HomeMy WebLinkAboutR-4332510co
co
O
W
0
N
0
N
z
Q
U
0
N_
H
m
U
LU
c�
I
z
Q
ry
H
I
0
d
Q
C/)I
D
m
of
0
co
00
LO
a o
� QI
0
o coo
L6 c')
N �
oN m
2. .E
10 1 "C-BT120-SC-204
10 2"C-BT120-SC-137
10 2"C-BT120-SC-121
10 2"C-BT120-SC-201
1.8
24' - 0"
I A
BT120-JCX211
T120-CC-08 4
1 )
1.E = Z o
\ � � J N —�
--
0 13'-6"
w -I
w-------------,— ------------
1F
10 T12 H-10
1 2"C-BT120-SC-127
K
1 2"C-BT120-SC-202
_1 2"C-BT120-SC-138
24'-0"
BT120-JCE213
BAY 7 A
CONDUIT AND WIRING SCHEDULE
CONDUIT TAG
EQUIPMENT
CONDUIT SIZE
WIRE TYPE
REMARK
FROM
TO
BT120-SC-36
BT120-HH-113
BT120-HH-11
2" PVC
1-CAT6
ST
BT120-SC-37
BT120-HH-113
BT120-HH-11
2" PVC
1-CAT6
ST
BT120-SC-121
BT120-HH-109
BT120-HH-108
2" PVC
1-12SMFO
KCM
BT120-SC-127
BT120-HH-106
BT120-HH-110
2" PVC
1-12SMFO
ST
BT120-SC-137
BT120-HH-109
BT120-HH-216
2" PVC
2-CAT6
KCM
BT120-SC-138
BT120-HH-109
BT120-HH-121
2" PVC
1-12SMFO
KCM
BT120-SC-139
BT120-HH-111
BT120-HH-211
2" PVC
2-CAT6
KCM
BT120-SC-140
BT120-HH-111
BT120-PBA-06
1" PVC
KCM
BT120-SC-141
BT120-HH-111
BT120-DC-04
2" PVC
2-CAT6
KCM
BT120-SC-142
BT120-SC-143
BT120-HH-113
BT120-HH-111
BT120-CES-01
BT120-HH-114
1" PVC
2" PVC
1-CAT6
ST
KCM
BT120-SC-144
BT120-HH-110
BT120-HH-213
2" PVC
2-CAT6
ST
BT120-SC-145
BT120-HH-110
BT120-DC-05
2" PVC
5-CAT6
ST
BT120-SC-146
BT120-HH-110
LIGHT POLE 26
2" PVC
2-CAT6
ST
BT120-SC-147
BT120-HH-110
LIGHT POLE 27
2" PVC
2-CAT6
ST
BT120-SC-148
BT120-DC-05
BT120-HH-220
2" PVC
2-CAT6
ST
BT120-SC-149
BT120-DC-04
BT120-HH-112
2" PVC
4-CAT6
KCM
BT120-SC-150
BT120-HH-112
BT120-HH-209
2" PVC
4-CAT6
KCM
BT120-SC-151
BT120-HH-112
BT120-PBA-05
1" PVC
KCM
BT120-SC-152
BT120-DC-05
BT120-HH-113
2" PVC
1-CAT6
ST
BT120-SC-153
BT120-DC-05
BT120-HH-113
2" PVC
1-CAT6
ST
BT120-SC-156
BT120-HH-121
BT120-DC-04
2" PVC
1-12SMFO
KCM
BT120-SC-157
BT120-HH-110
BT120-DC-05
2" PVC
1-12SMFO
ST
BT120-SC-201
BT-120-HH-120
BT120-HH-109
2" PVC
2-CAT6
KCM
BT120-SC-202
BT120-HH-109
BT120-HH-121
2" PVC
KCM
BT120-SC-203
BT120-HH-121
BT120-DC-04
2" PVC
KCM
BT120-SC-204
BT120-HH-109
BT120-PBA-04
1" PVC
KCM
24' - 0"
A
A BT120-JCX211
17
24' - 0"
BT120-CC-12
2"C-BT120-SC-144
1
1.1
24'-0"
MATCHLINE:
SEE DWG BT120-JCP202
24' - 0"
rCk***6'
BT120-JCX211
2"C-BT120-SC-203 C�
�1.15,'
24' - 0" 2"C-BT120-SC-156 C
2"C-BT120-SC-141 C
rDk*%,
13T120-JCX211
�1 "C-BT120-SC-151 1 2"C-BT120-SC-148
2"C-BT120-SC-149 ( 1
10 ! BT120-HH-112
2"C-BT120-SC-36 1
2"C-BT120-SC-37 1
�i BT120-H H-113 10
2"C-BT120-SC-153 10
2"C-BT120-SC-152 10
I
1 "C-BT120-SC-142 10
BT120-DC-04 12
2"C-BT120-SC-150 1 BT120-CC-15
BT120-CC-13t47 �— BT120-CC-14 4 ' -
5
------------ ----
------- :71
r�rt-v --T
/4 12' - 0"
T120-JCE214 1 "C-BT120-SC-140 1 BAY 6
2"C-BT120-SC-139 1
* BT120-HH-121
CONSTRUCTION NOTES: 10 BT120-HH-110
10 INSTALL ALL CONDUIT ABOVE FOUNDATION OF SHELTER, SEE STRUCTURAL PLAN DWG
BT120-SFP212 TO BT120-SFP215 FOR DETAILS. MAINTAIN A 2" MINIMUM CLEARANCE ABOVE
FOUNDATION.
OINSTALL ST COMMUNICATIONS CABINET AND CABINET FOUNDATION.
SEE DETAIL ON DWG BT120-JCD208. SEE DWG BT120-SGY403 FOR STRUCTURAL DETAILS.
OSTUB UP CONDUIT INTO THE DESIGNATED CHANNEL ON THE COLUMN, WHICH VARIES
DEPENDING ON THE CONDUIT ROUTING RELATIVE TO THE CANOPY'S LOWER OR HIGHER
SIDE. ENSURE CONDUITS STUB UP AT CORRECT LOCATION AND SIDE. SEE DWG BT120-
JCX210 TO BT120-JCX212 AND BT120-AED903 FOR MORE DETAILS. SEE DWG BT120-JCE209
TO BT120-JCE216 FOR VERTICAL CONTINUATION.
OSTUB UP CONDUIT INTO CABINET FOUNDATION. SEE DETAIL ON DWG BT120-JCD207.
CINSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10-04
10 WITH DECORATIVE LID. STUB UP CONDUIT TO JUNCTION BOX.
DIMENSION ON PLAN IS TO THE CENTERLINE OF THE BOX. BOX WILL BE
LOCATED CENTERED ON THE LID. SEE DETAIL ON DWG BT120-JCD207
FOR CONDUIT ROUTING DETAILS.
INSTALL KCM COMMUNICATIONS CABINET AND CABINET FOUNDATION.
SEE DETAIL ON DWG BT120-JCD208. SEE DWG BT120-SGY403 FOR STRUCTURAL DETAILS.
PLATFORM
D
BT120-DC-05 20
2"C-BT120-SC-143 10
BT120-HH-111 10
2"C-BT120-SC-145 10
2"C-BT120-SC-157 10
-2"C-BT120-SC-146 10
2"C-BT120-SC-147 10
CORE U 8 4 0 8 16
FACILITY
GEN
KEY PLAN DEVELOPMENT ENGINEERING SCALE IN FEET
msippo 11 /25/2025 , ji R-4332510
DESIGNED BY: SCALE: DRAWING NO.:
J.MARGOLIS 'N CO < w As indicated STRIDE BUS RAPID TRANSIT
DRAWN BY: ���� F WAs��¢ U FILENAME: SOUTH RENTON TRANSIT CENTER BT120-JCP208
W.TURNER � �� o 04ARCADISwco
S1-BT120-J-CAN-v2020 BT105 FACILITY ID:
2 06/27/2025 JM SW MC ADDENDUM #2 CHECKED BY: BRT General Engineering Consultant J " S UNDTRANSIT CONTRACT No.: BT120
1 06/13/2025 JM SW MC ADDENDUM #1 S.WHITE �o'�� �cisTY' D RTA/CN 0205-24 SYSTEMS SHEET No: REV:
0 12/10/2024 JM SW MC ISSUED FOR BID APPROVED BY: SSIONAL� 588 2
SUBMITTED BY: DATE: REVIEWED BY: DATE: SUBMITTAL DATE: KCM BAYS 3, 6, AND 7 COMMUNICATIONS PLAN
1 1
No. DATE DSN CHK APP REVISION M.COX 07/01/2025 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/20241