GENERAL NOTES:
1. THE PHASING PLANS AND DETOURS SHOWN ARE CONCEPTUAL IN
NATURE AND ARE NOT INTENDED TO SHOW ALL WORK ACTIVITIES OR
INTERIM PHASES THAT WILL BE REQUIRED TO COMPLETE THE WORK.
SUPPLEMENTAL NIGHT SHIFT OR WEEKEND WORK MAY BE REQUIRED.
THE CONTRACTOR SHALL SUBMIT LOCATION SPECIFIC TRAFFIC
CONTROL PLANS TO THE AUTHORITY HAVING JURISDICTION (AHJ) FOR
APPROVAL.
2. TRAFFIC CONTROL SETUP AND CONSTRUCTION HOURS ARE
RESTRICTED TO THE DURATIONS SPECIFIED WITHIN THE SPECIAL
PROVISIONS AND ANY APPLICABLE PERMITS ISSUED BY APPLICABLE
AHJs.
3. THE CONTRACTOR SHALL NOT SCHEDULE ANY CLOSURES
REQUIRING A DETOUR UNTIL ALL RELATED TRAFFIC CONTROL AND
DETOUR PLANS HAVE BEEN APPROVED BY APPLICABLE AHJs.
4. NOTHING IN THESE NOTES OR CONTRACT DRAWINGS SHALL RELIEVE
THE CONTRACTOR OF THE RESPONSIBILITY FOR THE JOB SITE
CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE
PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS
REQUIREMENT SHALL APPLY CONTINUOUSLY IN WORK AREAS AND NOT
BE LIMITED TO WORKING HOURS.
5. BEFORE A ROAD, LANE, OR SIDEWALK CLOSURE, THE CONTRACTOR
SHALL ERECT SIGNS 7 CALENDAR DAYS IN ADVANCE FOR BOTH
DIRECTIONS OF TRAVEL, IF APPLICABLE, NOTIFYING THE
MOTORISTS AND PEDESTRIANS OF THE CLOSURE, UNLESS OTHERWISE
NOTED. THE SIGNS SHALL GIVE THE DATE(S) AND TIME OF THE
CLOSURE.
6. THE CONTRACTOR SHALL GIVE AT LEAST 30 DAYS ADVANCE NOTICE
OF ALL FULL OR PARTIAL STREET, SIDEWALK OR BIKE ROUTE
CLOSURES TO ALL AGENCIES PROVIDING EMERGENCY SERVICES,
INCLUDING, WITHOUT LIMITATION, POLICE, FIRE, AND AMBULANCE
SERVICES.
7. THE CONTRACTOR IS RESPONSIBLE FOR FURNISHING ALL SIGNAGE
REQUIRED FOR TRAFFIC CONTROL AND FOR THE TIMELY INSTALLATION
AND REMOVAL OF THAT SIGNAGE. ALL CONFLICTING SIGNING SHALL BE
COVERED. ADDITIONALLY ALL CLASS B SIGNS SHALL BE REMOVED AND
CLASS A SIGNS BAGGED OUTSIDE NON WORKING HOURS WHEN NOT IN
USE OR NOT APPLICABLE.
8. BUS OPERATIONS SHALL BE MAINTAINED. THE CONTRACTOR SHALL
NOT PHASE THE WORK IN SUCH A MANNER THAT WOULD REQUIRE
CONSECUTIVE TEMPORARY BUS STOPS. COORDINATE WITH KING
COUNTY METRO FOR ANY ANTICIPATED BUS STOP IMPACTS. KCM MUST
RECEIVE A NOTICE AT LEAST 30 BUSINESS DAYS PRIOR TO IMPACTING
ANY EXISTING KCM BUS STOP. KCM MUST RECEIVE A NOTICE AT LEAST
10 BUSINESS DAYS PRIOR TO STREET CLOSURES THAT REQUIRE
TRANSIT DETOURS. CONTACT: (206) 477-1140 OR
CONSTRUCTION. COORD@KINGCOUNTY.GOV.
9. THE CONTRACTOR SHALL PLATE OVER OPEN TRENCHES WHEN NOT
IN OPERATION AND SHALL OPEN TRAFFIC LANES TO NORMAL
OPERATIONS. A NON -SLIP PLATE SURFACE SHALL BE USED.
"MOTORCYCLES USE EXTREME CAUTION" SIGNS ARE REQUIRED, PER
WAC 468-95-306.
10. THE CONTRACTOR SHALL PARTICIPATE IN PUBLIC OUTREACH
PROCESS LED BY SOUND TRANSIT, WSDOT, OR ANY OTHER AHJs.
11. THE CONTRACTOR SHALL MAINTAIN DRIVEWAY ACCESS TO
ADJACENT PROPERTIES AND BUSINESSES THROUGH THE DURATION OF
THE PROJECT, UNLESS OTHERWISE COORDINATED WITH THE
PROPERTY OWNER AND RECEIVED IN WRITING FROM SAID PROPERTY
OWNER. ALL INGRESS AND EGRESS AREAS SHOWN AS "CONSTRUCT
UNDER TRAFFIC" SHALL MAINTAIN ACCESS FOR TRAFFIC THROUGH THE
DURATION OF THE ASSOCIATED STAGE. THE MINIMUM DRIVEWAY OR
AISLE WIDTH SHALL BE 10' PER DIRECTION. FOR MULTIPLE LANE
DRIVEWAYS, CONTRACTOR MUST MAINTAIN THE EXISTING NUMBER OF
LANES, UNLESS OTHERWISE COORDINATED WITH THE PROPERTY
OWNER AND RECEIVED IN WRITING FROM SAID PROPERTY OWNER.
12. THE CONTRACTOR SHALL MAINTAIN 11 FOOT MINIMUM TRAVEL
LANES DURING CONSTRUCTION UNLESS OTHERWISE NOTED. IN CASES
WHERE THE EXISTING LANE WIDTH IS LESS THAN 11 FEET, THE EXISTING
WIDTH MAY BE MAINTAINED.
13. THE CONTRACTOR SHALL PROVIDE A TWO -FOOT LATERAL BUFFER
SPACE BETWEEN THE WORK ZONE AND THE EDGE OF THE NEAREST
TRAVEL LANE.
14. ALL LANE CLOSURES MUST BE ALONG ACTIVE WORK AREAS. THE
CONTRACTOR SHALL OPEN LANES TO TRAFFIC IN AREAS WITH LONG
PERIODS OF INACTIVITY.
12/10/2024 1 ZW I JS IRA
DATE DSN I CHK I APP
ISSUED FOR BID
REVISION
15. FOR STEEP GRADES AND DROP-OFFS WITHIN THE CLEAR ZONE, TEMPORARY
BARRIERS SHALL BE PLACED ON THE TRAFFIC SIDE WITH A MINIMUM OF TWO FEET
BETWEEN THE DROP-OFF AND THE BACK OF THE BARRIER AND A MINIMUM TWO -FOOT
LATERAL BUFFER SPACE TO TRAFFIC. ALL TEMPORARY BARRIERS SHALL BE
MASH -COMPLIANT AND MEET WSDOT REQUIREMENTS.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PEDESTRIAN TRAFFIC CONTROL.
A SIDEWALK ON ONE SIDE OF THE STREET SHALL BE MAINTAINED AT ALL TIMES, OR A
MINIMUM 4-FOOT ADA OR PROWAG COMPLIANT PATH MUST BE PROVIDED. THE
CONTRACTOR SHALL MAINTAIN PEDESTRIAN ACCESS TO CROSSWALKS OR PROVIDE A
PATHWAY UTILIZING A SPOTTER TO GUIDE PEDESTRIANS THROUGH WORK AREAS
WHICH ARE SHOWN AS "CONSTRUCT UNDER TRAFFIC".
17. THE WORK AT INTERSECTIONS SHALL BE PHASED TO MINIMIZE IMPACT TO
PEDESTRIANS. WHERE APPLICABLE, AT LEAST THREE OF THE FOUR AVAILABLE
CROSSING MOVEMENTS AT INTERSECTIONS SHALL BE MAINTAINED AT ALL TIMES.
TEMPORARY ADA-COMPLIANT RAMPS SHALL BE PROVIDED BY THE CONTRACTOR, IF
NEEDED.
18. A PROTECTIVE VEHICLE IS RECOMMENDED. IF A TRUCK MOUNTED ATTENUATOR
(TMA) ISN'T AVAILABLE, A WORK VEHICLE MAY BE USED. WHEN NO TMA IS USED, THE
PROTECTIVE VEHICLE SHALL BE STRATEGICALLY LOCATED TO SHIELD WORKERS, WITH
MINIMUM REQUIRED ROLL -AHEAD DISTANCE.
19. FOR SIGNS, REFER TO MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)
AND WSDOT SIGN FABRICATION MANUAL M55-05.
20. LOCATIONS OF SIGNS AND OTHER TRAFFIC CONTROL DEVICES ARE APPROXIMATE
AND MAY BE RELOCATED TO AVOID OBSTRUCTIONS.
21. THE CONTRACTOR MUST COORDINATE WITH WSDOT MAINTENANCE FOR WORK
THAT WILL AFFECT ANY TRAFFIC SIGNALS ALONG S GRADY WAY AND RAINIER AVENUE
S.
7ntiPc-
TRAFFIC CONTROL SETUP CONSISTS OF ONE ZONE:
ZONE D: SR 167 / RAINIER AVENUE S BETWEEN SR 167 NORTHBOUND OFF -RAMP
TO WESTBOUND 1-405 AND S GRADY WAY.
STAGING AND SEQUENCING:
ZONE D
PHASE 1
PHASE 2
PHASE 3
- CONSTRUCTION ON NORTHBOUND SHOULDER LANE ON SR 167
- CLOSURE OF NORTHBOUND OUTSIDE THROUGH LANE ON SR 167
WHEN NEEDED
- CONSTRUCTION ON NORTHBOUND OFF -ROAD AREA ON SR 167
- NO LANE CLOSURE
- CONSTRUCTION ON NORTHBOUND C-CURB ON RAINIER AVENUE
S AT S GRADY WAY
- CLOSURE OF NORTHBOUND LEFT TURN LANE AND INSIDE
THROUGH LANE ON RAINIER AVENUE S AT S GRADY WAY
SCOPE OF WORK WITHIN IN EACH PHASE IS PROVIDED IN THE MAINTENANCE OF TRAFFIC
AND TRANSIT (MOTT) REPORT. CONTRACTOR HAS OPTION TO SET UP MULTIPLE WORK
PHASES CONCURRENTLY, PROVIDED THAT THESE TRAFFIC CONTROL SETUPS DO NOT
CONFLICT WITH EACH OTHER.
DESIGNED BY:
Z. WANG
DRAWN BY:
Z. WANG
CHECKED BY:
J. SEYER
APPROVED BY:
R.ACEVEDO
SUBMITTED BY:
R. PARGAS
MINIMUM LANE CLOSURE TAPER LENGTH = L (feet)
LANE
Posted Speed (mph)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
E7O
10
105
150
205
270
450
500
550
11
115
165
225
295
495
550
605
660
12
125
180
245
320
540
600
660
720
780
840
MINIMUM SHOULDER TAPER LENGTH = L/3 (feet)
SHOULDER
Posted Speed (mph)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
8'
40
40
60
90
120
130
150
160
170
190
10,
40
60
90
90
150
170
190
200
220
240
USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8'.
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
25
30
35
40
45
50
55
60
65
70
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R
HOST VEHICLE WEIGHT
9,900 TO 22,000 lbs.
HOST VEHICLE WEIGHT
> 22,000 lbs.
< 45 MPH
45-55 MPH
> 55 MPH
< 45 MPH
45-55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
SIGN SPACING
= X (1)
FREEWAYS & EXPRESSWAYS
55 / 70 MPH 1500'
+/-
RURAL HIGHWAYS
60 / 65 MPH 800'
+/-
RURAL ROADS
45 / 55 MPH 500'
+/-
RURAL ROADS & URBAN ARTERIALS
35 / 40 MPH 350'
+/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTIAL & BUSINESS DISTRICTS
25 / 30 MPH 200'
+/- (2)
URBAN STREETS
25 MPH OR LESS 100'
+/- (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE
RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS.
(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT
ROADWAY CONDITIONS.
CHANNELIZATION DEVICE
SPACING feet
MPH
TAPER
TANGENT
50/70
40
80
35/45
30
60
25/30
20
40
SCALE:
Q J NTS
- Q FILENAME:
4Sr.RIDE Ln U)
w J S1-BT120-TMN701
BRT General Engineering Consultant z " SOUNDTRANSIT CONTRACT No.:
RTA/CN 0205-24
1DATE: REVIEWED BY: DATE: DATE:
12/10/2024 1 J. ALTCHECH 112/10/2024 112/10/2024
v
TYPE II BARRICADE
TYPE III BARRICADE
CLASS A CONSTRUCTION SIGN (LONG TERM WORK ZONE)
CLASS B CONSTRUCTION SIGN (SHORT TERM WORK ZONE)
TRAFFIC SAFETY DRUM
SEQUENTIAL ARROW SIGN
TRANSPORTABLE ATTENUATOR
PORTABLE CHANGEABLE MESSAGE SIGN
DIRECTION OF TRAFFIC
TEMPORARY CONCRETE BARRIER
IMPACT ATTENUATOR
UNIFORMED POLICE OFFICER (UPO)
FLAGGING STATION
WORK AREA
CONSTRUCT UNDER TRAFFIC
POTENTIAL TEMP BUS STOP LOCATION
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER RDWY IMP
BT120
TRAFFIC
TRAFFIC CONTROL NOTES
SR167
T-433280
�:_ ► ►•
BT120-TMN701
FACILITY ID:
BT120
SHEET No.: REV:
675 0