Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C25004509_Meadow Ave SP V2 - 989-601-108
2/20/2026 Attendees Ashley Wragge (awragge@rentonwa.gov) SRary (srary@rentonwa.gov) Huy Huynh (hhuynh@rentonwa.gov) Documents P_Landscape_251105_v2.pdf L_REET_251105_v1.pdf L_Deed_of_Dedication_251105_v3.pdf RS_TIR_251105.pdf P_Civil_Construction_Plans_251105.pdf M_PO_Approval_251105_v1.pdf C_Response_Letter_251105_v1.pdf Record Message Date Time Document Page Number 1 Huy Huynh: Joined Session 2/4/2026 5:01 PM 2 Huy Huynh: Added 'P_Civil_Construction_Plans_251105.pdf'2/4/2026 5:02 PM P_Civil_Construction_ Plans_251105.pdf 3 Huy Huynh: Added 'RS_TIR_251105.pdf'2/4/2026 5:02 PM RS_TIR_251105.pdf 4 Huy Huynh: Added 'L_REET_251105_v1.pdf'2/4/2026 5:02 PM L_REET_251105_v1. pdf 5 Huy Huynh: Added 'C_Response_Letter_251105_v1.pdf'2/4/2026 5:02 PM C_Response_Letter_ 251105_v1.pdf 6 Huy Huynh: Added 'L_Deed_of_Dedication_251105_v3.pdf'2/4/2026 5:02 PM L_Deed_of_Dedicatio n_251105_v3.pdf 7 Huy Huynh: Added 'M_PO_Approval_251105_v1.pdf'2/4/2026 5:02 PM M_PO_Approval_251 105_v1.pdf 8 Huy Huynh: Added 'P_Landscape_251105_v2.pdf'2/4/2026 5:02 PM P_Landscape_25110 5_v2.pdf 9 Huy Huynh: Left Session 2/4/2026 5:05 PM 10 Ashley Wragge: Joined Session 2/6/2026 9:31 AM Message Date Time Document Page Number 11 Ashley Wragge: Left Session 2/6/2026 1:04 PM 12 Ashley Wragge: Joined Session 2/12/2026 8:56 AM 13 Ashley Wragge: Left Session 2/12/2026 10:42 AM 14 SRary: Joined Session 2/12/2026 3:21 PM 15 SRary: Set status to Reviewing 2/12/2026 3:21 PM 16 SRary: Added Callout 2/12/2026 3:32 PM L_Deed_of_Dedicatio n_251105_v3.pdf 1 17 SRary: Edited Callout (PORTION OF )2/12/2026 3:32 PM L_Deed_of_Dedicatio n_251105_v3.pdf 1 18 SRary: Move Markups 2/12/2026 3:32 PM L_Deed_of_Dedicatio n_251105_v3.pdf 1 19 SRary: Added Callout 2/12/2026 3:38 PM P_Civil_Construction_ Plans_251105.pdf 1 20 SRary: Edited Callout (PLEASE ADD COR MONUMENT #)2/12/2026 3:38 PM P_Civil_Construction_ Plans_251105.pdf 1 21 SRary: Delete Callout 2/12/2026 3:40 PM P_Civil_Construction_ Plans_251105.pdf 22 SRary: Added Callout 2/12/2026 3:41 PM L_REET_251105_v1. pdf 1 23 SRary: Edited Callout (The)2/12/2026 3:41 PM L_REET_251105_v1. pdf 1 24 SRary: Move Markups 2/12/2026 3:41 PM L_REET_251105_v1. pdf 1 25 SRary: Move Callout 2/12/2026 3:41 PM L_REET_251105_v1. pdf 1 26 SRary: Paste 2/12/2026 3:42 PM L_REET_251105_v1. pdf 1 Message Date Time Document Page Number 27 SRary: Move Markups 2/12/2026 3:42 PM L_REET_251105_v1. pdf 1 28 SRary: Add Cloud+2/12/2026 3:42 PM L_REET_251105_v1. pdf 1 29 SRary: Edited Cloud+ (STATE HAS UPDATED TEMPLATE. PLEASE SELECT TEMPLATE BASED ON DATE DEED IS SIGNED: https://dor.wa.gov/forms-publications/forms-subject/real-estate- excise-tax-forms) 2/12/2026 3:43 PM L_REET_251105_v1. pdf 1 30 SRary: Move Callout 2/12/2026 3:43 PM L_Deed_of_Dedicatio n_251105_v3.pdf 1 31 SRary: Added Callout 2/12/2026 3:46 PM L_REET_251105_v1. pdf 1 32 SRary: Edited Callout (PORTION OF The West 236 feet of Tract 113, West 236 feet of the South half of Tract 112, Hillmans lake Washington Garden of Eden Addition to Seattle, No. 2, according to the plat thereof recorded in Volume 11 of Plats, Page 64, records of King County, Washington ) 2/12/2026 3:46 PM L_REET_251105_v1. pdf 1 33 SRary: Move Markups 2/12/2026 3:46 PM L_REET_251105_v1. pdf 1 34 SRary: Edited Callout (abbreviated: PORTION OF The West 236 feet of Tract 113, West 236 feet of the South half of Tract 112, Hillmans lake Washington Garden of Eden Addition to Seattle, No. 2, according to the plat thereof recorded in Volume 11 of Plats, Page 64, records of King County, Washington ) 2/12/2026 3:46 PM L_REET_251105_v1. pdf 1 35 SRary: Move Markups 2/12/2026 3:46 PM L_REET_251105_v1. pdf 1 Message Date Time Document Page Number 36 SRary: Edited Callout (Insert below "See attached.": abbreviated: PORTION OF The West 236 feet of Tract 113, West 236 feet of the South half of Tract 112, Hillmans lake Washington Garden of Eden Addition to Seattle, No. 2, according to the plat thereof recorded in Volume 11 of Plats, Page 64, records of King County, Washington ) 2/12/2026 3:47 PM L_REET_251105_v1. pdf 1 37 SRary: Edited Callout (Insert below "See attached.": abbreviated: PORTION OF The West 236 feet of Tract 113, West 236 feet of the South half of Tract 112, Hillmans lake Washington Garden of Eden Addition to Seattle, No. 2, according to the plat thereof recorded in Volume 11 of Plats, Page 64, records of King County, Washington) 2/12/2026 3:47 PM L_REET_251105_v1. pdf 1 38 SRary: Move Markups 2/12/2026 3:47 PM L_REET_251105_v1. pdf 1 39 SRary: Move Callout 2/12/2026 3:47 PM L_REET_251105_v1. pdf 1 40 SRary: Edit Markups 2/12/2026 3:47 PM L_REET_251105_v1. pdf 1 41 SRary: Add Cloud+2/12/2026 3:47 PM L_REET_251105_v1. pdf 1 42 SRary: Edited Cloud+ (insert assessed value)2/12/2026 3:47 PM L_REET_251105_v1. pdf 1 43 SRary: Added Callout 2/12/2026 3:49 PM L_REET_251105_v1. pdf 1 44 SRary: Edited Callout (add date deed of dedication is signed)2/12/2026 3:49 PM L_REET_251105_v1. pdf 1 45 SRary: Set status to Finished 2/12/2026 3:49 PM 46 SRary: Left Session 2/12/2026 3:50 PM 47 Ashley Wragge: Joined Session 2/16/2026 1:00 PM Message Date Time Document Page Number 48 Ashley Wragge: Set status to Finished 2/16/2026 1:02 PM 49 Ashley Wragge: Left Session 2/16/2026 1:02 PM 50 Huy Huynh: Joined Session 2/19/2026 10:45 AM 51 Huy Huynh: Left Session 2/19/2026 12:05 PM 52 Huy Huynh: Joined Session 2/19/2026 2:23 PM 53 Huy Huynh: Added Callout 2/19/2026 2:36 PM P_Civil_Construction_ Plans_251105.pdf 8 54 Huy Huynh: Edited Callout (reword "this storm line shall be privately maintained" ) 2/19/2026 2:37 PM P_Civil_Construction_ Plans_251105.pdf 8 55 Huy Huynh: Move Callout 2/19/2026 2:37 PM P_Civil_Construction_ Plans_251105.pdf 8 56 Huy Huynh: Edited Callout (reword to "this storm line shall be privately maintained" ) 2/19/2026 2:37 PM P_Civil_Construction_ Plans_251105.pdf 8 57 Huy Huynh: Added Callout 2/19/2026 2:59 PM P_Civil_Construction_ Plans_251105.pdf 6 58 Huy Huynh: Edited Callout (review Meadow Ave section )2/19/2026 3:00 PM P_Civil_Construction_ Plans_251105.pdf 6 59 Huy Huynh: Added Highlight (tions and grades sh)2/19/2026 3:08 PM C_Response_Letter_ 251105_v1.pdf 3 60 Huy Huynh: Added Callout 2/19/2026 3:08 PM P_Civil_Construction_ Plans_251105.pdf 6 61 Huy Huynh: Edited Callout (per V1 comment, provide a blow up detail for ADA ramp showing all spot evevation along with cross and running slope ) 2/19/2026 3:09 PM P_Civil_Construction_ Plans_251105.pdf 6 62 Huy Huynh: Paste 2/19/2026 3:09 PM P_Civil_Construction_ Plans_251105.pdf 6 63 Huy Huynh: Move Callout 2/19/2026 3:09 PM P_Civil_Construction_ Plans_251105.pdf 6 Message Date Time Document Page Number 64 Huy Huynh: Move Markups 2/19/2026 3:09 PM P_Civil_Construction_ Plans_251105.pdf 6 65 Huy Huynh: Edited Callout (per V1 comment, -provide a blow up detail for ADA ramp showing all spot evevation along with cross and running slope -Relocate ADA ramp North to align with sidewalk across the street -Ensure that ADA ramp does not locate in travel lane ) 2/19/2026 3:10 PM P_Civil_Construction_ Plans_251105.pdf 6 66 Huy Huynh: Move Markups 2/19/2026 3:10 PM P_Civil_Construction_ Plans_251105.pdf 6 67 Huy Huynh: Added Text Box 2/19/2026 3:19 PM P_Civil_Construction_ Plans_251105.pdf 11 68 Huy Huynh: Edited Text Box (include detail 406.2 )2/19/2026 3:19 PM P_Civil_Construction_ Plans_251105.pdf 11 69 Huy Huynh: Added Text Box 2/19/2026 3:21 PM P_Civil_Construction_ Plans_251105.pdf 10 70 Huy Huynh: Edited Text Box (Per v1 comment, call out for - "existing water service to be cut and cap at the main by city force" ) 2/19/2026 3:22 PM P_Civil_Construction_ Plans_251105.pdf 10 71 Huy Huynh: Added Text Box 2/19/2026 3:24 PM P_Civil_Construction_ Plans_251105.pdf 9 72 Huy Huynh: Edited Text Box (Per V1 comment, add std detail H026 for mailbox installation ) 2/19/2026 3:25 PM P_Civil_Construction_ Plans_251105.pdf 9 73 Huy Huynh: Edited Text Box (Per v1 comment, add note or add call out for existing utilities: -Water - "existing water service to be cut and cap at the main by city force" -Sewer - "existing side sewer service shall be cut and cap at property line by applicant") 2/19/2026 3:27 PM P_Civil_Construction_ Plans_251105.pdf 10 Message Date Time Document Page Number 74 Huy Huynh: Added Highlight 2/19/2026 3:34 PM P_Civil_Construction_ Plans_251105.pdf 8 75 Huy Huynh: Added Callout 2/19/2026 3:41 PM P_Civil_Construction_ Plans_251105.pdf 8 76 Huy Huynh: Edited Callout (PVC pipe requires 3' cover minimum. please revise ) 2/19/2026 3:42 PM P_Civil_Construction_ Plans_251105.pdf 8 77 Huy Huynh: Paste 2/19/2026 3:42 PM P_Civil_Construction_ Plans_251105.pdf 8 78 Huy Huynh: Move Callout 2/19/2026 3:42 PM P_Civil_Construction_ Plans_251105.pdf 8 79 Huy Huynh: Move Markups 2/19/2026 3:42 PM P_Civil_Construction_ Plans_251105.pdf 8 80 Huy Huynh: Paste 2/19/2026 3:42 PM P_Civil_Construction_ Plans_251105.pdf 8 81 Huy Huynh: Move Markups 2/19/2026 3:42 PM P_Civil_Construction_ Plans_251105.pdf 8 82 Huy Huynh: Delete Callout 2/19/2026 3:43 PM P_Civil_Construction_ Plans_251105.pdf 83 Huy Huynh: Delete Callout 2/19/2026 3:43 PM P_Civil_Construction_ Plans_251105.pdf 84 Huy Huynh: Added Text Box 2/19/2026 3:43 PM P_Civil_Construction_ Plans_251105.pdf 8 85 Huy Huynh: Edited Text Box (PVC requires 3' of cover minimum. Please revise all IEs or select a different type of material ) 2/19/2026 3:43 PM P_Civil_Construction_ Plans_251105.pdf 8 86 Huy Huynh: Added Image 2/19/2026 3:47 PM P_Civil_Construction_ Plans_251105.pdf 8 Message Date Time Document Page Number 87 Huy Huynh: Move Image 2/19/2026 3:47 PM P_Civil_Construction_ Plans_251105.pdf 8 88 Huy Huynh: Move Markups 2/19/2026 3:47 PM P_Civil_Construction_ Plans_251105.pdf 8 89 Huy Huynh: Move Markups 2/19/2026 3:47 PM P_Civil_Construction_ Plans_251105.pdf 8 90 Huy Huynh: Move Image 2/19/2026 3:47 PM P_Civil_Construction_ Plans_251105.pdf 8 91 Huy Huynh: Move Markups 2/19/2026 3:47 PM P_Civil_Construction_ Plans_251105.pdf 8 92 Huy Huynh: Edited Callout (Please label pipe directions (typ) )2/19/2026 3:51 PM P_Civil_Construction_ Plans_251105.pdf 8 93 Huy Huynh: Delete Callout 2/19/2026 3:51 PM P_Civil_Construction_ Plans_251105.pdf 94 Huy Huynh: Added Callout 2/19/2026 3:56 PM P_Civil_Construction_ Plans_251105.pdf 10 95 Huy Huynh: Edited Callout (add note)2/19/2026 3:56 PM P_Civil_Construction_ Plans_251105.pdf 10 96 Huy Huynh: Edited Callout (add note per COR std dtl 320.1 )2/19/2026 3:57 PM P_Civil_Construction_ Plans_251105.pdf 10 97 Huy Huynh: Edited Callout (add note per COR std dtl 320.1 (typ) ) 2/19/2026 4:01 PM P_Civil_Construction_ Plans_251105.pdf 10 98 Huy Huynh: Added Callout 2/19/2026 4:11 PM P_Civil_Construction_ Plans_251105.pdf 8 99 Huy Huynh: Edited Callout (add note - applicant shall verify constructibility in the field ) 2/19/2026 4:12 PM P_Civil_Construction_ Plans_251105.pdf 8 Message Date Time Document Page Number 100 Huy Huynh: Move Callout 2/19/2026 4:12 PM P_Civil_Construction_ Plans_251105.pdf 8 101 Huy Huynh: Move Markups 2/19/2026 4:12 PM P_Civil_Construction_ Plans_251105.pdf 8 102 Huy Huynh: Edited Callout (add note - contractor to verify constructibility in the field ) 2/19/2026 4:12 PM P_Civil_Construction_ Plans_251105.pdf 8 103 Huy Huynh: Added Callout 2/19/2026 4:13 PM P_Civil_Construction_ Plans_251105.pdf 8 104 Huy Huynh: Edited Callout (add IE for new connection )2/19/2026 4:13 PM P_Civil_Construction_ Plans_251105.pdf 8 105 Huy Huynh: Disconnected 2/19/2026 5:07 PM 106 Huy Huynh: Disconnected 2/19/2026 5:07 PM 107 Huy Huynh: Disconnected 2/19/2026 5:07 PM 108 Huy Huynh: Disconnected 2/19/2026 5:07 PM 109 Huy Huynh: Joined Session 2/20/2026 8:32 AM 110 Huy Huynh: Added Callout 2/20/2026 10:29 AM P_Civil_Construction_ Plans_251105.pdf 8 111 Huy Huynh: Edited Callout (please label sizing (typ) and rim elevation) 2/20/2026 10:29 AM P_Civil_Construction_ Plans_251105.pdf 8 112 Huy Huynh: Edited Callout (please label trench sizing (typ) and rim elevation) 2/20/2026 10:30 AM P_Civil_Construction_ Plans_251105.pdf 8 113 Huy Huynh: Added Callout 2/20/2026 12:04 PM P_Civil_Construction_ Plans_251105.pdf 8 114 Huy Huynh: Edited Callout (and replace with vanned grate )2/20/2026 12:05 PM P_Civil_Construction_ Plans_251105.pdf 8 115 Huy Huynh: Move Callout 2/20/2026 12:08 PM P_Civil_Construction_ Plans_251105.pdf 6 Message Date Time Document Page Number 116 Huy Huynh: Delete Callout 2/20/2026 12:08 PM P_Civil_Construction_ Plans_251105.pdf 117 Huy Huynh: Paste 2/20/2026 12:08 PM P_Civil_Construction_ Plans_251105.pdf 6 118 Huy Huynh: Move Callout 2/20/2026 12:08 PM P_Civil_Construction_ Plans_251105.pdf 6 119 Huy Huynh: Move Markups 2/20/2026 12:08 PM P_Civil_Construction_ Plans_251105.pdf 6 120 Huy Huynh: Move Callout 2/20/2026 12:08 PM P_Civil_Construction_ Plans_251105.pdf 6 121 Huy Huynh: Add Leader 2/20/2026 12:08 PM P_Civil_Construction_ Plans_251105.pdf 6 122 Huy Huynh: Added Text Box 2/20/2026 12:10 PM RS_TIR_251105.pdf 1 123 Huy Huynh: Edited Text Box (Please update BQWS per comments provided ) 2/20/2026 12:16 PM RS_TIR_251105.pdf 1 124 Huy Huynh: Added Text Box 2/20/2026 12:28 PM RS_TIR_251105.pdf 1 125 Huy Huynh: Edited Text Box (Please provide the full TIR )2/20/2026 12:28 PM RS_TIR_251105.pdf 1 126 Huy Huynh: Added Text Box 2/20/2026 12:30 PM L_Deed_of_Dedicatio n_251105_v3.pdf 1 127 Huy Huynh: Edited Text Box (Please update per comment on civil plan ) 2/20/2026 12:31 PM L_Deed_of_Dedicatio n_251105_v3.pdf 1 128 Huy Huynh: Added Text Box 2/20/2026 12:31 PM L_REET_251105_v1. pdf 1 129 Huy Huynh: Edited Text Box (Please update per civil plan )2/20/2026 12:31 PM L_REET_251105_v1. pdf 1 130 Huy Huynh: Delete Callout 2/20/2026 1:08 PM P_Civil_Construction_ Plans_251105.pdf Message Date Time Document Page Number 131 Huy Huynh: Delete Text Box 2/20/2026 1:08 PM L_REET_251105_v1. pdf 132 Huy Huynh: Delete Text Box 2/20/2026 1:08 PM L_Deed_of_Dedicatio n_251105_v3.pdf 133 Huy Huynh: Left Session 2/20/2026 1:16 PM 134 Huy Huynh: Joined Session 2/20/2026 1:20 PM