Loading...
HomeMy WebLinkAboutR-4332466co co W U_ rn CIO CIO (I O N O N W O N H m CO 'O N O N aD O U O J �I Q � (.0 ,I � U E 00 :3 Lo a N (n O L m 0 N -1- 0 �3.1 i 3.2 3.3 3.4 40' - 0" 42' - 2 3/4" 1 1 40' - 4 5/8" 41' - 9 3/8" 1 25' - 2 5/8" 27' - 6 3/4" 25' - 7 5/8" 27' - 2 3/8" - 10' - 5 3/8" 12' - 9 3/4" 10, - 10 3/8" 12' - 4 3/8" A I BT120-EPD102 134 TYP / 135 N a TYP 1 I C3.AEE= i 136 TYP PANTOGRAPH KIT z E-STOP 145 (PROPOSED) FUTURE PANT APH KIT FUTUR ANTOGRAPH KIT A F RE PANTOGRAPH KIT 116 TYP " 105 BT120-DBDC-111 TYP BT120-DBSC-111 L EL 01 BEB CHARGING GANTRY POWER 1 S ALE: 1/8" = 1'-0" BT120-ESP401 BT120-BEB01 PC-01 BT120-BEB01 PC-01A 3.1 BT120-BEB01 PC-02 BT120-BEB01 PC-04A-, B 120-BEB01 PC-06A BT1 0-BEB01 PC-09A BT120-BEB01 PC-11 3.4 BT120-BEB01 PC-02A BT120-BEB01 PC-04— 17 BT120-BEB01 PC-09 BT120-BEB01 PC-11A A BT120 BEB01 PC-06 _ _ BT120-BE 01 PC-05 _ ..20-BEB01 PC-08A �BT120-BEB01 PC-10 _ _ BT120 BEB01 PC 03 BT120 BEB01 PC 12 I I BT12 -EPD1 2 - - 'I - BT120-BEB01 PC-08 - - - - 0 0 BT120 BEB01 PC 03A BT120 BEB01 PC- 5A � BT120 BEB01 PC 10A BT120 BEB01 PC 12A F/ I /I AI 111 11 xcii�ii 111 11 h 11 \UIr// 11 EH�'�l I I I I I I I I I I I I I Hill\\ � ——� — — — — — L-L LL _U�__I I III 'll "I "I I III III III III I I III I� 'BT120-DBDC-111=1 11=1 11=1 11=1 11= BT120-DBSC-111=I-I-I 1II III III I-----I GANTRY FACING NORTH SCALE: 1/8" = 1'-0" PLATFORM E F J K G GANTRY GENERAL NOTES: 1. ALL PANTOGRAPH DIM IONS TO CENTER MOUNTIN OLE. SEE DETAIL ON SHE BT120-EPD108. 2. SEE DW T120-EPD109 FOR ACM CO OL BOX PENETRATION AILS. KEY NOTES: 105 (3)3" CONDUIT FOR AC AUXILIARY POWER, PE WIRE AND DATA CABLES FROM PULL BOX BT120-HHLV-09 OR BT1 20-HHLV-1 1 TO FUTURE CHARGING ACM CONTROL MODULE ON GANTRY VERTICAL STRUCTURE. CONDUIT STUB UP AT GANTRY SHALL BE PROTECTED WITH CONDUIT CAP. 116 PROVIDE GROUND FAULT PROTECTION FOR ALL BREAKERS 1000A OR MORE AND 150V TO GROUND OR MORE AS REQUIRED PER NEC 230.95. 134 CHARGING ACM CONTROL MODULE KITS. 135 10L"X10W"X24"H NETWORK CONDUIT PULL BOX. 136 24L"X18W"X24"H DC POWER CONDUIT PULL BOX. 145 E-STOP FOR DISCONNECTING POWER TO PANTOGRAPHS. COORDINATE E-STOP QUANTITY AND LOCATION WITH KCM AND MANUFACTURER PRIOR TO ROUGH -IN. H 8 4 0 8 16 CORE FACILITY EQUIP YARD SCALE IN FEE KEY PLAN DEVELOPMENT ENGINEER R-4332466 msippo 11 /25/2025 DESIGNED BY: SCALE: DRAWING NO.: D. TAFTFARREN Q w 1/8"=1'-0" STRIDE BUS RAPID TRANSIT DRAWN BY: U FILENAME: SOUTH RENTON TRANSIT CENTER BT120-EPP231 E. HAJAS .JaCO S,45 Cn Cn w J S1-BT120-E-v2020 BT105 FACILITY ID: CHECKED BY: BRT General Engineering Consultant z " SOUNDTRANSIT CONTRACT No.: ELECTRICAL BT120 1 06/13/2025 EH DA DT ADDENDUM #1 D. ANDERSON RTA/CN 0205-24 SHEET No: REV: 0 12/10/2024 EH DA DT ISSUED FOR BID APPROVED BY: SUBMITTED BY: DATE: REVIEWED BY: DATE: SUBMITTAL DATE: POWER PLAN AND SECTION BEB CHARGING GANTRY 544 1 No. DATE DSN CHK APP REVISION D. TAFTFARREN R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024