HomeMy WebLinkAboutR-4332493N
co
co
i
w
0
N
O
N
IiI
0
N
H
m
co
U
u.1
C�
I
H
V)
Z
Q
H
I
0
a-
ry
I
D
m
0
I
0
co
00
LO
� M
0-o
I
�a
ai3:
U)
N �
L
N O
O �p
N cy)
co �
N _
co m
PANELBOARD: BT120-SWBD-01
LOCATION: ELECTRICAL ROOM VOLTAGE: 480/277 INTERRUPTING RATING (kA SYMMETRICAL): 65
SUPPLY FROM: BT120-SWGR-01 VIA BT120-ATS-01 BUS AMPS: 400 GROUND BUS: FULL
MOUNTING: SURFACE 400 MLO NEUTRAL BUS RATING: FULL
ENCLOSURE: NEMA 1 SUBFEED LUGS: N/A
INTEGRAL SPD: YES
NOTES LOAD DESCRIPTIONS FRAME TRIP POLES CKT NO A B C A B C CKT POLES TRIP FRAME DESCRIPTIONS LOAD NOTES
TYPE AMPS AMPS TYPE
SPD 30 3 1 34850 VA 2 3 250 BT120-SWBD-02 VIA BT120-T-01 D
- - - 3 33454 VA 4 - - - D
-
-
-
5
33071 VA
6
-
-
-
D
L
BT120-PB4-01
100
3
7
10815 VA
8
L
-
-
-
9
8263 VA
10
L
-
-
-
11
7578 VA
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
TOTAL CONNECTED LOAD / PHASE:
45665 VA
41716 VA
40649 VA
LOAD CLASSIFICATIONS CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND TOTAL LOAD SUMMARY
RECEPTACLE
0.00
50%>10K
0
LOAD (kVA)
CURRENT (AMPS)
LIGHTING
26655.00
125%
33319 VA
CONNECTED LOAD:
128030 VA
CONNECTED CURRENT:
154
CONTINUOUS
0.00
125%
0 VA
ESTIMATED DEMAND LOAD:
134693.45
ESTIMATED DEMAND CURRENT:
162
NON -CONTINUOUS, HVAC, CYCLING
0.00
100%
0 VA
ESTIMATED DEMAND FACTOR:
1.05
LARGEST MOTOR
0.00
125%
0 VA
SPARE CAPACITY:
NON -COINCIDENTAL
0.00
0%
0 VA
DIVERSIFIED (MIXED LOADS PER NEC INCLUDED ABOVE)
101374.70
100%
101375 VA
ESTIMATED CURRENT WITH SPARE:
ESTIMATED LOAD WITH SPARE:
PANELBOARD NOTES: SPD BREAKER SIZED PER MANUFACTURER'S RECOMMENDATION.
PANELBOARD: BT120-PB4-01
LOCATION: ELECTRICAL ROOM VOLTAGE: 480/277 INTERRUPTING RATING (kA SYMMETRICAL): 14
SUPPLY FROM: BTM01-SWBD-01 BUS AMPS: 100 GROUND BUS: FULL
MOUNTING: SURFACE 100 MLO NEUTRAL BUS RATING: FULL
ENCLOSURE: NEMA 1 SUBFEED LUGS: N/A
INTEGRAL SPD: NO
NOTES LOAD DESCRIPTIONS FRAME TRIP POLES CKT NO A 2 B C A B C CKT POLES TRIP FRAME DESCRIPTIONS LOAD NOTES
TYPE AMPS AMPS TYPE
L SITE LIGHTING 20 2 1 3108 VA 2785 VA 2 2 20 SITE LIGHTING L
L - - - 3 3128 VA 2785 VA 4 - - - L
L
SITE LIGHTING
20
2
5
6
2500 VA
6
2
20
SITE LIGHTING
L
L
-
-
-
7
2565 VA
2500 VA
8
-
-
-
L
L
SITE LIGHTING
20
2
9
518 VA
1995 VA
10
2
20
SITE LIGHTING
L
L
-
-
-
11
518 VA
1995 VA
12
-
-
-
L
SPARE
20
2
13
14
2
20
SPARE
-
-
-
15
1
16
-
-
-
SPARE
20
2
17
18
2
20
SPARE
-
-
-
19
20
-
-
-
SPARE
20
1
21
22
1
20
SPARE
SPARE
20
1
23
24
1
20
SPARE
SPARE
20
1
25
26
1
20
SPARE
SPARE
20
1
27
28
1
20
SPARE
SPARE
20
1
29
30
1
20
SPARE
SPARE
20
1
31
32
1
20
SPARE
33
34
35
36
37
38
39
40
41
42
TOTAL CONNECTED LOAD / PHASE:
10958 VA
8405 VA
7578 VA
LOAD CLASSIFICATIONS CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND TOTAL LOAD SUMMARY
RECEPTACLE 0.00 50%>10K 0 LOAD (kVA) CURRENT (AMPS)
LIGHTING
26940.00
125%
33675 VA
CONNECTED LOAD:
26940 VA
CONNECTED CURRENT:
32
CONTINUOUS
0.00
125%
0 VA
ESTIMATED DEMAND LOAD:
33675
ESTIMATED DEMAND CURRENT:
41
NON -CONTINUOUS, HVAC, CYCLING
0.00
100%
0 VA
ESTIMATED DEMAND FACTOR:
1.25
LARGEST MOTOR
0.00
125%
0 VA
SPARE CAPACITY:
NON -COINCIDENTAL
0.00
0%
0 VA
DIVERSIFIED (MIXED LOADS PER NEC INCLUDED ABOVE)
0.00
100%
0 VA
ESTIMATED CURRENT WITH SPARE:
ESTIMATED LOAD WITH SPARE:
PANELBOARD NOTES:
2
06/27/2025
EH
DA
I DT
ADDENDUM #2
1
06/13/2025
JS
DA
DT
ADDENDUM #1
0
12/10/2024
EH
DA
DT
ISSUED FOR BID
No. I DATE I DSN I CHK I APP I REVISION
DESIGNED BY:
D. TAFTFARREN
DRAWN BY:
E. HAJAS
CHECKED BY:
D.ANDERSON
APPROVED BY:
D. TAFTFARREN
; .acobs
SUBMITTED BY:
6/27/25 R. PARGAS
STmRIDE
BRT General Engineering Consultant
DATE: REVIEWED BY:
12/10/2024 J. ALTCHECH
QUJ
J
Q
Lnco
W J
Z J
SOUNDTRANSIT
DATE:
12/10/2024
SCALE:
NTS
FILENAME:
S 1-BT120-E-v2020
CONTRACT No.:
RTA/CN 0205-24
SUBMITTAL DATE:
12/10/2024
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
ELECTRICAL
ST PANEL SCHEDULES
SOUTH RENTON TRANSIT CENTER
R-4332493
DEVELOPMENT ENGINEERING
msippo 11 /25/2025 U1
DRAWING NO.:
BT120-EPS113
FACILITY ID:
BT120
SHEET No: REV:
571 2