Loading...
HomeMy WebLinkAboutR-4332452N C'7 0 W 0 N 0 N W O N H m U) U W C� I H Z Q ry I 0 W Q ry I D m of 0 co 00 LO co W QI ti U) o � L o (N o cY) N co m 1 BT120-EPP212 1.1 1 BT120-EPP214 PLATFORM JE F G H CORE FACILITY 7)111 KEY PLAN GENERAL NOTES: 1. BT120-2-OXX DENOTES THE ELECTRICAL CONDUIT CALLOUT. SEE SHEET BT120-EPS122 FOR CONDUIT AND CONDUCTOR SCHEDULE. 2. ALL SOUND TRANSIT PLATFORM CIRCUITS ARE FED FROM PANEL BT120-PB2-04. SEE PANEL SCHEDULE ON SHEET BT120-EPS116. 3. SEE GENERAL NOTES, LEGEND, AND ABBREVIATIONS ON SHEET BT120-EPNO01. 4. SEE TELECOMM PLAN SHEETS BT120-JCP206 TO BT120-JCP209 FOR DESIGN OF CONDUITS AND BOXES SHOWN GREYED BACK ON THIS SHEET 5. INSTALL ALL UNDERGROUND CONDUIT WITHIN STRUCTURE FOOTPRINT ABOVE FOOTING. INSTALL AS CLOSE TO THE SURFACE OF THE FOOTING AS FEASIBLE. 6. THE ELECTRICAL CONDUIT INFRASTRUCTURE IS COMPRISED OF TWO DISTINCT AND PHYSICALLY SEPARATED SYSTEMS: ONE DESIGNATED FOR KING COUNTY METRO (KCM) AND THE OTHER FOR SOUND TRANSIT (ST). PROVIDE LABEL WITH THE RESPECTIVE OWNER'S IDENTIFICATION (KCM OR ST) IN ADDITION TO THE DISCIPLINE MARKER (ELECTRICAL) TO ALL JUNCTION BOX LIDS. 7. SEE SHEET BT120-EPS121 FOR HANDHOLE SCHEDULE. 8. SEE SHEET BT120-EPS104 FOR SITE LIGHTING CONDUIT AND CIRCUITING. 32 16 0 32 64 SCALE IN FEET DEVELOPMENT ENGINEERING R-4332452 msi ppo 11 /25/2025 DESIGNED BY: SCALE: DRAWING NO.: D. TAFTFARREN DAFT, STRIDE BUS RAPID TRANSIT �� SF Q w 1/32" = 1'-0° BT120-EPP211 DRAWN BY: l o 7 FILENAME: SOUTH RENTON TRANSIT CENTER C/) E. HAJAS z vaC� S. w -j S1-BT120-E-v2020 BT105 FACILITY ID: CHECKED BY: A 57079 BRT General Engineering Consultant z SOUNDTRANSIT CONTRACT No.: ELECTRICAL BT120 1 06/13/2025 EH DA DT ADDENDUM #1 D. ANDERSON �o� R�GISTEy- �ww RTA/CN 0205-24 SHEET No: REV: E 0 12/10/2024 EH DA DT ISSUED FOR BID APPROVED BY: oNaL SUBMITTED BY: DATE: REVIEWED BY: DPOWER PLAN ATE: SUBMITTAL DATE: CANOPY -OVERALL 530 1 No. DATE DSN CHK APP REVISION D. TAFTFARREN 6113125 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024