Loading...
HomeMy WebLinkAboutR-4332537N co co W 0 N O N Z U 0 N H m V1 U w C� I z Q ry I 0 a ry I D m O I 0 co 00 LO a o � I N >Q O Cn 0 0 LO cy) m CONDUIT PENETRATION DETAIL SCALE: NTS 0 1 12/10/2024 1 JM I JD I PPL I ISSUED FOR BID No. I DATE I DSN I CHK I APP I REVISION "' _. 'T^''T'"' or:AM. SEE DWG 0T120-0GP312 FOR DETAILS. CENTER CONDUIT THROUGH PENETRATION NDUIT TO METAL GIRTS WITHIN BEAMS NG CLAMP OP TO METAL GIRT DESIGNED BY: J.MARGOLIS DRAWN BY: W.TURNER CHECKED BY: J.DONG APPROVED BY: P. LAVALLEE 04ARCADIS SUBMITTED BY: 4 R. PA GAS 4STm)?IDE BRT General Engineering Consultant DATE: REVIEWED BY: 12/10/2024 J. ALTCHECH NOTE: THE NUMBER OF CONDUITS AND THEIR LOCATION RELATIVE TO THE BEAM VARYS BY LOCATION. SEE DWG BT120-JCP206 TO BT120-JCP209 CANOPY JUNCTION BOX DETAIL SCALE: NTS Q w cn � W J Z J SOUNDTRANSIT DATE: 12/10/2024 SCALE: NTS FILENAME: S 1-BT120-J-CAN-v2020 CONTRACT No.: RTA/CN 0205-24 SUBMITTAL DATE: 12/10/2024 STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 SYSTEMS CONDUIT PENETRATION DETAIL R-4332537 DEVELOPMENT ENGINEERING msippo 11 /25/2025 DRAWING NO.: BT120-JCD210 FACILITY ID: BT120 SHEET No: REV: 615 0