UTILITY
CUSTOMER
M PSE UTILITY METER
KCM SERVICE
BT120-T-100
p PSE - ST
_Ly PAD MOUNTED
TRANSFORMER
SIZE TO BE
DETERMINED BY PSE
PROVIDE SECONDARY
FEEDER SIZE, QUANTITY
AND WIRING METHOD
AS REQUIRED PER PSE
600/3 "
MAIN BREAKER
2" CONDUIT STUBBED TO
ROOF AND CAPPED FOR
SOLAR READINESS
M )� PSE UTILITY METER
ST SERVICE
DPM b
125/3) 400/3) 43 )
Q BT120-SWGR-01, 480/277V, 3PH, 600A, 65kAIC Q o
60/3 v) 70/3 v) 400/3) 200/3 )
N
G
3/0 C U 11 8
GEC FSPD 3
p
75kVAKCM-T-02
75kVA
YrTSTEP
480V - 208Y/120V
DOWN
TRANSFORMER
U
KCM PANEL KCM-PB2-02
208/120V 3P4W
100/2)
100/3) 200A BUS
Q
Q 200A MCB
22KAIC
13
KCM-PB2-04
KCM
208/120V 3P 4W
TELECOMM
100A BUS
PANEL
10KAIC
KCM-MBP-01
n
T_100/�27
8KW
UPS
TELE
KCM-UPS-1
208/120V 2P 3W
SCALABE UP TO 16KW
C130
T-02
p 45kVA5kVA, 3PH
480V - 208Y/120V
-Ey STEP DOWN
T5TRANSFORMER
EV PANEL
BT120-PB2-06
208V/120V
3P4W 125A
MCB
22KAIC
BT120-PB4-01
480/277V 3P4W
100A
22KAIC
13
KCM
PLATFOR
M PANEL
KCM-PB2-03
208/120V 2P3W
100A BUS
90A MCB
10KAIC
ELECTRICAL BT120-LCP-01
ROOM
LIGHTING
CONTROLLER
1
06/13/2025
EH
DA
DT
ADDENDUM #1
0
12/10/2024
EH
DA
DT
ISSUED FOR BID
No.
DATE
DSN
CHK
APP
REVISION
BT120-ATS-01
480/277V 3PH
400A
4-POLE
zkm�
11
BT120-SWBD-01, 480/277V, 3PH, 400A, 65kAIC
100/3) 250/3 )
T
9
BT120-T-01
SITE p 150kVA, 3PH
LIGHTING & 480V - 208Y/120V
PERMANENT STEP DOWN
LOAD PANEL TRANSFORMER
( 00
BT1 20-SWBD-02. 208/12OV. 3PH. 400A. 65kAIC
100/3 )
m
SECURITY
PANEL
BT120-PB2-01
208/120V 3P4W
100A
22KAIC
DESIGNED BY:
D. TAFTFARREN
DRAWN BY:
E. HAJAS
CHECKED BY:
D.ANDERSON
APPROVED BY:
D. TAFTFARREN
400/3 )
KEY NOTES:
130 480V LIGHTING CIRCUITS TO INDIVIDUALLY
FEED THROUGH SEPARATE LIGHTING
CONTROLLER CONTACTORS.
131 120V LIGHTING CIRCUITS TO INDIVIDUALLY
FEED THROUGH SEPARATE LIGHTING
CONTROLLER CONTACTORS.
1
200/3) 175/3
7
BT120-GEN-01
30OKW/375KVA
3PH, 480/277V
STANDBY
GENERATOR
G _ 3/0 CU
GEC
400/3) 200/3
(111
ST PANEL BT120-PB2-03
208/120V 3P4W
100/3) 200A
0 22KAIC
BT120-PB2-05
ST 208/120V 3P 4W
TELECOMM 100A BUS
PANEL 10KAIC
I I
20KW
6 UPS
TELE
BT120-UPS-01
208/120V 3P 4W
SCALABE UP TO 40KW
L— — — — — — — —
pacobs
�57079
R�GISTEY- ww
�sSIONAL E��� SUBMITTED BY: DATE:
6113125 R. PARGAS 12/10/2024
FEEDER SCHEDULE
ID
FEEDER
AMPS
CONDUIT AND FEEDER
FEEDING THESE DEVICES
1O
20
1 /2"C,3#12,#12G
FACP
O2
60
1 "C,3#4,#4N,#10G
LCP, BT120-PB2-04
O3
100
1-1 /4"C,3#1,#8G
BT120-T-02
O4
100
1-1 /2"C,3#1,#1 N,#8G
O5
125
2"C,3#1/0,#1/ON,#6G
BT120-PB2-05, BT120-PB2-06, KCM-T-022-04, KCM-PB2-04
O6
175
2"C,3#2/0,#2/ON,#6G
BT120-MBP-01, BT120-PB2-02
O7
200
2"C,3#3/0,#3/ON,#6G
BT120-PB2-03
O8
200
2-1/2"C WITH PULLSTRING
FUTURE BT120-SWBD-03, FUTURE BT120-ATS-02
O9
250
2"C,3#250kcmil,#4G
BT120-T-01
10
400
(2)2-1/2"C,3#3/0,#3/0N,#1/0G
BT120-SWBD-02
11
400
(2)2-1/2"C,3#4/0,#4/ON,#2G
BT120-ATS-01, BT120-SWBD-01
12
200
2"C,3#3/0,#3/ON,#4G
KCM-PB2-02
13
100
1-1 /2"C,2#1,#1 N,#8G
KCM-PB2-03, KCM-MBP-01
14
125
2"C, 3#1 /0, #6G
KCM-T-02
SOME FEEDERS SIZES INCREASED FOR VOLTAGE DROP MITIGATION. CONTRACTOR RESPONSIBLE TO
ENSURE WIRE
BENDING SPACE AND TERMINATIONS ARE ADEQUATE
ST UPS 90/3 ) 90/3
PANEL
100/3
BT120-PB2-02 4
208/120V 3P4W
22KAIC S BT120-PB2-04
ST 208/120V 3P4W M z
PLATFORM 100A BUS
PANEL 100A MCB BT120-EL-1 BT120-EL-2
10KAIC 480V 3PH 480V 3PH
131 40HP 40HP
4STmRIDE
BRT General Engineering Consultant
REVIEWED BY:
J. ALTCHECH
BT120-LCP-02
PLATFORM
LIGHTING
CONTROLLER
SCALE:
Q
w
mrr
NTS
Q
FILENAME:
U)�
w
J
S 1-BT120-E-v2020
z
U_
SOUNDTRANSIT
CONTRACT No.:
RTA/CN 0205-24
DATE:
SUBMITTAL DATE:
12/10/2024
12/10/2024
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
ELECTRICAL
CORE FACILITES ONE -LINE
NE 145TH ST TO 98TH AVE NE
I
I
I
I
I
I
I
I
I
I
I
I
I
I
R-4332487
DEVELOPMENT ENGINEERING
-r
msippo 11 /25/2025
DRAWING NO.:
BT120-EPS102
FACILITY ID:
BT120
SHEET No: REV:
565 1