Loading...
HomeMy WebLinkAboutR-4332449N C'7 0 W 0 N O N w 0 N H m U w C� �I Z Q ry H I 0 Q ry I D m 0 I 0 co 00 LO M a CI c� O Cn o � � O N Cfl O M N co _ co m 1 06/13/2025 EH DA DT ADDENDUM #1 0 12/10/2024 JS LG DT ISSUED FOR BID No. I DATE I DSN I CHK I APP I REVISION DESIGNED BY: J. SAXER DRAWN BY: E. HAJAS CHECKED BY: L. GLASER APPROVED BY: D. TAFTFARREN BT120-EPD107 N--" LIGHTING PLAN - SECTOR A SCALE: 1/8" = 1'-0" AFT F pacobs 57079 R&GISTBY- w� �sSI�NAL V, SUBMITTED BY: 6113125 R. PARGAS BT120-ELP211 STmRIDE BRT General Engineering Consultant DATE: REVIEWED BY: 12/10/2024 J. ALTCHECH Q w cn� W J J z SOUNDTRANSIT DATE: 12/10/2024 SCALE: 1/8" = 1'-0" FILENAME: S 1-BT120-E-v2020 CONTRACT No.: RTA/CN 0205-24 SUBMITTAL DATE: 12/10/2024 C D PLATFORM JE F G H CORE FACILITY 7)111 KEY PLAN GENERAL NOTES: 1. LT FIXTURES TO BE ATTACHED TO COLUMNS ARE TO BE MOUNTED SO THAT THEIR LENSES ARE 9'-0" ABOVE THE GROUND BELOW. ALIGN AND COORDINATE WITH ARCHITECTURE FOR PENETRATION, CONDUIT FEED AND MOUNTING SCREWS. KEY NOTES: 301 ATTACH PHOTOCELL TO HORIZONTAL SUPPORT AT 11' ABOVE FINISHED GRADE, UNDER THE CANOPY WITH SENSOR AIMED NORTH. 30 CONNECT PHOTOCELL TO PANEL BT120-LCP-02 USING CAT6 CABLE RUN IN 3/4" CONDUIT. 31 USE CHASE PROVIDED BY STRUCTURAL AT COLUMNS FOR LIGHTING CONDUIT. SEE POWER SHEET BT120-EPP212 THROUGH BT120-EPP214 FOR CONDUIT PLAN. M N m J W LLJ Z_ p J T- 2 H V m Q � W W U) N 8 4 0 8 16 SCALE IN FEET DEVELOPMENT ENGINEERING msippo 11 /25/2025 R-4332449 :01 nRA\NINr; Mn STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 ELECTRICAL LIGHTING PLAN - SECTOR A CANOPY BT120-ELP212 FACILITY ID: BT120 SHEET No: REV: 527 1