER VAULT NEW TRANSF - - - - - - - - - - - - PER PSE CUSTOMER DRAWING. E + + + + + 0o4"C, 2/0 SVC CABLE INSTALLED F N + + + + + + + + + 1 BY CONTRACTOR, i K CONNECTIONS BY PSE. GANTRY + + + + + + �� / H 10 5 0 10 20 + + +.. +. + + + + CORE + : +. + + + ' FACILITY EQUIP YARD SCALE IN FEE SITE PLAN - ENLARGED KEY PLAN DEVELOPMENT ENGINEERING msippo 11 /25/2025 -1-1� SCALE: 1" = 10'-0" BT120-ESP101 R-4332447 DESIGNED BY: SCALE: DRAWING NO.: D. TAFTFARREN Q w 1" = 10' STRIDE BUS RAPID TRANSIT DRAWN BY: U FILENAME: SOUTH RENTON TRANSIT CENTER BT120-ESP401 E. HAJAS .JaCO S,4bf w J S1-BT120-E-v2020 BT105 FACILITY ID: CHECKED BY: BRT General Engineering Consultant SOUNDTRANSIT CONTRACT No.: ELECTRICAL BT120 1 06/13/2025 EH DA DT ADDENDUM #1 D. ANDERSON RTA/CN 0205-24 SHEET No: REV: 0 12/10/2024 EH DA DT ISSUED FORBID APPROVED BY: SUBMITTED BY: DATE: REVIEWED BY: DATE: SUBMITTAL DATE: SITE PLAN - ENLARGED EQUIPMENT YARD 525 1 No. DATE DSN CHK APP REVISION D. TAFTFARREN R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024