HomeMy WebLinkAboutR-4332466co
co
W
U_
rn
CIO
CIO
(I
O
N
O
N
W
O
N
H
m
CO
'O
N
O
N
aD
O
U
O
J
�I
Q �
(.0
,I
� U
E
00 :3
Lo a
N (n
O L
m
0
N
-1- 0
�3.1 i 3.2 3.3 3.4
40' - 0" 42' - 2 3/4" 1 1 40' - 4 5/8" 41' - 9 3/8" 1
25' - 2 5/8" 27' - 6 3/4" 25' - 7 5/8" 27' - 2 3/8"
-
10' - 5 3/8" 12' - 9 3/4" 10, - 10 3/8" 12' - 4 3/8"
A I
BT120-EPD102 134 TYP /
135 N a
TYP
1 I
C3.AEE=
i
136
TYP PANTOGRAPH KIT z
E-STOP 145 (PROPOSED) FUTURE PANT APH KIT FUTUR ANTOGRAPH KIT
A F RE PANTOGRAPH KIT 116 TYP "
105
BT120-DBDC-111 TYP
BT120-DBSC-111
L EL 01 BEB CHARGING GANTRY POWER 1
S ALE: 1/8" = 1'-0" BT120-ESP401
BT120-BEB01 PC-01
BT120-BEB01 PC-01A
3.1 BT120-BEB01 PC-02 BT120-BEB01 PC-04A-, B 120-BEB01 PC-06A BT1 0-BEB01 PC-09A BT120-BEB01 PC-11 3.4
BT120-BEB01 PC-02A
BT120-BEB01 PC-04— 17 BT120-BEB01 PC-09 BT120-BEB01 PC-11A
A BT120 BEB01 PC-06
_ _ BT120-BE 01 PC-05 _ ..20-BEB01 PC-08A �BT120-BEB01 PC-10 _ _
BT120 BEB01 PC 03 BT120 BEB01 PC 12
I I
BT12 -EPD1 2 - - 'I - BT120-BEB01 PC-08 - - - -
0 0 BT120 BEB01 PC 03A BT120 BEB01 PC- 5A � BT120 BEB01 PC 10A BT120 BEB01 PC 12A
F/
I /I AI 111 11 xcii�ii 111 11 h 11 \UIr// 11 EH�'�l I I I I I I I I I I
I I I
Hill\\
� ——�
— — — — — L-L LL _U�__I
I III 'll "I "I I III III III III
I I III I� 'BT120-DBDC-111=1 11=1 11=1 11=1 11=
BT120-DBSC-111=I-I-I
1II III III I-----I
GANTRY FACING NORTH
SCALE: 1/8" = 1'-0"
PLATFORM
E
F
J K
G GANTRY
GENERAL NOTES:
1. ALL PANTOGRAPH DIM IONS TO
CENTER MOUNTIN OLE. SEE
DETAIL ON SHE BT120-EPD108.
2. SEE DW T120-EPD109 FOR ACM
CO OL BOX PENETRATION
AILS.
KEY NOTES:
105
(3)3" CONDUIT FOR AC
AUXILIARY POWER, PE WIRE AND
DATA CABLES FROM PULL BOX
BT120-HHLV-09 OR
BT1 20-HHLV-1 1 TO FUTURE
CHARGING ACM CONTROL
MODULE ON GANTRY VERTICAL
STRUCTURE. CONDUIT STUB UP
AT GANTRY SHALL BE
PROTECTED WITH CONDUIT CAP.
116
PROVIDE GROUND FAULT
PROTECTION FOR ALL
BREAKERS 1000A OR MORE AND
150V TO GROUND OR MORE AS
REQUIRED PER NEC 230.95.
134
CHARGING ACM CONTROL
MODULE KITS.
135
10L"X10W"X24"H NETWORK
CONDUIT PULL BOX.
136
24L"X18W"X24"H DC POWER
CONDUIT PULL BOX.
145
E-STOP FOR DISCONNECTING
POWER TO PANTOGRAPHS.
COORDINATE E-STOP QUANTITY
AND LOCATION WITH KCM AND
MANUFACTURER PRIOR TO
ROUGH -IN.
H 8 4 0 8 16
CORE
FACILITY EQUIP YARD
SCALE IN FEE
KEY PLAN
DEVELOPMENT ENGINEER
R-4332466
msippo 11 /25/2025
DESIGNED BY: SCALE: DRAWING NO.:
D. TAFTFARREN Q w 1/8"=1'-0" STRIDE BUS RAPID TRANSIT
DRAWN BY: U FILENAME: SOUTH RENTON TRANSIT CENTER BT120-EPP231
E. HAJAS .JaCO S,45 Cn Cn
w J S1-BT120-E-v2020 BT105 FACILITY ID:
CHECKED BY: BRT General Engineering Consultant z " SOUNDTRANSIT CONTRACT No.: ELECTRICAL BT120
1 06/13/2025 EH DA DT ADDENDUM #1 D. ANDERSON RTA/CN 0205-24 SHEET No: REV:
0 12/10/2024 EH DA DT ISSUED FOR BID APPROVED BY: SUBMITTED BY: DATE: REVIEWED BY: DATE: SUBMITTAL DATE: POWER PLAN AND SECTION
BEB CHARGING GANTRY 544 1
No. DATE DSN CHK APP REVISION D. TAFTFARREN R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024