G. CONTRACTOR(S) GUIDELINES.
1. ALL TELECOMMUNICATION WORK MUST COMPLY WITH APPLICABLE FEDERAL, STATE, AND LOCAL
CODES. WHERE THE CONSTRUCTION DOCUMENTS INDICATE MORE RESTRICTIVE REQUIREMENTS,
THE DOCUMENTS MUST GOVERN BUT THE CONSTRUCTION DOCUMENTS MUST NOT BE INTERPRETED
AS AUTHORITY TO VIOLATE ANY CODE OR REGULATION.
2. IN THE EVENT OF A CONFLICT OR INCONSISTENCY BETWEEN ITEMS INDICATED ON THE PLANS AND/OR
SPECIFICATIONS OR WITH CODE REQUIREMENTS, THE NOTE, CODE OR SPECIFICATION WHICH
PRESCRIBES AND ESTABLISHES THE MORE COMPLETE JOB OR THE HIGHER STANDARD MUST
PREVAIL.
3. OMISSIONS FROM THE DRAWINGS OR SPECIFICATIONS OR THE MIS -DESCRIPTION OF DETAILS OF
WORK WHICH ARE CLEAR AND NECESSARY TO CARRY OUT THE INTENT OF THE DRAWINGS AND
SPECIFICATIONS, OR WHICH ARE CUSTOMARILY PERFORMED, MUST NOT RELIEVE THE CONTRACTOR
FROM PERFORMING SUCH OMITTED OR MIS -DESCRIBED DETAILS OF THE WORK BUT THEY MUST BE
PERFORMED AS IF FULLY AND CORRECTLY SET FORTH AND DESCRIBED IN THE DRAWINGS AND
SPECIFICATIONS.
4. THE CONTRACTOR MUST CHECK ALL DRAWINGS FURNISHED, IMMEDIATELY UPON THEIR RECEIPT AND
MUST PROMPTLY NOTIFY THE OWNER OF ANY DISCREPANCIES.
5. ALL MATERIALS AND EQUIPMENT MUST BE NEW AND MUST BEAR THE UNDERWRITERS LABEL (UL) AND
MUST BE INSTALLED IN THE MANNER FOR WHICH THEY ARE DESIGNED AND APPROVED.
6. THE CONTRACTOR MUST NOT BORE, NOTCH OR IN ANY WAY CUT INTO ANY STRUCTURAL MEMBER
WITHOUT WRITTEN APPROVAL FROM THE ARCHITECT OR STRUCTURAL ENGINEER.
7. ALL CHANGES TO STRUCTURES (BUILDING, DRILLING, CORING, ETC.) NOT SHOWN ON THE DRAWINGS
MUST BE APPROVED IN WRITING BY STRUCTURAL ENGINEER.
8. FOR PURPOSES OF CLEARNESS AND LEGIBILITY, THE TELECOM DRAWINGS ARE ESSENTIALLY
DIAGRAMMATIC. THE SIZE AND LOCATION OF EQUIPMENT IS SHOWN TO SCALE WHEREVER POSSIBLE.
THE CONTRACTOR MUST VERIFY ALL CONDITIONS, DATA INFORMATION AS INDICATED ON THE
DRAWINGS AND IN THE SPECIFICATION SECTIONS WHERE SCS AND LOW VOLTAGE WORK
INTERFACES WITH OTHER TRADES.
9. THE CONTRACTOR MUST MAINTAIN AS -BUILT DRAWINGS TO REFLECT ALL CHANGES MADE DURING
CONSTRUCTION AND ANY DEVIATIONS FROM THE ELECTRICAL AND TELECOMMUNICATION DRAWINGS.
THIS INCLUDES DEVIATIONS FROM OUTLET NUMBERS AND ANY ADDITION, DELETION OR RELOCATION
OF OUTLETS SHOWN ON WORKING DRAWINGS, PATHWAY ADDITIONS, DELETIONS OR RELOCATIONS.
THE CONTRACTOR MUST AFTER COMPLETION OF JOB, PROVIDE THE OWNER AN ELECTRONIC AND
HARD COPY OF AS -BUILT WORK.
10. ANY DEVIATIONS FROM PLANS OR SPECS MUST BE APPROVED IN WRITING BY THE OWNER'S
REPRESENTATIVE.
11. ALL FOOTAGES ON DRAWINGS ARE ESTIMATED AND MUST BE VERIFIED BY CONTRACTOR PRIOR TO
ORDERING MATERIAL.
12. ALL STATION CABLES MUST BE NEATLY DRESSED AND SECURED EVERY FIVE FEET AT A MINIMUM.
13. THE CONTRACTOR MUST BE RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING TILE
INCLUDING REPLACEMENT OF BROKEN OR DAMAGED TILES.
14. ALL LOCATIONS PASSING THROUGH A FIRE OR A SMOKE BARRIER MUST BE FIRE STOPPED USING
APPROVED (UL CLASSIFIED) FIRE STOP SYSTEM, INSTALLED PER THE MANUFACTURER'S
INSTRUCTIONS AND PROPERLY LABELED.
15. CONDUIT MUST BE FILLED TO MAXIMUM CAPACITY (PER CODE, STANDARDS, AND NORMS) BEFORE
UTILIZING ANOTHER VACANT CONDUIT.
16. ALL STATION OUTLETS AND TERMINALS MUST BE PROPERLY IDENTIFIED USING THE OWNER'S
STANDARD INTERNAL DISTRIBUTION NUMBERING SCHEME. ALL LABELS MUST BE PREPRINTED OR
TYPED.
17. EACH BACKBONE RISER AND/OR OSP CABLE MUST BE EQUIPPED WITH A PERMANENT LABEL
INDICATING CABLE TYPE, PAIR OR OPTIC COUNTS, DISTANT ENDS, AND CABLE LENGTH. BOTH ENDS
OF EACH CABLE AND AT EVERY MAINTENANCE HOLE, HAND HOLE, AND PULL BOX, MUST BE SO
LABELED.
18. FIBER BACKBONE CABLE MUST BE PLACED WITH 6 FOOT MAINTENANCE LOOP AT BOTH ENDS OF THE
RUN. THE MAINTENANCE LOOP MUST BE SECURED IN SUCH A MANNER TO PROVIDE PROTECTION
DURING SUBSEQUENT CABLE PULLS.
19. ALL STATION CABLES/OUTLETS MUST BE TESTED AND DOCUMENTED USING A PAIR SCANNER
SPECIFICALLY DESIGNED TO TEST THE TYPE OF CABLE INSTALLED (E.G. CATEGORY 6A). TEST
RESULTS MUST BE ONE PAGE PER AND NOTED WITH THE STATION/JACK NUMBERING SCHEME THAT IS
STANDARDIZED FOR THE OWNER.
20. ALL FIBER OPTIC STATION AND RISER CABLE MUST BE TESTED END -TO -END AND THE RESULTS (LOSS
IN dB) NOTED ON A SEPARATE TYPED SHEET.
21. AFTER STATION CABLE IS TESTED AND DOCUMENTED, ONE PAIR FROM EACH VOICE STATION MUST
BE CROSS CONNECTED THROUGH EACH CLOSET BACK TO THE MAIN DISTRIBUTION FRAME.
TELEPHONE NUMBER ASSIGNMENTS FOR EACH JACK MUST BE APPROVED BY THE TELECOM STAFF
PRIOR TO IMPLEMENTATION. A WRITTEN RECORD OF ALL CROSS CONNECT ASSIGNMENTS WILL BE
PROVIDED TO THE OWNER BY THE SCS CONTRACTOR.
22. FIBER CABLES MUST BE SPLICED TOGETHER USING A FUSION SPLICE AND PLACED IN A FIBER SPLICE
CASE THAT IS RE -ENTERABLE, FULLY DRESSED AND ENCLOSED TO FIT THE NUMBER AND TYPE OF
CABLES TERMINATED.
--CONTINUED--
0 12/10/2024 1 DS MF DTF I ISSUED FOR BID
No. DATE DSN CHK APP I REVISION
DESIGNED BY:
D. STOLTZ
DRAWN BY:
M. SANTO
CHECKED BY:
M.FREEMAN
APPROVED BY:
D. TAFT-FARREN
23. LADDER RACK MUST BE PLACED IN MDF AND IDF(S) AS SHOWN ON DRAWINGS AND AS
REQUIRED TO PROPERLY SECURE CABLES AND WIRE.
24. A BACKBONE CABLE ASSIGNMENT RECORD SHEET MUST BE PREPARED (TYPED) PRIOR TO
START OF ACCEPTANCE TESTING. ALL FLOOR PLANS MUST BE NEATLY HAND NOTED WITH
STATION JACK NUMBER AND CABLE LENGTH.
25. ALL CABLES MUST BE CLEARLY LABELED WITH CABLE NUMBERS, PAIR ASSIGNMENTS AND
DESIGNATION.
26. ALL CABLE TRAYS, LADDER RACKS, CONDUITS, EQUIPMENT RACKS, PROTECTOR PANELS,
AND CABLE SHEATHS MUST BE BONDED & GROUNDED TO EQUIPMENT GROUND WITH #6
WIRE (MIN.)
27. ALL SPLICES MUST BE CONTAINED WITHIN AN APPROVED SPLICE CASE DESIGNED FOR
MULTIPLE CLOSURE.
28. ALL SPLICES MUST UTILIZE 3M 710 MODULES. ALL CABLES MUST BE EQUIPPED TO PROVIDE
A CONTINUOUS BOUND OF CABLE SHIELDS THROUGH ALL SPLICES.
29. PULL TAPES MUST BE PLACED IN ALL VACANT CONDUITS.
30. ALL WORK MUST BE COMPLETED IN A NEAT AND PROFESSIONAL MANNER. THE WORK SITE
MUST BE KEPT CLEAN AND ALL DAMAGE TO OWNER'S PROPERTY REPAIRED.
31. THE CONTRACTOR MUST BE RESPONSIBLE FOR CONDUCTING A FINAL CLEANUP OF THE
WORK SITE PRIOR TO FINAL SYSTEM ACCEPTANCE.
32. CONTRACTOR MUST REMOVE ALL COPPER, FIBER AND COAXIAL CABLES ABANDONED IN
CONDUIT, CEILINGS AND WALLS PER NEC. CABLE MUST INCLUDE ALL INTRABUILDING, RISER
SYSTEMS AND STATION CABLES FOR ALL LOW
VOLTAGE/TELECOMMUNICATION/STRUCTURED CABLING SYSTEMS.
33. CONTRACTOR(S) MUST VERIFY ALL SITE CONDITIONS PRIOR TO BID.
34. IN ACCESSIBLE CEILING SPACES;
a. THE ELECTRICAL CONTRACTOR MUST PROVIDE THE REQUIRED STUB UP(S) / OUT(S) AND
BOXES WITH MUD -RINGS TO THE NEAREST ACCESSIBLE CEILING SPACE AND / OR
NEAREST TELECOMMUNICATION PATHWAY INFRASTRUCTURE, REFERENCE PLANS AND
SPECIFICATION FOR MORE INFORMATION.
b. THE DESIGNATED SCS / TELECOMMUNICATION CONTRACTOR(S) MUST PROVIDE A J-HOOK
PATHWAY SYSTEM AND REQUIRED SLEEVES. DO NOT USE CEILING TILE WIRE HANGERS,
WATER OR ELECTRICAL PIPES, OR LIGHT FIXTURES TO HANG CABLE. CABLE MUST BE A
MINIMUM OF 6 INCHES ABOVE THE CEILING TILE AND MUST NOT COME WITHIN TWELVE
INCHES OF A LIGHT FIXTURE.
• THE SCS / TELECOMMUNICATION CONTRACTOR WILL PROVIDE THE PATHWAY
REQUIRED FOR THE STRUCTURE CABLING SYSTEMS.
• THE DESIGNATED LOW VOLTAGE / TELECOMMUNICATION CONTRACTOR(S) FOR EACH
SUB -SYSTEM WILL PROVIDE THE PATHWAY REQUIRED FOR THE SYSTEMS, OUTSIDE
WHAT IS CONSIDERED THE STRUCTURED CABLING SYSTEM.
35. IN INACCESSIBLE AND HARD LID CEILING SPACES;
a. THE ELECTRICAL CONTRACTOR MUST PROVIDE ALL CONDUIT PATHWAYS, BOXES ETC.
FOR A COMPLETE SYSTEM FROM THE MDF ROOM, IDF ROOM(S), IDF CABINET(S), AND ALL
OTHER LOW VOLTAGE / TELECOMMUNICATION SYSTEMS HEADEND, CABINETS, TERMINAL
CABINETS, ETC. TO THE POINT OF TERMINATION AT THE STATION END LOCATION PER
PLANS AND SPECIFICATION.
pacobs
SUBMITTED BY:
1210212" R. PARGAS
--END--
TmRIDE
4S
BRT General Engineering Consultant
DATE: REVIEWED BY:
09/06/2024 J. ALTCHECH
Q w
U)�
W J
Z J
SOUNDTRANSIT
DATE:
12/04/2024
SCALE:
N.T.S.
FILENAME:
S1-BT120-J-BLD-v2020
CONTRACT No.:
RTA/CN 0205-24
SUBMITTAL DATE:
09/06/2024
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
TELECOM
GENERAL NOTES
TRANSIT CENTER
R-4332542
DEVELOPMENT ENGINEERING
msippo 11 /25/2025
DRAWING NO.:
BT120-JCN003
FACILITY ID:
BT120
SHEET No: REV:
620 0