HomeMy WebLinkAbout02-18-2026 - Addendum No. 2 - Sr Center HVAC RoofBCRA
2106 Pacific Avenue, Suite 300
Tacoma, Washington 98402
(253) 627-4367
ADDENDUM NO. 2 PAGE 1 OF 1
Don Persson Renton Senior Activity Center: Exterior & HVAC Improvements
City of Renton (CAG-26-032)
February 18, 2026
City of Renton
Don Persson Renton Senior Activity Center
Exterior & HVAC Improvements
(CAG-26-032)
Renton, WA
ADDENDUM NO. 2
February 18, 2026
This Addendum forms a part of the Contract Documents and modifies the original Contract
Documents dated January 16, 2026 as noted below. Acknowledge receipt of this Addendum In the
space provided on the Bid Form. Failure to do so may subject Bidder to disqualification.
This Addendum is issued to all known Plan Holders.
This Addendum consists of 1 page plus attachments.
ATTACHMENTS
NOTE: Addendum changes to the Specification section is issued as a full specification section;
these changes are noted by BOLD/bold type.
1. Specification Section 01 4010 – Product Substitution Request
SPECIFICATIONS
SECTION 01 4010 – PRODUC SUBSTITUTION REQUEST
1. ADD section 01 4010 in it’s entirety.
END OF ADDENDUM NO. 2
DON PERSSON RENTON SENIOR ACTIVITY CENTER EXTERIOR & HVAC IMPROVEMENTS
DIVISION 01 – GENERAL REQUIREMENTS
SECTION 01 4010 – PRODUCT SUBSTITUTION REQUEST
Contract No. CAG-26-032 01 4010 - 1
Don Persson Renton Senior Activity Center Exterior & HVAC Improvements March 12, 2026
SECTION 01 4010 – PRODUCT SUBSTITUTION REQUEST
TO: CITY OF RENTON
Project Manager
Alisha Smothers
Email to: asmothers@rentonwa.gov
PROJECT NAME: Don Persson Renton Senior Activity Center Exterior & HVAC Improvements
CONTRACTOR:
We hereby submit for consideration the following product instead of specified item for above
project:
Section Paragraph Specified Item
Proposed Substitution:
Attach complete dimensional information and technical data, including laboratory tests, if
applicable.
Include complete information on changes to Drawings and/or Specifications, which proposed
substitution will require for its proper installation.
Submit with request all necessary samples and substantiating data to prove equal quality,
performance, and appearance to that which is specified. Clearly mark manufacturer's literature to
indicate equality performance. Differences in quality of materials and construction shall be
indicated.
Fill in blanks below:
A. Reason for substitution request:
B. Does the substitution affect dimensions shown on Drawings:
Yes No If yes, clearly indicate changes.
DON PERSSON RENTON SENIOR ACTIVITY CENTER EXTERIOR & HVAC IMPROVEMENTS
DIVISION 01 – GENERAL REQUIREMENTS
SECTION 01 4010 – PRODUCT SUBSTITUTION REQUEST
Contract No. CAG-26-032 01 4010 - 2
Don Persson Renton Senior Activity Center Exterior & HVAC Improvements March 12, 2026
C. Will the undersigned pay for changes to the design, including engineering and detailing
costs caused by the request substitution:
Yes No Comment:
D. What effect does this substitution have on other trades, other Contracts, and Contract
completion date:
E. What effect does this substitution have on applicable code requirements:
F. Differences between proposed substitution and specified item:
G. Manufacturer's guarantee of the proposed and specified items are:
Same Different (explain):
H. List of names and addresses of three similar projects on which product was used, date of
installation, and Architect/Engineer's name and address:
I. Cost and supplier of specified product:
J. Cost and supplier of proposed substitution product:
The undersigned attests function and quality equivalent or superior to specified items.
[SIGNATURE PAGE FOLLOWS]
DON PERSSON RENTON SENIOR ACTIVITY CENTER EXTERIOR & HVAC IMPROVEMENTS
DIVISION 01 – GENERAL REQUIREMENTS
SECTION 01 4010 – PRODUCT SUBSTITUTION REQUEST
Contract No. CAG-26-032 01 4010 - 3
Don Persson Renton Senior Activity Center Exterior & HVAC Improvements March 12, 2026
CERTIFICATION OF EQUAL PERFORMANCE
AND ASSUMPTION OF LIABILITY FOR
EQUAL PERFORMANCE
Submitted By:
[Signature] [Title]
[Firm]
[Address]
[Telephone] [Date]
Signature must be by person having authority to legally bind the firm to the above term.
A&E ARCHITECT/ENGINEER’S RECOMMENDATION:
Accepted: ☐ Accepted as Noted: ☐ Not Accepted: ☐ Received Too Late: ☐
By:
Date:
Remarks:
Concurrence by Architect/Engineer:
OWNER’S ACCEPTANCE:
Accepted: ☐ Accepted as Noted: ☐ Not Accepted: ☐ Received Too Late: ☐
By:
Date:
Remarks:
Concurrence by Owner:
END OF SECTION