Loading...
HomeMy WebLinkAboutR-4332493N co co i w 0 N O N IiI 0 N H m co U u.1 C� I H V) Z Q H I 0 a- ry I D m 0 I 0 co 00 LO � M 0-o I �a ai3: U) N � L N O O �p N cy) co � N _ co m PANELBOARD: BT120-SWBD-01 LOCATION: ELECTRICAL ROOM VOLTAGE: 480/277 INTERRUPTING RATING (kA SYMMETRICAL): 65 SUPPLY FROM: BT120-SWGR-01 VIA BT120-ATS-01 BUS AMPS: 400 GROUND BUS: FULL MOUNTING: SURFACE 400 MLO NEUTRAL BUS RATING: FULL ENCLOSURE: NEMA 1 SUBFEED LUGS: N/A INTEGRAL SPD: YES NOTES LOAD DESCRIPTIONS FRAME TRIP POLES CKT NO A B C A B C CKT POLES TRIP FRAME DESCRIPTIONS LOAD NOTES TYPE AMPS AMPS TYPE SPD 30 3 1 34850 VA 2 3 250 BT120-SWBD-02 VIA BT120-T-01 D - - - 3 33454 VA 4 - - - D - - - 5 33071 VA 6 - - - D L BT120-PB4-01 100 3 7 10815 VA 8 L - - - 9 8263 VA 10 L - - - 11 7578 VA 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 TOTAL CONNECTED LOAD / PHASE: 45665 VA 41716 VA 40649 VA LOAD CLASSIFICATIONS CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND TOTAL LOAD SUMMARY RECEPTACLE 0.00 50%>10K 0 LOAD (kVA) CURRENT (AMPS) LIGHTING 26655.00 125% 33319 VA CONNECTED LOAD: 128030 VA CONNECTED CURRENT: 154 CONTINUOUS 0.00 125% 0 VA ESTIMATED DEMAND LOAD: 134693.45 ESTIMATED DEMAND CURRENT: 162 NON -CONTINUOUS, HVAC, CYCLING 0.00 100% 0 VA ESTIMATED DEMAND FACTOR: 1.05 LARGEST MOTOR 0.00 125% 0 VA SPARE CAPACITY: NON -COINCIDENTAL 0.00 0% 0 VA DIVERSIFIED (MIXED LOADS PER NEC INCLUDED ABOVE) 101374.70 100% 101375 VA ESTIMATED CURRENT WITH SPARE: ESTIMATED LOAD WITH SPARE: PANELBOARD NOTES: SPD BREAKER SIZED PER MANUFACTURER'S RECOMMENDATION. PANELBOARD: BT120-PB4-01 LOCATION: ELECTRICAL ROOM VOLTAGE: 480/277 INTERRUPTING RATING (kA SYMMETRICAL): 14 SUPPLY FROM: BTM01-SWBD-01 BUS AMPS: 100 GROUND BUS: FULL MOUNTING: SURFACE 100 MLO NEUTRAL BUS RATING: FULL ENCLOSURE: NEMA 1 SUBFEED LUGS: N/A INTEGRAL SPD: NO NOTES LOAD DESCRIPTIONS FRAME TRIP POLES CKT NO A 2 B C A B C CKT POLES TRIP FRAME DESCRIPTIONS LOAD NOTES TYPE AMPS AMPS TYPE L SITE LIGHTING 20 2 1 3108 VA 2785 VA 2 2 20 SITE LIGHTING L L - - - 3 3128 VA 2785 VA 4 - - - L L SITE LIGHTING 20 2 5 6 2500 VA 6 2 20 SITE LIGHTING L L - - - 7 2565 VA 2500 VA 8 - - - L L SITE LIGHTING 20 2 9 518 VA 1995 VA 10 2 20 SITE LIGHTING L L - - - 11 518 VA 1995 VA 12 - - - L SPARE 20 2 13 14 2 20 SPARE - - - 15 1 16 - - - SPARE 20 2 17 18 2 20 SPARE - - - 19 20 - - - SPARE 20 1 21 22 1 20 SPARE SPARE 20 1 23 24 1 20 SPARE SPARE 20 1 25 26 1 20 SPARE SPARE 20 1 27 28 1 20 SPARE SPARE 20 1 29 30 1 20 SPARE SPARE 20 1 31 32 1 20 SPARE 33 34 35 36 37 38 39 40 41 42 TOTAL CONNECTED LOAD / PHASE: 10958 VA 8405 VA 7578 VA LOAD CLASSIFICATIONS CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND TOTAL LOAD SUMMARY RECEPTACLE 0.00 50%>10K 0 LOAD (kVA) CURRENT (AMPS) LIGHTING 26940.00 125% 33675 VA CONNECTED LOAD: 26940 VA CONNECTED CURRENT: 32 CONTINUOUS 0.00 125% 0 VA ESTIMATED DEMAND LOAD: 33675 ESTIMATED DEMAND CURRENT: 41 NON -CONTINUOUS, HVAC, CYCLING 0.00 100% 0 VA ESTIMATED DEMAND FACTOR: 1.25 LARGEST MOTOR 0.00 125% 0 VA SPARE CAPACITY: NON -COINCIDENTAL 0.00 0% 0 VA DIVERSIFIED (MIXED LOADS PER NEC INCLUDED ABOVE) 0.00 100% 0 VA ESTIMATED CURRENT WITH SPARE: ESTIMATED LOAD WITH SPARE: PANELBOARD NOTES: 2 06/27/2025 EH DA I DT ADDENDUM #2 1 06/13/2025 JS DA DT ADDENDUM #1 0 12/10/2024 EH DA DT ISSUED FOR BID No. I DATE I DSN I CHK I APP I REVISION DESIGNED BY: D. TAFTFARREN DRAWN BY: E. HAJAS CHECKED BY: D.ANDERSON APPROVED BY: D. TAFTFARREN ; .acobs SUBMITTED BY: 6/27/25 R. PARGAS STmRIDE BRT General Engineering Consultant DATE: REVIEWED BY: 12/10/2024 J. ALTCHECH QUJ J Q Lnco W J Z J SOUNDTRANSIT DATE: 12/10/2024 SCALE: NTS FILENAME: S 1-BT120-E-v2020 CONTRACT No.: RTA/CN 0205-24 SUBMITTAL DATE: 12/10/2024 STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 ELECTRICAL ST PANEL SCHEDULES SOUTH RENTON TRANSIT CENTER R-4332493 DEVELOPMENT ENGINEERING msippo 11 /25/2025 U1 DRAWING NO.: BT120-EPS113 FACILITY ID: BT120 SHEET No: REV: 571 2