Loading...
HomeMy WebLinkAboutR-4332513N co co W 0 N 0 N z U 0 N m U LU �I H z Q ry H I 0 a ry C/)I D 00 I 0 0 00 LO d M �o o QI Cn 0 � 0 co 0 o m N � o m 1 06/13/2025 JM SW MC ADDENDUM #1 0 12/10/2024 JM SW MC ISSUED FORBID No. DATE DSN CHK APP REVISION CONSTRUCTION NOTES: �3 INSTALL ALL CONDUIT INSIDE SHELTER STRUCTURE. COORDINATE EXACT ROUTING WITH ELECTRICAL AND LIGHTING. SECURE WITH CLAMP EVERY 10' AND WITHIN 3' OF JUNCTION BOXES. SEE DWG BT120-JCD210 FOR CONDUIT CLAMPING AND PENETRATION DETAILS. INSTALL CONDUIT AND CABLING FOR ST CANOPY VMS. COORDINATE WITH VMS 1.5 1.6 1.7 i 14 INSTALLER FOR BRACKET ENCLOSURE AND DISPLAY UNIT INSTALLATION. SEE DETAIL 1 T ON DWG BT120-JCD205 FOR DETAILED BREAKDOWN. C' 15 INSTALL CONDUIT AND CABLING FOR KCM CANOPY VMS. KCM DISPLAY MOUNT IS AB O APROCURED BY KCM AND PROVIDED TO CONTRACTOR FOR INSTALLATION. DISPLAY UNITS 13 1"C-BT120-SC-172 BT120-JCX212 BT120-JCX212 BT120-JCX212 ARE PROCURED AND INSTALLED BY KCM. SEE DETAIL 2 ON DWG BT120-JCD205 FOR BT120-VMS-05 15 DETAILED BREAKDOWN. 16 BT1 20-CAM-1 05 15 BT12(NVC))S-06 (NIC) 16 INSTALL CANOPY CAMERA AND ALL ASSOCATED CABLING. SEE DETAIL ON SHEET BT120- OJCD205 FOR MOUNTING DETAILS. SEE DWG BT120-JCD211 FOR CAMERA INSTALLATION SCHEDULE AND CONFIGURATION INFORMATION. 13 1"C-BT120-SC-171 CONFIGURE ALL CAMERAS AS SPECIFIED IN THE CAMERA INSTALLATION SCHEDULE ON 17 BT120-H H-205 ____� __ BT120-CAM-106]16 DWG BT1 20-JCD21 1, ADHERING TO THE INDIVIDUAL SETTINGS FOR FOCAL LENGTH, ORIENTATION, AND OTHER PARAMETERS. CONTRACTOR SHALL ENSURE PROPER ------- 1"C-BT120-SC-173 13 MOUNTING, WIRING, AND NETWORK INTEGRATION OF EACH CAMERA IN ACCORDANCE ; 1"C-BT120-SC-170 O WITH MANUFACTURER'S INSTRUCTIONS AND PROJECT SPECIFICATIONS. C13 ao BT120-HH-204 BT120-HH-206 17 17 ti 17 INSTALL 5"x5" EMT CONDUIT JUNCTION BOX ATTACHED TO CANOPY STRUCTURE. SEE BT120- DETAIL 2 ON DWG BT120-JCD-210 FOR DETAILS. CC-05 - rn 17 0-H 7 13 1 "C-BT120-SC-174 1 T 1 16 BT120-CAM-108 13 1 "C-BT120-SC-175 1 C BT120-CAM-107 16 14 BT120-VMS-08 (NIC) 1.D 14 BT120-VMS-07 —7---- 1 "C-BT120-SC-177 13 (NIC) 1 "C-BT120-SC-176 *13) B 1 121,. 1-H11-208 17 1.E 2.b CONDUIT AND WIRING SCHEDULE CONDUIT TAG EQUIPMENT CONDUIT SIZE WIRE TYPE REMARK FROM TO BT120-SC-170 BT120-HH-204 BT120-HH-205 1" EMT 2-CAT6 1-CAT6 ST ST BT120-SC-171 BT120-HH-205 BT120-CAM-105 1" EMT BT120-SC-172 BT120-SC-173 BT120-HH-205 BT120-HH-206 BT1 20-CAM-1 06 BT120-VMS-05 AND BT120-VMS-06 BT120-HH-208 1" EMT 1" EMT 1-CAT6 2-CAT6 ST KCM BT120-SC-174 BT120-HH-207 1" EMT 4-CAT6 ST BT120-SC-175 BT120-HH-208 BT1 20-CAM-1 08 1" EMT 1-CAT6 ST BT120-SC-176 BT120-HH-208 BT120-VMS-07 AND BT120-VMS-08 1" EMT 2-CAT6 ST BT120-SC-177 BT120-HH-208 BT120-CAM-107 1" EMT 1-CAT6 ST DESIGNED BY: J.MARGOLIS DRAWN BY: W.TURNER CHECKED BY: S.WHITE APPROVED BY: M.COX OAARCADIS SUBMITTED BY: 06/10/2025 R. PA GAS 4STm)?IDE BRT General Engineering Consultant DATE: REVIEWED BY: 12/10/2024 J. ALTCHECH Q w U) � W J Z J SOUNDTRANSIT DATE: 12/10/2024 SCALE: As indicated FILENAME: S 1-BT120-J-CAN-v2020 CONTRACT No.: RTA/CN 0205-24 SUBMITTAL DATE: 12/10/2024 L C D PLATFORM E F G H CORE FACILITY t 0 8 16 SCALE IN FEET R-4332513 npA\Aiirnir; Mn STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 SYSTEMS KCM RAPID RIDE BAY 2 AND STRIDE BAY 8 BT120-JCP211 FACILITY ID: BT120 SHEET No: REV: 591 1