Loading...
HomeMy WebLinkAboutR-4332518N co co O W 0 N 0 N z U 0 N_ H m V1 U w C� I H V) z Q ry H I c) d Q ry I D m 0 I 0 co 00 LO a o M QI O Cn 0 0 LO cy) m BT120-DC-03 BT120-H H-10 0 1 12/10/2024 I JM I JD I PPL I ISSUED FOR BID No. I DATE I DSN I CHK I APP I REVISION DESIGNED BY: J.MARGOLIS DRAWN BY: W.TURNER CHECKED BY: J.DONG APPROVED BY: P. LAVALLEE 1.7 1.6� � 1.5 ELEVATION - KCM BAY 2 SCALE: NTS 04ARCADIS SUBMITTED BY: 4 R. PA GAS BT120-JCP208 4STm)?IDE BRT General Engineering Consultant DATE: REVIEWED BY: 12/10/2024 J. ALTCHECH Q w cn � W J Z J SOUNDTRANSIT DATE: 12/10/2024 SCALE: NTS FILENAME: S 1-BT120-J-CAN-v2020 CONTRACT No.: RTA/CN 0205-24 SUBMITTAL DATE: 12/10/2024 GENERAL NOTES: 1. SEE ELECTRICAL PLAN DWG BT120-EPP212 TO BT120-EPP215 FOR DESIGN OF CONDUITS AND BOXES SHOWN GREYED BACK ON THIS SHEET. 2. INSTALL ALL UNDERGROUND CONDUIT WITHIN STRUCTURE FOOTPRINT ABOVE FOOTING. INSTALL AS CLOSE TO THE SURFACE OF THE FOOTING AS FEASIBLE WHILE MAINTAINING 2" MINIMUM CLEARANCE FROM IT. 3. FOR UNDERGROUND CONDUITS, SEE DWG BT120-JCP206 TO BT120-JCP209. FOR CANOPY CONDUITS, SEE BT120-JCP210 TO BT120-JCP212 CONSTRUCTION NOTES: EXTEND CONDUIT WITHIN COLUMN COVER TO 19) JUNCTION BOXES IN CANOPY SHOWN IN DWG BT120-JCP210 TO BT120-JCP212. T120-H H-105 STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 SYSTEMS KCM BAY 2 COMMUNICATIONS ELEVATION R-4332518 DEVELOPMENT ENGINEERING msippo 11 /25/2025 Ul DRAWING NO.: BT120-JCE212 FACILITY ID: BT120 SHEET No: REV: 596 0