Loading...
HomeMy WebLinkAboutR-4332514N C'7 O 0 LU 0 N O N z Q U 0 N H m U LU C� I z Q ry I 0 d ry C/)I D 00 of 0 00 LO a o 0 I Q o � O CD o (.00 N � NN m L13 �1.8 n19 1.10 1.11 n1l � , 1.14 BT120-HH-210 17 n1l CONDUIT AND WIRING SCHEDULE CONDUIT TAG EQUIPMENT CONDUIT SIZE WIRE TYPE REMARK FROM TO BT120-SC-180 BT120-HH-209 BT120-HH-210 1.5" EMT 4-CAT6 KCM BT120-SC-181 BT120-HH-210 BT120-VMS-15 AND BT120-VMS-16 1" EMT 2-CAT6 KCM BT120-SC-182 BT120-HH-210 BT120-VMS-11 AND BT120-VMS-12 1" EMT 2-CAT6 KCM BT120-SC-183 BT120-HH-220 BT120-HH-218 1" EMT 2-CAT6 ST BT120-SC-184 BT120-HH-218 BT120-HH-219 1" EMT 2-CAT6 ST BT120-SC-185 BT120-HH-219 BT120-CAM-110 1" EMT 1-CAT6 ST 20- - 6 B -HH- 12 -1 MT 1- ST BT120-SC-187 BT120-HH-211 BT VMS AND BT120-VMS-14 1" EMT 2-CAT6 KCM BT120-SC-189 BT120-HH-213 BT120-HH-214 1" EMT 2-CAT6 ST - - -2 - 2 " -C BT120-SC-191 BT120-HH-214 BT120-HH-215 BT120-CAM-111 1" EMT 1-CAT6 ST ST BT120-SC-192 BT120-HH-215 1" EMT 1-CAT6 BT120-SC-193 BT120-HH-216 BT120-HH-217 1" EMT 2-CAT6 KCM BT120-SC-194 BT120-HH-217 BT120-VMS-09 AND BT120-VMS-10 1" EMT 2-CAT6 KCM CONSTRUCTION NOTES: 13 INSTALL ALL CONDUIT INSIDE SHELTER STRUCTURE. COORDINATE EXACT ROUTING WITH ELECTRICAL AND LIGHTING. SECURE WITH CLAMP EVERY 10' AND WITHIN 3' OF JUNCTION BOXES. SEE DWG BT120-JCD210 FOR CONDUIT CLAMPING AND PENETRATION DETAILS. 15 INSTALL CONDUIT AND CABLING FOR KCM CANOPY VMS. KCM DISPLAY MOUNT IS PROCURED BY KCM AND PROVIDED TO CONTRACTOR FOR INSTALLATION. DISPLAY UNITS ARE PROCURED AND INSTALLED BY KCM. SEE DETAIL 2 ON DWG BT120-JCD205 FOR DETAILED BREAKDOWN. 16 INSTALL CANOPY CAMERA AND ALL ASSOCATED CABLING. SEE DETAIL ON SHEET BT120- JCD205 FOR MOUNTING DETAILS. SEE DWG BT120-JCD211 FOR CAMERA INSTALLATION SCHEDULE AND CONFIGURATION INFORMATION. CONFIGURE ALL CAMERAS AS SPECIFIED IN THE CAMERA INSTALLATION SCHEDULE ON DWG BT120-JCD211, ADHERING TO THE INDIVIDUAL SETTINGS FOR FOCAL LENGTH, ORIENTATION, AND OTHER PARAMETERS. CONTRACTOR SHALL ENSURE PROPER MOUNTING, WIRING, AND NETWORK INTEGRATION OF EACH CAMERA IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND PROJECT SPECIFICATIONS. 1 INSTALL 5"x5" EMT CONDUIT JUNCTION BOX ATTACHED TO CANOPY STRUCTURE. SEE 17 DETAIL 2 ON DWG BT120-JCD-210 FOR DETAILS. q e C D PLATFORM E F G H CORE FACILITY 0 8 16 SCALE IN FEET R-4332514 DESIGNED BY: SCALE: DRAWING NO.: J.MARGOLIS v� C) w As indicated STRIDE BUS RAPID TRANSIT DRAWN BY: ��� F WA FILENAME: FILENAME: SOUTH RENTON TRANSIT CENTER BT120-JCP212 W.TURNER ���� PARCADI RIDEw S1-BT120-J-CAN-v2020 BT105 FACILITY ID: CHECKED BY: 25004257^ BRT General Engineering Consultant z " SOUNDTRANSIT CONTRACT No.: SYSTEMS BT120 1 06/13/2025 JM SW MC ADDENDUM #1 S.WHITE �oGIST��� RTA/CN 0205-24 KCM COMMUNICATIONS RCP BAYS 3, 4, 6, AND 7 SHEET No: REV: 0 12/10/2024 JM SW MC ISSUED FOR BID APPROVED BY: ZONAL SUBMITTED BY: DATE: REVIEWED BY: rAE0 SUBMITTAL DATE: 592 1 No. DATE DSN CHK APP REVISION M.COX 06/10/2025 R. PARGAS 112/10/2024 J. ALTCHECH /2024 12/10/2024