HomeMy WebLinkAboutMFP26000825.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP26000825
IVR Number: 26000825
Permit Information
Permit Name: Puget Sound Energy Gas RS-1023 Job# 889005217 Compliance Regulator Station
InspectionAddress/Location:02/17/2026Application Date:8899000010Parcel Number: 401 S 26TH ST
Permit Type:02/24/2026Issue Date:Franchise
Permit Work Class:02/24/2027Expiration Date:Minor Utility
Job Number: 889005217Franchise Type:Natural Gas
Description: PSE Gas Regulator Compliance Inspection
Contacts
Name Address PhoneTypeBilling
Katie Zimmerman
Puget Sound Energy
1660 Park Lane
Burlington, WA 98233
B: (425) 620-6742
C: (425) 620-6742
Applicant
Courtney Xiong
Puget Sound Energy
6500 Ursula Pl S
Seattle, WA 98108
B: (206) 348-0676Applicant
Georgia Savoy
Puget Sound Energy
6500 Ursula Pl S
Seattle, WA 98108
B: (206) 276-1480ApplicantX
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Applicant
Devin Boblitt
INFRASOURCE SERVICES
14103 Steward Rd
Sumner, WA 98390
C: (206) 550-3293Contact
Stuart Bennett
Infrasource Services LLC
1622 Eastport Plaza Dr
Collinsville, IL 62234
B: (303) 419-8755
H: (425) 677-5197
C: (713) 985-6489
Contact
Puget Sound Energy 622 W Perimeter Rd
Renton, WA 98057
Contractor
Business License Number: 663Electrical Contractor: PUGETSE033DD
Construction Contractor: PUGETSE032J1
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Katie Zimmerman
Puget Sound Energy
1660 Park Lane
Burlington, WA 98233
B: (425) 620-6742
C: (425) 620-6742
Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
PUBLIC WORKS DEPARTMENT
Page 1 of 6 | Published: 3/12/2025
Transportation Systems Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 3/12/2025
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK AND FOR TRAFFIC SIGNAL
WORK WITHIN 150 FEET OF THE INTERSECTION AT LEAST FIFTEEN (15) WORKING DAYS BEFORE THE DATE OF WORK.
FOR PURPOSES OF THIS APPLICATION, WORKING DAYS ARE DEFINED AS MONDAY THRU FRIDAY, AND EXCLUDING
CITY HOLIDAYS.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a Traffic
Control Plan (TCP) and obtain City's approval of that plan when construction, repair, or maintenance work is to be
conducted within the City's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. All TCPs must conform to all attached requirements. Failure to do so may be subject to resubmittal.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
4. Resubmittal may be required for TCPs that are incomplete and do not display proper requirements as
described in the guidelines. Additional review time may be needed.
By signing, I certify that the information on this application and within the submittal documents are accurate to the
best of my knowledge and I acknowledge and have read all the requirements and guidelines on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip: ___________
Description of Work:
24 Hour Emergency
Contact Name & Phone:
Approval By: ______________________________________________ Date:____________________
PW/Transportation or CED/Development Engineering Division
Monday Friday 9:00am 2:00pm
MFP26000825
Scott Warlick CED 2/24/2026
S
2
6
T
H
S
T
11 11
11 11
18
18
BU
S
ST
O
P
BU
S
ST
O
P
STOP
W2
0
-
1
ROAD
WORK
AHEAD
W2
0
-
4
ONE LANE
ROAD
AHEADX'
≥
X'
≥
X'≥W2
0
-
7
A
TA
L
B
O
T
R
D
S
DETO
U
R
M
4
-
9
B
DETOUR M4
-
9
B
STOP
W2
0
-
1
ROAD
WORKAHEAD
W2
0
-
4
ONE LANE
ROADAHEAD X'
≥
X'
≥
X'≥
W2
0
-
7
A
TA
L
B
O
T
R
D
S
PROTECTIVE
VEHICLE
curb faceLevel Landing
from Sidewalk to curb edge
non-skid material
Level Landing
from Ramp onto
street surface
non-skid material
Ramp Surface ADA compliant (12:1 slope)
non-skid material (crew will assist)
Stabilized material for
full ramp support
12:
1
s
l
o
p
e
4' Minimu
m
6" Min ADA compliant
detectable strip
CREW WILL USE ADA COMPLIANT
RAMPS FOR PEDESTRIAN DIVERSION
STOP
W
2
0
-
1
ROA
D
WOR
K
AHE
A
D
BE
PRE
P
A
R
E
D
TO
STO
P
W
3
-
4
X'
≥
X'
≥
X'≥
W
2
0
-
7
A
MOVE BUS STOP
APPROXIMATELY 150' NORTH.
N
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
Sultan Wakid
425-424-6658
Sultan.Wakid@pse.com
1 OF 1400 S 26TH ST, RENTON, WA
0
2313194
02/11/2026
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated,
if indicated use ADA compliant channelization.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 10' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place during approved work hours as
per jurisdictional requirements. (Generally between 9
a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3
p.m. on arterials. If night time work is approved,
signaling and flaggers shall conform to WAC
296-155-305. Night time work to take place between
_____________and ______________.)
8. All Flagger and Downstream tapers shall be 50'-100'.
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
WORK AREA
CHEVRON
ARROW BOARD
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
WORK PIT
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
10
11
12
20
70
75
80
25
105
115
125
30
150
165
180
35
205
225
245
40
270
295
320
45
475
495
540
POSTED SPEED (MPH)
50
500
550
600
55
550
605
660
60
-
660
720
65
-
-
780
70
-
-
840
TEMPORARY TRAFFIC CONTROL PLAN
Puget Sound EnergyTraffic Control Supervisor:John Crofoot
Card No. IS 6 100071
Card Exp. 10/10/28
John.Crofoot@pse.com
(425)424-6658
MFP26000825
Site Plan – RS-1023 S 26 ST & TALBOT RD, RENTON
MFP26000825
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP26000825
(Date)(Signature)
Page 2 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES