HomeMy WebLinkAboutR-4332452N
C'7
0
W
0
N
0
N
W
O
N
H
m
U)
U
W
C�
I
H
Z
Q
ry
I
0
W
Q
ry
I
D
m
of
0
co
00
LO
co
W QI
ti U)
o �
L o
(N
o cY)
N
co m
1
BT120-EPP212
1.1
1
BT120-EPP214
PLATFORM
JE
F
G
H
CORE
FACILITY
7)111 KEY PLAN
GENERAL NOTES:
1. BT120-2-OXX DENOTES THE ELECTRICAL
CONDUIT CALLOUT. SEE SHEET BT120-EPS122
FOR CONDUIT AND CONDUCTOR SCHEDULE.
2. ALL SOUND TRANSIT PLATFORM CIRCUITS ARE
FED FROM PANEL BT120-PB2-04. SEE PANEL
SCHEDULE ON SHEET BT120-EPS116.
3. SEE GENERAL NOTES, LEGEND, AND
ABBREVIATIONS ON SHEET BT120-EPNO01.
4. SEE TELECOMM PLAN SHEETS BT120-JCP206
TO BT120-JCP209 FOR DESIGN OF CONDUITS
AND BOXES SHOWN GREYED BACK ON THIS
SHEET
5. INSTALL ALL UNDERGROUND CONDUIT WITHIN
STRUCTURE FOOTPRINT ABOVE FOOTING.
INSTALL AS CLOSE TO THE SURFACE OF THE
FOOTING AS FEASIBLE.
6. THE ELECTRICAL CONDUIT INFRASTRUCTURE
IS COMPRISED OF TWO DISTINCT AND
PHYSICALLY SEPARATED SYSTEMS: ONE
DESIGNATED FOR KING COUNTY METRO (KCM)
AND THE OTHER FOR SOUND TRANSIT (ST).
PROVIDE LABEL WITH THE RESPECTIVE
OWNER'S IDENTIFICATION (KCM OR ST) IN
ADDITION TO THE DISCIPLINE MARKER
(ELECTRICAL) TO ALL JUNCTION BOX LIDS.
7. SEE SHEET BT120-EPS121 FOR HANDHOLE
SCHEDULE.
8. SEE SHEET BT120-EPS104 FOR SITE LIGHTING
CONDUIT AND CIRCUITING.
32 16 0 32 64
SCALE IN FEET
DEVELOPMENT ENGINEERING
R-4332452 msi ppo 11 /25/2025
DESIGNED BY: SCALE: DRAWING NO.:
D. TAFTFARREN DAFT, STRIDE BUS RAPID TRANSIT
�� SF Q w 1/32" = 1'-0° BT120-EPP211
DRAWN BY: l o 7 FILENAME: SOUTH RENTON TRANSIT CENTER
C/)
E. HAJAS z vaC� S. w -j S1-BT120-E-v2020 BT105 FACILITY ID:
CHECKED BY: A 57079 BRT General Engineering Consultant z SOUNDTRANSIT CONTRACT No.: ELECTRICAL BT120
1 06/13/2025 EH DA DT ADDENDUM #1 D. ANDERSON �o� R�GISTEy- �ww RTA/CN 0205-24 SHEET No: REV:
E
0 12/10/2024 EH DA DT ISSUED FOR BID APPROVED BY: oNaL SUBMITTED BY: DATE: REVIEWED BY: DPOWER PLAN
ATE: SUBMITTAL DATE: CANOPY -OVERALL 530 1
No. DATE DSN CHK APP REVISION D. TAFTFARREN 6113125 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024