Loading...
HomeMy WebLinkAboutR-4332473N co co W J LL O cv co (I 0 N O N W O N H m C0 'o N O N U) (D O U O J �I Q � oCY) ,I ti U 115� E 00 :3 Lo a N (n O L m 0 N � U 1 (TYP) BT12� 111 G�L7 F L,— J 2 BT120-EPD111 (TYP) REBAR (TYP) 4 BT120-EPD 111 (TYP) �G 0 3 � BT120-EPD112 (TYP) 0.- TFQ�L- 7 -G G L —1G T r •. 3 4.3 4.4 4.5 BT 120-EPD111 (TYP) I I V Gi I I a;o 000a oa�Q aaoa oa a o000 _ DELETED #4/0 CU BARE COPPER GROUND LOOP BURIED MINIMUM 30" BELOW FINISHED GRADE. q Ar C d' PLATFORM E F J K G GANTRY H CORE FACILITY EQUIP YARD 4 2 0\ 4 8 SCALE IN FEE KEY PLAN [77=NGINEER R-4332473 msi25/2025 DESIGNED BY: SCALE: DRAWING NO.: D. TAFTFARREN Q w 1/4" = 1'-0" STRIDE BUS RAPID TRANSIT DRAWN BY: U FILENAME: SOUTH RENTON TRANSIT CENTER BT120-EGS104 I. KARNAS U) .Jacobs wRIDE L/) J S1-BT120-E-v2020 BT105 FACILITY ID: CHECKED BY: BRT General Engineering Consultant J SOUNDTRANSIT CONTRACT No.: ELECTRICAL BT120 1 06/13/2025 EH DA DT ADDENDUM #1 D. ANDERSON RTA/CN 0205-24 SHEET No: REV: 0 12/10/2024 EH DA DT ISSUED FOR BID APPROVED BY: SUBMITTED BY: DATE: REVIEWED BY: DATE: SUBMITTAL DATE: GROUNDING PLAN No. DATE DSN CHK APP REVISION D. TAFTFARREN R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 BEB EQUIPMENT YARD 551 1