Loading...
HomeMy WebLinkAboutR-4332559N C'7 C'7 0 W 0 N O N 0 J m O N H m W U w C� I H W Z Q ry H I 0 0- ry I W D m O I 0 co 00 LO a o � I N >Q Cn 0 0 m BONDING CONDUCTOR TO BLDG STEEL LABEL: TO BLDG STEEL BONDING CONDUCTOR TO 110 BLOCKS LABEL: TO 110 BLOCKS BONDING CONDUCTOR TO CONDUIT & OTHER PATHWAYS TO CONDUIT BONDING CONDUCTOR TO OVERHEAD CABLE SUPPORT TO TRAY/RUNWAY BONDING CONDUCTOR TO EQUIPMENT RACKS LABEL: TO EQMT RACKS O IvnTPQ 0 �0 0 J W w W c� 0 J In O IN W — LABEL: TO (NEXT TR) Z 0 EXOTHERMIC WELD TBC, INSULATED CONDUCTOR m TO TGB - LABEL: TO (PREY TR) 0 0 0 0 0 TBB, INSULATED CONDUCTOR TO TMGB GROUND BUSBAR LABEL: (CURRENT TR) 1. REFER TO ROOM PLANS FOR BUSBAR MOUNTING LOCATION 2. REFER TO GROUNDING RISER DIAGRAM FOR LIST OF EQUIPMENT REQUIRING GROUNDING. ITEMS SHOWN HERE ARE AN EXAMPLE BONDING - LABELING BUS BAR SCALE: N.T.S. 0 1 12/10/2024 I DS I MF I DTF I ISSUED FOR BID No. I DATE I DSN I CHK I APP I REVISION BT120-JCD505 DESIGNED BY: D. STOLTZ DRAWN BY: M. SANTO CHECKED BY: M.FREEMAN APPROVED BY: D. TAFT-FARREN SPLICE IN EXTERI14/ I LL 1 I I I VV/ ILI\, HEX NUT) THROUGH STRINGER .;acobs SUBMITTED BY: 12102124 R. PARGAS NOTES: V lJ l 1 \.J I 1 CABLE RUNWAY (TYP) C OR H TAPS #6 TBC TO #2 (OPEN END DRAIN) TO TGB. EQ RACKS #6 TO #2. ACTIVE EQUIP RECEIVE DEDICATED #6 TBC TO TGB. SEPARATE ACTIVE AND NON -ACTIVE GROUND BONDING PATHS TO TGB STRAP, WITH FASTENER (TYP) #2 FOR BONDING (C-H TAPS) TO NON ACTIVE EQUIPMENT LADDERS, TRAYS, EQUIPMENT FRAMES. TBC TO TGB TO RM BRANCH PANEL EQUIP GRND BUS- BUILDING STEEL AND TBB IF AVAILABLE - #2 1. PROVIDE BONDING STRAPS AT ALL RUNWAY SPLICES.WITH SINGLE ATTACHMENT TO TGB (PREVENTS GRND LOOPS). 2. PROVIDE BOND HOME RUN FROM TGB TO ACTIVE EQUIPMENT. 3. CONNECTOR, TYPE #1: TBC-TO-RUNWAY CONNECTOR, SINGLE BARREL LUG. COMPRESSION TYPE CONNECTORS ONLY. 4. CONNECTOR, TYPE #2: TBC TAP CONNECTOR, C-TYPE COMPRESSION TAP. 5. CONNECTOR, TYPE #3: TBC-TO-RACK CONNECTOR, BARREL LUG, 1-BOLT/1-HOLE. 6. FASTENER FOR STRAP SHALL CONSIST OF SELF -TAPPING SCREW WITH LOCK WASHER. FASTENER LENGTH SHALL NOT IMPEDE ON OPPOSITE SIDE OF STRINGER. 7. ABRADE THE FINISH OF THE RACK WHERE THE GROUND WIRES ARE BONDED. BONDING CABLE RUNWAY � 2 SCALE: N.T.S. BT120-JCD505 4ST)?IDE BRT General Engineering Consultant DATE: REVIEWED BY: 09/06/2024 J. ALTCHECH Q w U) cn W J Z J SOUNDTRANSIT DATE: 12/04/2024 SCALE: FILENAME: S1-BT120-J-BLD-v2020 CONTRACT No.: RTA/CN 0205-24 SUBMITTAL DATE: 09/06/2024 STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 TELECOM INSTALLATION DETAILS TRANSIT CENTER R-4332559 DEVELOPMENT ENGINEERING msippo 11 /25/2025 Ul DRAWING NO.: BT120-JCD505 FACILITY ID: BT120 SHEET No: REV: 637 0