CONDUIT AND WIRING SCHEDULE
CONDUIT TAG
EQUIPMENT
CONDUIT
SIZE
WIRE TYPE
REMARK
FROM
TO
BT120-SC-180
BT120-HH-209
BT120-HH-210
1.5" EMT
4-CAT6
KCM
BT120-SC-181
BT120-HH-210
BT120-VMS-15 AND
BT120-VMS-16
1" EMT
2-CAT6
KCM
BT120-SC-182
BT120-HH-210
BT120-VMS-11 AND
BT120-VMS-12
1" EMT
2-CAT6
KCM
BT120-SC-183
BT120-HH-220
BT120-HH-218
1" EMT
2-CAT6
ST
BT120-SC-184
BT120-HH-218
BT120-HH-219
1" EMT
2-CAT6
ST
BT120-SC-185
BT120-HH-219
BT120-CAM-110
1" EMT
1-CAT6
ST
20- - 6
B -HH-
12 -1
MT
1-
ST
BT120-SC-187
BT120-HH-211
BT VMS AND
BT120-VMS-14
1" EMT
2-CAT6
KCM
BT120-SC-189
BT120-HH-213
BT120-HH-214
1" EMT
2-CAT6
ST
- - -2 - 2 "
-C
BT120-SC-191
BT120-HH-214
BT120-HH-215
BT120-CAM-111
1" EMT
1-CAT6
ST
ST
BT120-SC-192
BT120-HH-215
1" EMT
1-CAT6
BT120-SC-193
BT120-HH-216
BT120-HH-217
1" EMT
2-CAT6
KCM
BT120-SC-194
BT120-HH-217
BT120-VMS-09 AND
BT120-VMS-10
1" EMT
2-CAT6
KCM
CONSTRUCTION NOTES:
13 INSTALL ALL CONDUIT INSIDE SHELTER STRUCTURE. COORDINATE EXACT ROUTING WITH
ELECTRICAL AND LIGHTING. SECURE WITH CLAMP EVERY 10' AND WITHIN 3' OF JUNCTION
BOXES. SEE DWG BT120-JCD210 FOR CONDUIT CLAMPING AND PENETRATION DETAILS.
15 INSTALL CONDUIT AND CABLING FOR KCM CANOPY VMS. KCM DISPLAY MOUNT IS
PROCURED BY KCM AND PROVIDED TO CONTRACTOR FOR INSTALLATION. DISPLAY UNITS
ARE PROCURED AND INSTALLED BY KCM. SEE DETAIL 2 ON DWG BT120-JCD205 FOR
DETAILED BREAKDOWN.
16 INSTALL CANOPY CAMERA AND ALL ASSOCATED CABLING. SEE DETAIL ON SHEET BT120-
JCD205 FOR MOUNTING DETAILS. SEE DWG BT120-JCD211 FOR CAMERA INSTALLATION
SCHEDULE AND CONFIGURATION INFORMATION.
CONFIGURE ALL CAMERAS AS SPECIFIED IN THE CAMERA INSTALLATION SCHEDULE ON
DWG BT120-JCD211, ADHERING TO THE INDIVIDUAL SETTINGS FOR FOCAL LENGTH,
ORIENTATION, AND OTHER PARAMETERS. CONTRACTOR SHALL ENSURE PROPER
MOUNTING, WIRING, AND NETWORK INTEGRATION OF EACH CAMERA IN ACCORDANCE
WITH MANUFACTURER'S INSTRUCTIONS AND PROJECT SPECIFICATIONS.
1
INSTALL 5"x5" EMT CONDUIT JUNCTION BOX ATTACHED TO CANOPY STRUCTURE. SEE
17 DETAIL 2 ON DWG BT120-JCD-210 FOR DETAILS.
q
e
C D
PLATFORM
E
F
G
H
CORE
FACILITY
0 8 16
SCALE IN FEET
R-4332514
DESIGNED BY: SCALE: DRAWING NO.:
J.MARGOLIS v� C) w As indicated STRIDE BUS RAPID TRANSIT
DRAWN BY: ��� F WA FILENAME:
FILENAME: SOUTH RENTON TRANSIT CENTER BT120-JCP212
W.TURNER ���� PARCADI RIDEw S1-BT120-J-CAN-v2020 BT105 FACILITY ID:
CHECKED BY: 25004257^ BRT General Engineering Consultant z " SOUNDTRANSIT CONTRACT No.: SYSTEMS BT120
1 06/13/2025 JM SW MC ADDENDUM #1 S.WHITE �oGIST��� RTA/CN 0205-24 KCM COMMUNICATIONS RCP BAYS 3, 4, 6, AND 7 SHEET No: REV:
0 12/10/2024 JM SW MC ISSUED FOR BID APPROVED BY: ZONAL SUBMITTED BY: DATE: REVIEWED BY: rAE0 SUBMITTAL DATE:
592 1
No. DATE DSN CHK APP REVISION M.COX 06/10/2025 R. PARGAS 112/10/2024 J. ALTCHECH /2024 12/10/2024