HomeMy WebLinkAboutChange Order - 04CITY OF RENTON Community and Economic Development CONTRACT CHANGE ORDER AGREEMENT 2/12/2026 CONTRACT: CAG-25-257 CONTRACTOR: Andersen Construction Company of Washington, LLC CHANGE ORDER: 4 SUMMARY OF PROPOSED CHANGE: DESCRIPTION: ORIGINALCONTRACT AMOUNT (W/OUT WSST) CURRENTCONTRACT AMOUNT (W/OUT WSST) NETCHANGETHIS ORDER (W/OUT WSST) REVISEDCONTRACT TOTAL AFTER CHANGE $1,248,000 $1,587,458.78 $5,010.71 $1,592,469.49 Additional Calendar Days: None. SIGNATURES: Contractor:Date: Bogdan Tishchenko, Andersen Construction Company of WA, LLC ProjectManager:Date Paul Hintz, Project Manager ApprovedBy:Date: Justin Johnson, Development Engineering Director ApprovedBy:Approved via email 2/13/26 Date: 2/13/2026 Gina Estep, CED Administrator ApprovedBy:Approved via email 2/19/2026 Date 2/19/2026 Cheryl Beyer, Senior Assistant City Attorney Item No.Qty. Description UnitPrice Amount w/WSST 11„ôŘϙ‡>Iϙ͏͓͓ϠϙċŪŘIJĖŜēϙÍIJîϙĖIJŜťÍīīϙŜťÍĖIJīôŜŜϙŜťôôīϙƲÍŜēĖIJČϙÍťϙťēôϙċŘĺIJťϙ metal panel overhang to provide support for the weather-resistive barrier (WRB). N/A $3,065.00 2 1 Per RFI 042, furnish and install plywood backing at the three awnings to support attachment of DMD metal panels. N/A $1,945.71 $ - $ - Totalthis Change Order: $ 5,010.71                       CAG-25-257, CO #4-26 Page: 1 of 1 CHANGE ORDER NO. 00 Andersen Construction Company of Washington LLC5601 6th Ave South Suite 550 Seattle WA 98108 USA 00 Legacy Square Phase 2 PROJECT: CHANGE ORDER NUMBER: Issue Date: 02/02/2026 510 South 3rd Street Renton, WA 98057 OWNER: OWNER: ARCHITECT: CONTRACTOR: FIELD: OTHER:CONTRACT DATE: CONTRACT FOR: ARCHITECT'S PROJECT NO: 10/30/2025 General Construction THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if application, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) The original Contract Sum was $1,248,000.00 The net change by previously authorized Change Orders $339,458.78 $1,587,458.78The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of $5,010.71 The New Contract Sum Including This Change Order $1,592,469.49 RESERVATION OF RIGHTS: This Change Order includes the direct cost elements identified above and, unless otherwise specifically stated, does not include any amount for changes in the sequence of work, delays, disruption, rescheduling, extended overhead, acceleration, and/or impact costs which are not possible to assess at the present time. Right is expressly reserved to make claim for any and all of these related items of compensable cost overrun prior to final settlement of this Contract. This Change Order does not include adjustments to the Contract Sum or Contract Time that have been authorized by CCD, but which have not yet been incorporated into a Change Order. NOT VALID UNTIL SIGNED BY THE CONTRACTOR AND OWNER (Firm name) BY (Signature) (Typed Name) DATE (Firm name) BY (Typed Name) CONTRACTOR DATE (Signature) (Signature) OWNER DATE (Firm name) BY (Typed Name) Andersen Const. Co. of WA Bogdan Tishchenko ARCHITECT RFI 44 Added Stainless Steel for WRB Continuity $3,065.00CR-010 RFI 42 Added Plywood at Awnings $1,945.71CR-011 This fixed-price Change Order includes all labor, materials, and equipment, costs for the following approved scope revisions: CR-010: Per RFI 044, furnish and install stainless steel flashing at the front metal panel overhang to provide support for the weather-resistive barrier (WRB). CR-011: Per RFI 042, furnish and install plywood backing at the three awnings to support attachment of DMD metal panels. Note:**Costs do not include general condition and general requirement cost compensation for time impacts. Andersen reserves our rights to general condition and general requirement cost compensation for time impacts caused by this change should they be needed at the end of the project.** Pricing does not include Washington State Sales Tax (WSST). WSST will be applied at each billing.          BUILDER OF CHOICE Page 1 of 2 Change Request CR-010 February 05, 2026 Job Name: Legacy Square Phase 2 Job Number: AWA25SP016 Subject: RFI 44 Added Stainless Steel for WRB Continuity Date Initiated: 2026-01-29 This change request is submitted, as required, for your review and approval. Amount: $3,065.00 Time Extension Requested: Reference: Scope Description: RFI 44 Added Stainless Steel for WRB Continuity Change Request Cost Breakdown Direct Cost of Work Amount Added Stainless Steel Flashing for WRB Continuity - Insulpro $2,500.00 Jobsite Cleanup $232.00 Dumpster Fee $65.00 Subtotal $2,797.00 Cost of Work Add-Ons Volume Driven Liability Insurance (1.25%) $37.00 Bonding (1.00%) $30.00 Overhead / Profit up to the first $50,000 (16%) $48.00 Payroll Driven Liability Insurance (1.25%) $3.00 Overhead / Profit up to the first $50,000 for each subcontractor (6%) $150.00 Total Change Request Amount $3,065.00 Supporting documentation and detailed cost of work is attached as required. Please indicate your approval of this Change Request by signing below and returning one (1) copy of this transmittal letter to Andersen Construction. The Change Request will be incorporated in a su bsequent Contract Change Order. By executing of this Change Order, contractor acknowledges and agrees that it has been fully compensated for all change in the Contract Sum and Contract Time effected through a written change order, satisfaction for all costs incurred, labor performed, and material and equipment furnished. Contractor: Owner: Andersen Construction Company of Washington LLC Date City of Renton Date Bogdan Tishchenko                                                 ADDING A CONTINUOUS STAINLESS STEEL FLASHING IS ACCEPTABLE CL/MITHUN Per Details 11/A5.40 and 10/S6.02, the PL 1/4" × 6" steel plates are indicated to be installed at 3'-0" O.C., which creates voids between the plates. Detail 11/A5.40 also shows the WRB lapping over the steel plate condition. The WRB cannot span or bridge across the voids between the steel plates as currently detailed. As shown in the proposed rendering, we suggest providing a continuous stainless steel flashing wrapped around the steel plates to create a continuous substrate for the WRB to lap over and maintain proper continuity. Please advise if this proposed approach is acceptable, or provide an alternate detail to address WRB continuity at this condition. Legacy Square Ph. 2 Andersen Construction ASAP 1/14/2026 Anton Sidor 08 TBD TBD ✔ ✔          WA L L P A N E L CO V E R F L A S H I N G E N G A G E D IN T O 2 0 G A S T A I N L E S S S T E E L CL E A T WR B 20 G A S T A I N L E S S ST E E L C L E A T 1/ 4 " S T E E L P L A T E 3' - 0 " O . C . R O U T E D IN T O C L T CL T                                             CO V E R F L A S H I N G E N G A G E D I N T O 20 G A S T A I N L E S S S T E E L C L E A T CL T 1/ 4 " S T E E L P L A T E 3' - 0 " O . C . CO N T I N U E S 2 0 G A ST A I N L E S S S T E E L C L E A T                                             BUILDER OF CHOICE Page 1 of 2 Change Request CR-011 February 05, 2026 Job Name: Legacy Square Phase 2 Job Number: AWA25SP016 Subject: RFI 42 Added Plywood at Awnings Date Initiated: 2026-01-29 This change request is submitted, as required, for your review and approval. Amount: $1,945.71 Time Extension Requested: Reference: Scope Description: RFI 42 Added Plywood at Awnings Change Request Cost Breakdown Direct Cost of Work Amount Furnish and Install Plywood at Awnings $1,182.71 Hilti Equipment Rental $215.00 Jobsite Cleanup $232.00 Subtotal $1,629.71 Cost of Work Add-Ons Payroll Driven Liability Insurance (1.25%) $12.00 Volume Driven Liability Insurance (1.25%) $24.00 Bonding (1.00%) $19.00 Overhead / Profit up to the first $50,000 (16%) $261.00 Overhead / Profit up to the first $50,000 for each subcontractor (6%) $0.00 Total Change Request Amount $1,945.71 Supporting documentation and detailed cost of work is attached as required. Please indicate your approval of this Change Request by signing below and returning one (1) copy of this transmittal letter to Andersen Construction. The Change Request will be incorporated in a su bsequent Contract Change Order. By executing of this Change Order, contractor acknowledges and agrees that it has been fully compensated for all change in the Contract Sum and Contract Time effected through a written change order, satisfaction for all costs incurred, labor performed, and material and equipment furnished. Contractor: Owner: Andersen Construction Company of Washington LLC Date City of Renton Date Bogdan Tishchenko                                                 OPTION 2 IS ACCEPTABLE. CL/MITHUN Detail 4/A5.40 depicts a 1/2" steel awning with the metal roof panel installed over the steel plate. As detailed, this condition is not constructible. Please advise on the preferred approach from the following options: Option 1: Stop the standing seam roof panel above the 1/2" steel plate and do not clad the plate. This would be similar to shroud Detail 17/A5.41. Option 2: Install 1/2" plywood over the steel plate and attach it using a Hilti powder-actuated nailer (see SK-1), then fasten the metal flashing/panel to the plywood. Please confirm which option is acceptable or provide an alternate detail. Legacy Square Ph. 2 Andersen Construction ASAP 1/21/2026 SK-1 Anton Sidor 07 TBD TBD ✔ ✔          1/ 2 " P L Y W O O D A T T A C H E D W / HI L T I P O W E R - A C T U A T E D N A I L E R CO R - T A N F L A S H I N G T R I M # 7 X 7 / 1 6 " P A N H E A D S C R E W RO O F P A N E L S WR B 1/ 2 " A W N I N G S T E E L 1 / 1 2 " 1 1 / 2 " 1/ 2 " A W N I N G S T E E L CO R - T A N F L A S H I N G T R I M 1/ 2 " P L Y W O O D A T T A C H E D W / H I L T I PO W E R - A C T U A T E D N A I L E R # 7 X 7 / 1 6 " P A N H E A D S C R E W SK - 0 4 2