HomeMy WebLinkAboutR-4332472N
co
co
W
C�
J
LL
O
co
co
01
0
N
O
N
W
N
H
m
'o
N
O
N
aD
0
I
U
0
J
I
Q
ry
N ,I
� U
E
00 :3
Lo a
N U)
O L
a�
N U)
0
N
-1- U
KEY NOTES:
125 THE LIGHTNING PROTECTION SYS IS A
DEFERRED DESIGN BY THE LI NING
PROTECTION SYSTEM CO ACTOR.
PROVIDE LIGHTNING P TECTION SYSTEM
SEE SPECIFICATIO FOR ADDITIONAL
REQUIREMENT .
3.1 3.2 3.3 3.4
I I I
#1/0 CU BARE COPPER GROUND /
#1/0 CU BARE COPPER GROUND LOOP BURIED MINIMUM 30" #1/0 CU BARE COPPER GROUND
LOOP BURIED MINIMUM 30 / BELOW FINISHED GRADE.
BELOW FINISHED GRADE. / = LOOP BURIED MINIMUM 30"
3 / BELOW FINISHED GRADE.
( )
REBAR (TYP) REBARTYP � � � � � � � BT�120-EPD 112
125 �G _ , / G/ (TYP) / REBAR (TYP) G
J L — L G L L/� c� J / — J /� L — i L _J G--*
3.113 10 4 L0 -jG
G G 71DELETED
Q G—G
24 � 6
I
BT120-EPD111 BT120-EPD111 BT120-EPD111
- (TYP) (TYP) (TYP)
I I
1
06/13/2025
EH
DA
DT
ADDENDUM #1
0
12/10/2024
EH
DA
DT
ISSUED FOR BID
No.
DATE
DSN
CHK
APP
REVISION
DESIGNED BY:
D. TAFTFARREN
DRAWN BY:
E. HAJAS
CHECKED BY:
D.ANDERSON
APPROVED BY:
D. TAFTFARREN
.;acobs
SUBMITTED BY:
R. PARGAS
4b5TmRIDE
BRT General Engineering Consultant
DATE: REVIEWED BY:
12/10/2024 J. ALTCHECH
SCALE:
Q
w
M;Vr
1/8" = 1'-0"
Q
FILENAME:
U)
w
cn
J
S 1-BT120-E-v2020
z
J
U_
SOUNDTRANSIT
CONTRACT No.:
RTA/CN 0205-24
DATE:
SUBMITTAL DATE:
12/10/2024
12/10/2024
q
Ar
C I D�
PLATFORM
E
F IL J K
G GANTRY
H
CORE
FACILITY EQUIP YARD
,L / KEY PLAN
R-4332472
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
ELECTRICAL
GROUNDING PLAN
BEB CHARGING GANTRY
N
8 4 0
8 16
SCALE IN FEE
DEVELOPMENT ENGINEER
msippo 11 /25/2025
' DRAWING NO.:
BT120-EGS103
FACILITY ID:
BT120
SHEET No: REV:
550 1