Loading...
HomeMy WebLinkAboutRS_TIR_251105 Western Washington Division Eastern Washington Division 165 NE Juniper St., Ste 201, Issaquah, WA 98027 407 Swiftwater Blvd, Cle Elum, WA 98922 Phone: (425) 392-0250 Fax: (425) 391-3055 Phone: (509) 674-7433 Fax: (509) 674-7419 www.EncompassES.net PRELIMINARY TECHNICAL INFORMATION REPORT For Meadow Ave Short Plat 3804 Meadow Avenue N Renton, WA 98056 January 29, 2021 Revised March 7, 2022 Revised August 12, 2025 Revised October 31, 2025 Prepared by: Ian Dahl Encompass Engineering Job No. 20591 Prepared For: Huy Nguyen 15400 SE 155th Place, Unit 99 Renton, WA 98058 Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | i Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | ii Table of Contents List of Figures ...................................................................................................................................ii I. PROJECT OVERVIEW ................................................................................................................ 1 II. CONDITIONS AND REQUIREMENTS SUMMARY ...................................................................... 8 III. DOWNSTREAM ANALYSIS ..................................................................................................... 12 IV. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN ........................... 16 V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN ..................................................................... 19 VII. OTHER PERMITS ..................................................................................................................... 21 VIII. CSWPP ANALYSIS AND DESIGN .............................................................................................. 21 IX. BOND QUANTITIES, FACILITY SUMMARIES AND DECLARATION of COVENANT .................. 21 X. OPERATION AND MAINTENANCE MANUAL .......................................................................... 21 List of Figures Figure 1 – TIR Worksheet Figure 2 – Vicinity Map Figure 3 – Soils Map and Legend Figure 4 – Existing Conditions Map Figure 5 – Developed Conditions Map Figure 6 – Drainage Review Flow Chart Figure 7 – Downstream Map Appendix A Geotechnical Engineering Study by Earth Solutions NW dated March 12, 2020 Geotechnical Review Letter by Earth Solutions NW dated March 7, 2022 Appendix B WWHM Output Appendix C Arborist Report/Tree Plan by Layton Tree Consulting, LLC dated February 12, 2020 Appendix D CSWWP Analysis And Design Appendix E Bond Quantities, Facility Summaries And Declaration Of Covenant Appendix F Operation And Maintenance Manual Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 1 I. PROJECT OVERVIEW Project: Meadow Ave Short Plat Site Address: 3804 Meadow Avenue N, Renton, WA 98056 (See Vicinity Map) Tax Parcel #: 334270-0570 Zoning District: R-6, Single Family Residential Site Area: 25,536 SF (0.59 Acres) Site Location: The site is in the City of Renton within the NW quarter of Section 32, Township 24 North, Range 5 East, W.M, King County, Washington. The site is located on the northeast corner of the intersection of Meadow Ave N and N 38th St. Figure 2: Vicinity Map Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 2 Pre-developed Site Conditions The project site is located in the City of Renton on a 25,536 SF (0.59 Acres) lot that is zoned R-6 (single- family residential). The site is accessed from Meadow Ave N, north of the intersection of N 38th St and Meadow Ave N. The site is bordered to the north and south by single family residences, to the east by I- 405, and to the west by Meadow Ave N right-of way (ROW). The site is currently developed with a single-family residence accessed from Meadow Ave N via two gravel driveways on the western side of the site. The site slopes gently to the northwest at approximately 2%. The property is located within the May Creek drainage basin. Stormwater runoff currently leaves the site at a single natural discharge location at the northwest corner, creating one Threshold Discharge Area for the site. The majority of the site gently slopes at approximately 2%, allowing stormwater to sheet flow northwest into Meadow Ave. A cleared area on the adjacent parcel 334270-0630 is tributary to the site. This off-site area sheet flows to the north over approximately 10-15% slopes onto the existing gravel driveway located in the southern portion of the site. See full downstream analysis in Section III of this Technical Information Report (TIR). An Existing Conditions Map is included as Figure 4 at the end of this Section. Critical Areas According to the City of Renton online mapping system, there is a High Erosion Hazard Area in the northeast corner of the project site. There are no required buffers or building setbacks associated with the erosion hazard area. No other critical areas have been identified on the project site. Soils Per the US Department of Agriculture (USDA), Natural Resources Conservation Service (NRCS) Web Soil Survey (WSS) information, the majority of the project site is underlain with Indianola loamy sand, 5 to 15 percent slopes with a small portion of the site in the northeast corner underlain with Norma sandy loam (See Figure 3 on the following page). Soil explorations detailed in the Geotechnical Engineering Study by Earth Solutions NW dated March 12, 2020 (Appendix A) encountered primarily medium dense silty sand and poorly graded sand. These findings are consistent with geologic and soil mapping resources. An in- situ infiltration test was performed and a design infiltration rate of 5 inches per hour was determined by the Geotech, which is suitable for stormwater infiltration. Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 3 Figure 3: Soil Map and Legend Developed Site Conditions The project proposes the development of three (3) single-family lots within the 25,536 SF (0.59 Acres) parcel, as well as a 7.5-foot right-of-way dedication with frontage improvements. Lot 1 is 8,230 SF (0.19 AC) and is located in the north portion of the site. Lot 2 is 8,043 SF (0.18 Acres) and is located in the central portion of the site. Lot 3 is 7,868 SF (0.18 AC) and is located in the southern portion of the site. All three (3) lots will have driveway access off of Meadow Ave N. Frontage improvements will include the addition of a 5-foot sidewalk, 8-foot planter strip, as well as curb and gutter along the edge of asphalt roadway. Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 4 The total disturbed area for this project, including the construction of frontage improvements, is 27,320 SF (0.627 AC). The parcel is zoned R-6, which allows for a maximum building coverage of 40% and a maximum impervious surface coverage of 55%. The maximum allowable building/impervious surface for each lot is discussed below: · Lot 1: The maximum allowable building coverage for Lot 1 is 8,230 SF*0.4 = 3,292 SF, and the maximum impervious surface coverage is 8,230 SF*0.55 = 4,527 SF. The final site layout of Lot 1 has not been determined at this stage; therefore, this report assumes that the future impervious surfaces required to construct the residence on Lot 1 will use the maximum coverages stated above. · Lot 2: The maximum allowable building coverage for Lot 2 is 8,043 SF*0.4 = 3,217 SF, and the maximum impervious surface coverage is 8,043 SF*0.55 = 4,424 SF. The final site layout of Lot 2 has not been determined at this stage; therefore, this report assumes that the future impervious surfaces required to construct the residence on Lot 2 will use the maximum coverages stated above. · Lot 3: The maximum allowable building coverage for Lot 2 is 7,868 SF*0.4 = 3,147 SF, and the maximum impervious surface coverage is 7,868 SF*0.55 = 4,327 SF. The final site layout of Lot 3 has not been determined at this stage; therefore, this report assumes that the future impervious surfaces required to construct the residence on Lot 3 will use the maximum coverages stated above. Stormwater runoff from the proposed development of Lots 1-3 will be managed as follows: · Lot 1: Stormwater BMP’s satisfying Core Requirement #9 will be used to the maximum extent feasible to mitigate new runoff created by the proposed single-family residence and other impervious surfaces on-site. A 30’x9’ gravel filled full infiltration trench is proposed on Lot 1 to the west of the proposed structure to mitigate stormwater from impervious areas. An emergency overflow to the public storm system from the infiltration trench will be provided. This report assumes that the maximum impervious surface per zoning (4,527 SF) will be conveyed to this infiltration trench. · Lot 2: Stormwater BMP’s satisfying Core Requirement #9 will be used to the maximum extent feasible to mitigate new runoff created by the proposed single-family residence and other impervious surfaces on-site. A 30’x9’ gravel filled full infiltration trench is proposed on Lot 2 to the west of the proposed structure to mitigate stormwater from impervious areas. An emergency overflow to the public storm system from the infiltration trench will be provided. This report assumes that the maximum impervious surface per zoning (4,424 SF) will be conveyed to this infiltration trench. · Lot 3: Stormwater BMP’s satisfying Core Requirement #9 will be used to the maximum extent feasible to mitigate new runoff created by the proposed single-family residence and other impervious surfaces on-site. A 30’x9’ gravel filled full infiltration trench is proposed on Lot 3 Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 5 to the west of the proposed structure to mitigate stormwater from impervious areas. An emergency overflow to the public storm system from the infiltration trench will be provided. This report assumes that the maximum impervious surface per zoning (4,327 SF) will be conveyed to this infiltration trench. Please refer to Core Requirement # 9 in Section II and Section IV of this TIR for additional discussion on stormwater BMPs. A Developed Conditions Map is provided as Figure 5 at this end of this Section. Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 6 Figure 4 – Existing Conditions Map Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 7 Figure 5 – Developed Conditions Map Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 8 II. CONDITIONS AND REQUIREMENTS SUMMARY The 2017 City of Renton Surface Water Design Manual (RSWDM) was utilized to determine and address all core and special requirements. Based on the criteria specified in Figure 1.1.2.A of the RSWDM, the project falls under Full Drainage Review. Per Section 1.1.2.4 of the RSWDM, the project must meet all nine (9) core and all six (6) special requirements. See Figure 6 below for more information on how the type of drainage review was determined. Figure 6: Drainage Review Flow Chart Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 9 Core Requirements Core Requirement #1: Discharge at the Natural Location The proposed development runoff will follow existing drainage patterns toward the Meadow Ave N storm system or will be fully infiltrated on-site. Refer to the Level 1 Downstream Analysis in Section III of this TIR for a complete description of the existing drainage paths. Core Requirement #2: Downstream Analysis A Level 1 Downstream analysis has been completed for the site and no existing or potential drainage problems have been identified. This analysis is included in Section III of this TIR. Core Requirement #3: Flow Control Facilities Based on the City of Renton’s flow control application map, the project site is located within the Peak Rate Flow Control Standard (Existing Site Conditions). Flow control facilities are required to match the developed peak discharge rates to existing site conditions peak discharge rates for 2-, 10- and 100-year return periods. The proposed stormwater BMPs result in a 0.2289 CFS decrease in the 100-year flow using 15- minutes time steps. This is below the allowable threshold of a 0.15 CFS maximum increase per Section 1.2.3.1.B of the RSWDM; therefore, the project meets flow control exemption 2. No formal flow control facilities are proposed at this time; however, flow control BMPs will be implemented as described in Core Requirement #9. Please refer to Section IV of this TIR for additional discussion. Core Requirement #4: Conveyance System Conveyance in compliance with the requirements detailed in Section 1.2.4.1 of the City of Renton 2017 SWDM will be provided with final engineering. Core Requirement #5: Construction Stormwater Pollution Prevention The limits of construction for the project are less than 1 acre. A temporary erosion and sediment control (TESC) plan providing details on best management practices (BMPs) to be implemented during construction is included in the engineering plan set. A Construction Stormwater Pollution Prevention Plan (CSWPPP) will be provided with final engineering. Please refer to Section VIII of this TIR for additional discussion. Core Requirement #6: Maintenance and Operations An Operation and Maintenance Manual will be provided with final engineering. Core Requirement #7: Financial Guarantees and Liability The owner will arrange for any financial guarantees and liabilities required by the permit. Core Requirement #8: Water Quality Facilities In accordance with Section 1.2.8.1.A of the RSWDM, Basic Water Quality Treatment is not required for this project as new plus replaced pollution generating impervious surfaces (PGIS) does not exceed 5,000 SF. The development results in 768 SF of concrete driveway within the ROW dedication area, 485 of pavement replacement within the existing ROW, and 3,700 SF of on- site driveway is estimated for the future build-out of Lots 1-3. These quantities total to 4,953 SF Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 10 of PGIS that will be created or replaced as a result of this project; therefore, the project meets surface area exemption 1. Core Requirement #9: Flow Control BMPs Per section 1.2.9.3.1 of the RSWDM, this project is classified as a small subdivision; therefore, it is subject to the Small Road Improvement and Urban Road Improvement Project BMP Requirements detailed in Section 1.2.9.3.2 in the RSWDM. Although implementation of individual lot BMPs is not required until building permit application, BMPs have been considered for the future improvements on Lots 1-3 based on Section 1.2.9.2 of the RSWDM. See Section IV of this TIR for further discussion and flow control analysis. Impervious Surface BMPs Full Dispersion: Infeasible for Lots 1-3. · Lots 1-3: The space required for a 100-foot native vegetated flowpath segment is not available on these sites. Full Infiltration: Feasible for Lots 1-3. · Lots 1-3: Soil explorations detailed in the Geotechnical Engineering Study by Earth Solutions NW dated March 12, 2020 (Appendix A) encountered primarily medium dense silty sand and poorly graded sand. An in-situ infiltration test was performed and a design infiltration rate of 5 inches per hour was determined which is suitable for stormwater infiltration. Per section C.2.2.3 of the RSWDM, 30 liner feet of 2’ wide trench per 1,000 SF of tributary impervious surface can be used to design full infiltration trenches in coarse sands. For Lots 1-3, three infiltration trenches of 30’x9’ are proposed which provides an infiltration area of 270 SF each. A 30’x9’ trench has the ability to mitigate up to (270 SF/60 SF)x1,000 SF= 4500 SF of tributary impervious surface. This allows each trench to mitigate the entire maximum impervious surface coverage for each lot. As an additional safety measure, an emergency overflow to the public storm system from the infiltration trenches will be provided. As all target impervious surfaces on the project site have been mitigated with flow control BMPs, no further BMPs have been considered. Pervious Surface BMPs Soil Amendment: Feasible for Lots 1-3 · Lots 1-3: All disturbed, pervious areas of the project will meet soil amendment requirements as detailed in Section C.2.13 of the RSWDM. Special Requirements Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 11 Special Requirement #1: Other Adopted Area-Specific Requirements Critical Drainage Area – N/A Master Drainage Plan – N/A Basin Plan – N/A Lake management Plan – N/A Shared Facility Drainage Plan – N/A Special Requirement #2: Flood Hazard Area Delineation The limits of this project do not lie within a delineated FEMA 100-year floodplain. Special Requirement #3: Flood Protection Facilities This project does not rely on or propose to modify/construct a new flood protection facility. Special Requirement #4: Source controls The project is a single-family residential development; therefore, this requirement is not applicable. Special Requirement #5: Oil Control This project is not considered high-use in need of oil control. Special Requirement #6: Aquifer Protection Area The site is not located within an Aquifer Protection Area Zone per the City of Renton Groundwater Protection Area Map Reference 15-B. Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 12 III. DOWNSTREAM ANALYSIS A Level 1 Downstream analysis has been conducted per the requirements in Section 1.2.2.1 of the RSWDM. Please see Tasks 1 through 4 below for a summary of the results. Task 1: Define and Map the Study Area The area of analysis extends from the site discharge points along Meadow Ave N and the eastern limit of the site along the I-405 barrier wall to approximately a quarter-mile downstream where the two discharge areas converge. A Downstream Map is provided in Figure 7 below. Figure 7: Downstream Map Task 2: Review All Available Information on the Study Area Per King county resources, there have been no significant drainage complaints within a quarter-mile downstream of the site. Task 3: Field Inspect the Study Area A field inspection was performed by Encompass Engineering & Surveying on January 26, 2021. Please refer to Task 4 for a detailed description of the downstream drainage system and analysis. Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 13 Task 4: Describe the Drainage System Stormwater runoff currently leaves the site at a single natural discharge location at the northwest corner creating one Threshold Discharge Area for the site. The majority of the site gently slopes at approximately 2%, allowing stormwater to sheet flow northwest into Meadow Ave. A cleared area on the adjacent parcel 334270-0630 is tributary to the site. This off-site area and sheet flows to the north over approximately 10-15% slopes onto the existing gravel driveway in the southern portion of the site. Runoff in the southeast portion of the site sheet flows on gravel driveway and grass towards a low point along the I-405 wall on the eastern side of the site (A). From here, stormwater is assumed to infiltrate directly into the soil as no outlet exists. This observation is consistent with type A/B outwash soils found and detailed in the Geotechnical Engineering Study by Earth Solutions NW dated March 12, 2020 (Appendix A). Runoff from the southwestern portion of the site sheets flows towards Meadow Ave N where it enters the City of Renton (COR) storm system in a Type 1 CB (B) on the edge of asphalt. Runoff from the northern portion of the site sheet flows to the north and west, eventually entering Meadow Ave N and entering a Type 1 CB (C) just northwest of the site at the edge of asphalt. The southern of these two Type 1 CBs (B) outlets to the NW through a 10” DI storm pipe into a Type 2 CB approximately 12 feet away (D). From here, stormwater flows to the north through an 18” Poly storm pipe (E) into another Type 2 CB (F). This Type 2 CB collects stormwater from the Type 1 CB (C) just northwest of the site via an 8” DI storm pipe. Stormwater continues north on Meadow Ave N through a series of Type 2 CBs and 18” Poly storm pipe. It turns to the west when it reaches the intersection of Meadow Ave N and N 40th St, and runs westward on N 40th St downhill towards lake Washington. Stormwater continues through a series of Type 2 CBs and 18” poly pipe, through the intersection of N 40th St and Park Ave N, to the intersection of N 40th St and Wells Ave N. The Type 2 CB in this location (G) is where the analysis was completed, just over ¼ mile downstream of the site. Please refer to Figure 7 on the previous page, for the approximate location of identified drainage features. If conveyance system nuisance, severe erosion, severe flooding, or wetland hydrology problems are identified downstream of the site under Core Requirement #2, additional impact analysis and/or mitigation may be required. As discussed in Task 2, there have been no recent significant drainage complaints within a quarter-mile downstream of the site. As no existing drainage or conveyance issues have been recently identified, further impact analysis and mitigation of the downstream stormwater system is not required. Please refer to the conveyance analysis in Section V of this TIR for additional discussion and evaluation of the on-site conveyance system capacity. Photographs from the site visit are included on the pages that follow. Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 14 Element A- Low point on eastern side of site by I-405 Wall Element B- Type 1 CB on Meadow Ave N collecting runoff from southern site frontage and yard Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 15 Element C- Type 1 CB on Meadow Ave N collecting water from the northern site frontage and yard Element G- Type 2 CB on N 40th St Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 16 IV. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN Part A: Existing Site Hydrology The 25,536 SF (0.59 AC) site is currently developed with a single-family residence accessed from Meadow Ave N via two gravel driveways on the west side of the site. The property is located within the May Creek drainage basin. Stormwater runoff currently leaves the site at a single natural discharge location at the northwest corner creating one Threshold Discharge Area for the site. The majority of the site gently slopes at approximately 2%, allowing stormwater to sheet flow northwest into Meadow Ave. A cleared area on the adjacent parcel 334270-0630 is tributary to the site. This off-site area and sheet flows to the north over approximately 10-15% slopes onto the existing gravel driveway in the southern portion of the site. See full downstream analysis in Section III of this Technical Information Report (TIR). Soil explorations detailed in the Geotechnical Engineering Study by Earth Solutions NW dated March 12, 2020 (Appendix A) encountered primarily medium dense silty sand and poorly graded sand. An in-situ infiltration test was performed and a design infiltration rate of 5 inches per hour was determined by the Geotech, which is suitable for stormwater infiltration. WWHM 2012 was used to model the existing condition within the 27,320 SF (0.627 AC) limits of disturbance using existing surfaces found on site including rooftop, driveway, lawn and walkways. See the summary of existing and developed analyses on the following pages, as well as the existing conditions map provided as Figure 4 for more details. Part B: Developed Site Hydrology The project proposes the development of three (3) single-family lots within the 25,536 SF (0.59 Acres) parcel, as well as a 7.5-foot right-of-way dedication with frontage improvements. Lot 1 is 8,230 SF (0.19 AC) and is located in the north portion of the site. Lot 2 is 8,043SF (0.18 Acres) and is located in the central portion of the site. Lot 3 is 7,868 SF (0.18 AC) and is located in the southern portion of the site. All three (3) lots will have driveway access off of Meadow Ave N. Frontage improvements will include the addition of a 5-foot sidewalk, 8-foot planter strip, as well as curb and gutter along the edge of asphalt roadway. Stormwater runoff from the proposed development of Lots 1-3 will be managed as follows: · Lot 1: Stormwater BMP’s satisfying Core Requirement #9 will be used to the maximum extent feasible to mitigate new runoff created by the proposed single-family residence and other impervious surfaces on-site. A 30’x9’ gravel filled full infiltration trench is proposed on Lot 1 to the west of the proposed structure to mitigate stormwater from impervious areas. This report assumes that the maximum impervious surface per zoning (4,527 SF) will be conveyed to this infiltration trench. Additionally, an emergency overflow to the public storm system from the infiltration trench will be provided. · Lot 2: Stormwater BMP’s satisfying Core Requirement #9 will be used to the maximum extent feasible to mitigate new runoff created by the proposed single-family residence and other impervious surfaces on-site. A 30’x9’ gravel filled full infiltration trench is proposed on Lot 2 to the west of the proposed structure to mitigate stormwater from impervious areas. This report assumes that the maximum impervious surface per zoning (4,424 SF) will be conveyed to this infiltration trench. Additionally, an emergency overflow to the public storm system from the infiltration trench will be provided. Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 17 · Lot 3: Stormwater BMP’s satisfying Core Requirement #9 will be used to the maximum extent feasible to mitigate new runoff created by the proposed single-family residence and other impervious surfaces on-site. A 30’x9’ gravel filled full infiltration trench is proposed on Lot 3 to the west of the proposed structure to mitigate stormwater from impervious areas. This report assumes that the maximum impervious surface per zoning (4,327 SF) will be conveyed to this infiltration trench. Additionally, an emergency overflow to the public storm system from the infiltration trench will be provided. WWHM 2012 was used to model the proposed condition as follows: · Lot 1: The modeled limits of disturbance for Lot 1 is 8,230 SF. The maximum impervious surface per R-6 zoning of 4,527 SF was assumed, with the entirety of this area being conveyed to the full infiltration trench. Per Table 1.2.9.A in the RSWDM, the area going to full infiltration can be subtracted from the model. The remaining 3,703 SF of pervious surface on Lot 1 will meet soil amendment requirement as detailed in Section C.2.13 of the RSWDM; therefore, it has been modeled as 100% pasture with flat slopes in type A/B soils. · Lot 2: The modeled limits of disturbance for Lot 2 is 8,043 SF. The maximum impervious surface per R-6 zoning of 4,424 SF was assumed, with the entirety of this area being conveyed to the full infiltration trench. Per Table 1.2.9.A in the RSWDM, the area going to full infiltration can be subtracted from the model. The remaining 3,619 SF of pervious surface on Lot 1 will meet soil amendment requirement as detailed in Section C.2.13 of the RSWDM; therefore, it has been modeled as 100% pasture with flat slopes in type A/B soils. · Lot 3: The modeled limits of disturbance for Lot 3 is 7,868 SF. The maximum impervious surface per R-6 zoning of 4,327 SF was assumed, with the entirety of this area being conveyed to the full infiltration trench. Per Table 1.2.9.A in the RSWDM, the area going to full infiltration can be subtracted from the model. The remaining 3,541 SF of pervious surface on Lot 1 will meet soil amendment requirement as detailed in Section C.2.13 of the RSWDM; therefore, it has been modeled as 100% pasture with flat slopes in type A/B soils. · ROW Dedication & Road Widening: The modeled limits of disturbance for the ROW dedication area and road widening is 2,995 SF. This will include 838 SF of sidewalk, 768 SF of driveway entrance as well as 485 SF of asphalt road repair. The remaining 904 SF of pervious surface will meet soil amendment requirement as detailed in Section C.2.13 of the RSWDM; therefore, it has been modeled as 100% pasture with moderate slopes in type C soils. Please refer to Core Requirement #9 in Section II of the TIR for additional discussion. A Developed Conditions Map is provided as Figure 5. A summary of the existing and developed analyses is provided in the table on the following page. Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 18 On-site + Off-Site Existing Proposed Condition Measured Modeled Measured Modeled Lawn, Mod: 14,050 SF (0.322 AC) 14,050 SF (0.322 AC) 11,850 (0.272 AC) 11,850 (0.272 AC) Pasture, Mod: Roof, Flat: 1,995 SF (0.046 AC) 1,995 SF (0.046 AC) 9,729 SF (0.223 AC) Driveway, Flat: 10,122 SF (0.232 AC) 10,122 SF (0.232 AC) 4,418 SF (0.101 AC) 768 SF (0.018 AC) Sidewalk, Flat: 719 (0.017 AC) 719 (0.017 AC) 838 SF (0.019 AC) 838 SF (0.019 AC) Road, Flat: 434 SF (0.010 AC) 434 SF (0.010 AC) 485 SF (0.011 AC) 485 SF (0.011 AC) Total Area: 27,320 SF (0.627 AC) 27,320 SF (0.627 AC) 27,320 SF (0.627 AC) 13,941 SF (0.320 AC) Part C: Performance Standards Based on the City of Renton’s flow control map, the project site is located within the Peak Rate Flow Control Standard (Existing Site Conditions). Flow control facilities are required to match the developed peak discharge rates to existing site conditions peak discharge rates for 2-, 10- and 100-year return periods. However, as determined in Part D on the following page, the site meets flow control exemption 2 per Section 1.2.3.1.B of the RSWDM, and flow control facilities are not required. Per section 1.2.9.3.1 of the RSWDM, this project is classified as a small subdivision; therefore, it is subject to the Small Road Improvement and Urban Road Improvement Project BMP Requirements detailed in Section 1.2.9.3.2 in the RSWDM. The site falls within a Basic Water Quality treatment area in accordance with Section 1.2.8.1.A of the RSWDM, however new plus replaced impervious pollution generating areas within the project site is under 5,000 SF. Therefore, water quality treatment is not required. Part D: Flow Control System As shown in the table below, the proposed stormwater BMPs result in a 0.1956 CFS decrease in the 100- year flow using 15-minutes time steps. This is below the allowable threshold of a 0.15 CFS maximum increase per Section 1.2.3.1.B of the RSWDM; therefore, the project meets flow control exemption 2. No formal flow control facilities are proposed at this time; however, flow control BMPs will be implemented as described in Core Requirement #9 in Section II of this TIR. Please refer to Appendix B for a copy of the full WWHM data output. Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 19 Part E: Water Quality System In accordance with Section 1.2.8.1.A of the RSWDM, Basic Water Quality Treatment is not required for this project as new plus replaced pollution generating impervious surfaces (PGIS) does not exceed 5,000 SF. The development results in 768 SF of concrete driveway within the ROW dedication area, 485 SF of pavement replacement within the existing ROW, and 3,700 SF of on-site driveway is estimated for the future build-out of Lots 1-3. These quantities total to 4,953 SF of PGIS that will be created or replaced as a result of this project; therefore, the project meets surface area exemption 1. V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN This project is using infiltration using the BMP prescriptive method. Rainwater infiltrates and the pipes are provided for emergency overflow. Determining the flow value will be based on one of the six infiltration trenches failing and triggering the overflow. There are two infiltration trenches per lot, so each infiltration trench will take one half of the roof area, assumed to be 2,000 SF. Using the Rational Method Q=CIA, we define the flow (Q) as being equivalent to: C = Curve Number = 0.98 I = Rain Intensity (from WA 100 yr Isopluvials) = 3.9 in/hr A = 2000 SF = .046 AC Q = 0.98*3.9*.046 = 0.18 cfs Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 20 Manning's formula is used to calculate the flow rate (Q) in open channels and pipes. The formula is: Q = A × (1.486/n) × R^(2/3) × S^(1/2) Where: · Q = Discharge (cubic feet per second, cfs) · A = Cross-sectional area of flow (square feet, ft²) · n = Manning's roughness coefficient · R = Hydraulic radius (feet) · S = Slope of the pipe (feet/feet) Parameters: Diameter of Pipe = 6 inches (0.5 ft) Slope (S)= 2% (0.02) Manning's n (PVC)= 0.009 - 0.011 Cross-sectional Area (A) For a circular pipe: A = π × (d/2)² · Diameter (d) = 0.5 ft · A = π × (0.5/2)² = π × (0.25)² = π × 0.0625 ≈ 0.1963 ft² Hydraulic Radius (R) R = A / P Where P is the wetted perimeter. For a circular pipe: P = π × d = π × 0.5 ≈ 1.57 ft · R = 0.1963 / 1.57 ≈ 0.125 ft Flow Rate Calculation Using the average Manning's n for PVC (0.010): Q = 0.1963 × (1.486/0.010) × (0.125)^(2/3) × (0.02)^(1/2) Calculating each part: · Q ≈ 0.1963 × 148.6 × 0.0502 × 0.1414 · Q ≈ 0.1963 × 148.6 × 0.00707 · Q ≈ 0.1963 × 1.051 ≈ 0.207 cfs Conclusion The maximum flow rate for a 6-inch PVC pipe at a 2% slope is approximately 0.207 cfs which exceeds the flow expected from a failed infiltration trench of 0.18 cfs. A scenario of more than one failed infiltration trench is not expected as the Operations and Maintenance Manual for the BMPs would implement the repair of the infiltration trench should any flow be observed in the overflow pipe. VI. SPECIAL REPORTS AND STUDIES · Geotechnical Engineering Study by Earth Solutions NW dated March 12, 2020 · Arborist Report/Tree Plan by Layton Tree Consulting, LLC dated February 12, 2020 Meadow Ave Short Plat Preliminary Technical Information Report 10/31/2025 P a g e | 21 VII. OTHER PERMITS · Civil Construction Permit · Final Short Plat · Building Permits · Right-of-Way Use Permit VIII. CSWPP ANALYSIS AND DESIGN See Appendix D. IX. BOND QUANTITIES, FACILITY SUMMARIES AND DECLARATION of COVENANT See Appendix E X. OPERATION AND MAINTENANCE MANUAL See Appendix F Appendix A Geotechnical Engineering Study by Earth Solutions NW dated March 12, 2020 Appendix B WWHM Output Appendix C Arborist Report/Tree Plan by Layton Tree Consulting, LLC dated February 12, 2020 Appendix D CSWPPP Analysis And Design Appendix E Bond Quantities, Facility Summaries And Declaration Of Covenant Appendix F Operation And Maintenance Manual