Loading...
HomeMy WebLinkAboutR-4332521N C'7 C'7 0 LU 0 N O N Z U 0 N H m V1 U w C� I H V) Z Q ry H I c) d ry I D m O I O co 00 LO Q M �r) L, Q I 66 Cn L N O O �p N cy) O m BT120-HH-110 0 1 12/10/2024 I JM I JD I PPL I ISSUED FOR BID No. I DATE I DSN I CHK I APP I REVISION DESIGNED BY: J.MARGOLIS DRAWN BY: W.TURNER CHECKED BY: J.DONG APPROVED BY: P. LAVALLEE 1.16 t 1.17 BT120-H H-114 ELEVATION - KC METRO BAY 4 AND 5 SCALE: NTS 04ARCADIS SUBMITTED BY: 4 R. PA GAS BT120-JCP209 4STm)?IDE BRT General Engineering Consultant DATE: REVIEWED BY: 12/10/2024 J. ALTCHECH Q w cn � W J Z J SOUNDTRANSIT DATE: 12/10/2024 11 SCALE: 1 /8" = 1'-0" FILENAME: S 1-BT120-J-CAN-v2020 CONTRACT No.: RTA/CN 0205-24 SUBMITTAL DATE: 12/10/2024 GENERAL NOTES: 1. SEE ELECTRICAL PLAN DWG BT120-EPP212 TO BT120-EPP215 FOR DESIGN OF CONDUITS AND BOXES SHOWN GREYED BACK ON THIS SHEET. 2. INSTALL ALL UNDERGROUND CONDUIT WITHIN STRUCTURE FOOTPRINT ABOVE FOOTING. INSTALL AS CLOSE TO THE SURFACE OF THE FOOTING AS FEASIBLE WHILE MAINTAINING 2" MINIMUM CLEARANCE FROM IT. R-4332521 DEVELOPMENT ENGINEERING msippo 11 /25/2025 Ul STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 SYSTEMS KCM BAYS 4 AND 5 COMMUNICATIONS ELEVATION DRAWING NO.: BT120-JCE215 FACILITY ID: BT120 SHEET No: REV: 599 0