HomeMy WebLinkAbout03-02-2026 - Addendum No. 3 - Renton Sr. CenterBCRA 2106 Pacific Avenue, Suite 300 Tacoma, Washington 98402 (253) 627-4367 ADDENDUM NO. 3 PAGE 1 OF 10 Don Persson Renton Senior Activity Center: Exterior & HVAC Improvements City of Renton (CAG-26-032) February 27, 2026 City of Renton Don Persson Renton Senior Activity Center Exterior & HVAC Improvements (CAG-26-032) Renton, WA ADDENDUM NO. 3 February 27, 2026 This Addendum forms a part of the Contract Documents and modifies the original Contract Documents dated January 16, 2026 as noted below. Acknowledge receipt of this Addendum In the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification. This Addendum is issued to all known Plan Holders. This Addendum consists of 10 pages plus attachments. Pre-Bid Site Visit: A pre-bid site visit is scheduled for March 4 at 9:30am. Attendance is optional and by appointment only. Contact Alisha Smothers by email (City of Renton: ASmothers@Rentonwa.gov) no later than 5:00pm on March 3, 2026 to confirm attendance. ATTACHMENTS NOTE: Addendum changes to the Drawings are issued on full size drawing sheets (30”x 42”); these changes are noted by a cloud drawn around the change and a revision number in a triangle as follows: 1. Revised Form A BID FORM (7 pages, 8-1/2” x 11”) 2. New Specification Section 01 2200 – BID ALTERNATES (2 pages, 8-1/2” x 11”) 3. Revised Specification Section 23 7416 – PACKAGED ROOFTOP AIR-CONDITIONING UNITS (14 pages, 8-1/2” x 11”) 4. Revised Specification Section 23 8126 – SPLIT-SYSTEM AIR CONDITIONERS (10 pages, 8- 1/2” x 11”) 5. Revised Drawing Sheet G-101 (1 page, 22” x 34”) 6. Revised Drawing Sheet AD121 (1 page, 22” x 34”) 7. Revised Drawing Sheet AD122 (1 page, 22” x 34”) 8. Revised Drawing Sheet A-121 (1 page, 22” x 34”) 9. Revised Drawing Sheet A-151 (1 page, 22” x 34”) 10. Revised Drawing Sheet A-201 (1 page, 22” x 34”) ADDENDUM NO. 3 PAGE 2 OF 10 Don Persson Renton Senior Activity Center: Exterior & HVAC Improvements City of Renton (CAG-26-032) February 27, 2026 11. Revised Drawing Sheet A-611 (1 page, 22” x 34”) 12. Revised Drawing Sheet M-001 (1 page, 22” x 34”) 13. Revised Drawing Sheet M-003 (1 page, 22” x 34”) 14. Revised Drawing Sheet M-005 (1 page, 22” x 34”) 15. Revised Drawing Sheet MD-101 (1 page, 22” x 34”) 16. Revised Drawing Sheet MD-103 (1 page, 22” x 34”) 17. Revised Drawing Sheet M-201 (1 page, 22” x 34”) 18. Revised Drawing Sheet M-203 (1 page, 22” x 34”) 19. Revised Drawing Sheet E-002 (1 page, 22” x 34”) 20. Revised Drawing Sheet E-003 (1 page, 22” x 34”) 21. Revised Drawing Sheet ED-101 (1 page, 22” x 34”) 22. Revised Drawing Sheet ED-102 (1 page, 22” x 34”) 23. Revised Drawing Sheet E-101 (1 page, 22” x 34”) 24. Revised Drawing Sheet E-102 (1 page, 22” x 34”) 25. Revised Drawing Sheet E-103 (1 page, 22” x 34”) 26. Revised Drawing Sheet E-201 (1 page, 22” x 34”) ADDENDUM NO. 3 PAGE 3 OF 10 Don Persson Renton Senior Activity Center: Exterior & HVAC Improvements City of Renton (CAG-26-032) February 27, 2026 SPECIFICATIONS SECTION 00 8000 – FORMS 1. REPLACE Form A BID FORM in its entirety with revised BID FORM attached; this revised BID FORM shall be used for submitting Bid. Changes made are the Bid Time is 10:00 AM and Bid Alternate No. 1 has been added to form. SECTION 01 2200 – BID ALTERNATES 1. ADD specification Section 01 2200 – Bid Alternates attached. SECTION 08 8000 – GLASS AND GLAZING 1. REVISE the low emissivity glass product specified in Paragraph 2.03 B. 2. as follows: 2. Vitro Architectural Glass Solarban 65 Clear. SECTION 23 7416 – PACKAGED ROOFTOP AIR-CONDITIONING UNITS 1. REPLACE Section 23 7416 Packaged Rooftop Air-Conditioning Units in its entirety with revised specification section attached. SECTION 23 8126 – SPLIT-SYSTEM AIR CONDITIONERS 1. REPLACE Section 23 8126 Split-System Air Conditioners in its entirety with revised specification section attached. ADDENDUM NO. 3 PAGE 4 OF 10 Don Persson Renton Senior Activity Center: Exterior & HVAC Improvements City of Renton (CAG-26-032) February 27, 2026 DRAWINGS (This narrative includes a brief description of addendums items. All clouded items on the addendum sheet to be included in the project bid.) SHEET G-101 – INDEX SHEET, PROJECT INFORMATION, PROJECT TEAM 1. ADD Bid Alternate No. 1: Kitchen Area HVAC Upgrades to the project description. SHEET AD121 – FIRST FLOOR DEMOLITION PLAN 1. ADD callout for Bid Alternate No. 1 area of work. 2. REVISE flag note callout at grid line A to show “D1”. 3. ADD note to protect (2) existing windows and stained glass to remain. SHEET AD122 – SECOND FLOOR DEMOLITION PLAN 1. REVISE flag note callout at grid line E to show “D1”. SHEET A-121 – FIRST FLOOR PLAN 1. ADD callout for Bid Alternate No. 1 area of work. 2. ADD note regarding access to kitchen area HVAC equipment. 3. REVISE wall type callout on grid line A to tag typical wall assembly. 4. ADD note to protect (2) existing windows and stained glass to remain. SHEET A-151 – FIRST FLOOR REFLECTED CEILING PLAN 1. ADD callout for Bid Alternate No. 1 area of work. SHEET A-201 – EXTERIOR ELEVATIONS 1. ADD note to protect (2) existing windows to remain. ADDENDUM NO. 3 PAGE 5 OF 10 Don Persson Renton Senior Activity Center: Exterior & HVAC Improvements City of Renton (CAG-26-032) February 27, 2026 SHEET A-611 – WINDOW TYPES 1. ADD Energy Code Summary with Washington State Energy Code (WSEC) information. 2. REVISE Glazing Types legend to include information on insulated glazing units. 3. REVISE Window Types General Notes to include WSEC requirements for energy performance. SHEET M-001 – MECHANICAL LEGEND, NOTES, & SCHEDULES 1. ADD notes pertaining to BABAA requirements for all mechanical equipment. 2. ADD notes pertaining to bid alternate for the kitchen HVAC upgrades SHEET M-003 – MECHANICAL SCHEDULES 1. REPLACE heat pump schedule in its entirety to reflect Trane as basis of design. 2. REPLACE split-system schedule in its entirety to reflect Trane as basis of design. SHEET M-005 – MECHANICAL SCHEDULES 1. REPLACE dx coil schedule in its entirety to reflect Trane as basis of design. SHEET M-101 – MECHANICAL DEMOLITION PLAN – FIRST FLOOR 1. ADD notes and callout to kitchen area HVAC equipment demolition to define as falling under the add alternate bid. SHEET M-103 – MECHANICAL DEMOLITION PLAN – ROOF 1. ADD notes and callout to kitchen area HVAC equipment demolition to define as falling under the add alternate bid. SHEET M-201 – MECHANICAL REMODEL PLAN – FIRST FLOOR 1. ADD notes and callout to kitchen area HVAC equipment demolition to define as falling under the add alternate bid. 2. ADD backdraft dampers and motorized dampers to exterior penetrations for all new ERV’s to be installed on project, as discussed in pre-bid walk through. ADDENDUM NO. 3 PAGE 6 OF 10 Don Persson Renton Senior Activity Center: Exterior & HVAC Improvements City of Renton (CAG-26-032) February 27, 2026 SHEET M-203 – MECHANICAL REMODEL PLAN – ROOF 1. ADD notes and callout to kitchen area HVAC equipment demolition to define as falling under the add alternate bid. SHEET E-002 – SINGLE LINE DIAGRAM AND PANEL SCHEDULES 1. REVISE panel M, calling out panelboard replacement. 2. REVISE panel schedule D, circuits 7,9,11 notes to call out existing breaker, new load. 3. ADD notes to panel K1, specifying all breakers and loads are existing. SHEET E-003 – PANEL SCHEDULES 1. REVISE panel schedule M, remove ‘existing’ text, revise AIC rating to 42,000, fill in missing information for circuits 26,28,30, update load and breaker size for HP-4, 10,11. 2. REVISE panel schedule M2, updated breaker 25 description from Duct Heater 1 to EDH Heater 1, updated load and breaker size for HP-1,2,3,5,6,7,8. 3. REVISE pole information for HP-1 and HP-5 4. REVISE panel schedule P-2, update breaker and load information for HP-9. SHEET ED-101 – ELECTRICAL DEMOLITION PLAN – FIRST FLOOR 1. ADD general note 3 for additional information regarding surrounding lights, receptacles, camera, etc. during siding installation. 2. REVISE door location for electrical room to match actual condition. 3. ADD lights and callout in siding installation zones. 4. ADD callout note for panel M replacement. SHEET ED-102 – ELECTRICAL DEMOLITION PLAN – SECOND FLOOR 1. ADD general note 3 for additional information regarding surrounding lights, receptacles, camera, etc. during siding installation. ADDENDUM NO. 3 PAGE 7 OF 10 Don Persson Renton Senior Activity Center: Exterior & HVAC Improvements City of Renton (CAG-26-032) February 27, 2026 SHEET E-101 – ELECTRICAL REMODEL PLAN – FIRST FLOOR 1. ADD general note 6 for contractor instructions on drawing documentation for existing and new electrical controls. 2. ADD homerun to EDH-1 and revision of circuit tag MS-3 to M2-25,27,29. 3. REVISE door location for electrical room. 4. REMOVE MS panel. SHEET E-102 – ELECTRICAL REMODEL PLAN – SECOND FLOOR 1. ADD symbol and construction note for conduit connection to panel M. 2. ADD general note 6 for contractor instructions on drawing documentation for existing and new electrical controls. SHEET E-103 – ELECTRICAL REMODEL PLAN – ROOF 1. ADD general note 6 for contractor instructions on drawing documentation for existing and new electrical controls. 2. RELOCATE disconnect mounted on EF-2 and switched to combo motor starter. 3. RELOCATE HP-4 disconnect, shifting to the right for clearance purposes. 4. RELOCATE HP-6,7 disconnect, shifting to the right for clearance purposes. 5. REVISE AS disconnect ratings for HP – 1,2,3,5,6,7,10. SHEET E-201 – ELECTRICAL DETAILS 1. REMOVE Mechanical Unit Disconnect detail previously noted as detail 4. ADDENDUM NO. 3 PAGE 8 OF 10 Don Persson Renton Senior Activity Center: Exterior & HVAC Improvements City of Renton (CAG-26-032) February 27, 2026 GENERAL BIDDER QUESTIONS 1. Q) Specification section 075423 1.07A states that the single-ply roofing manufacturer is responsible for providing the technical design of the total roofing system. Please confirm the design documents are inclusive of the complete roofing scope, and do not require further design by the roofing subcontractor/manufacturer. A) The drawings show the scope of work for the roofing replacement but do not show all of the technical installation requirements and details required by the roofing manufacturer for every condition on the roof. The roofing system manufacturer has detailed installation requirements and details for roofing conditions which the roofing installer is required to know and include in their bid. 2. Q) Various specification sections contain verbiage stating that products must comply with the requirements of the Build America, Buy America Act (BABAA). Contractor assumes that all specified products are in compliance with this BABAA requirement. Please confirm. For example, Marlin Windows are specified in 085213. Contractor assumes these windows meet BABAA requirements. A) Section 01 6000 1.04 A. states it is the Contractor’s responsibility to ensure all materials used in project meet BABAA requirements. To the best of our knowledge, the primary basis of design products and equipment specified comply with BABAA requirements. BABAA compliance shall be confirmed prior to submitting a bid. Some manufacturers may be able to provide BABAA compliant products upon request but it is not their standard offering. Therefore, Contractors should require each supplier and subcontractor to confirm BABAA compliance in their bid/quote or they are at risk. 3. Q) If a specified product is determined to not meet BABAA requirements, please clarify how contractor is to bid alternate BABAA compliant products. It will be difficult to submit substitution requests as bidding general contractors will typically not become aware of this until subcontractor bids are received one or two days prior to the bid date. A) Section 01 6000 1.04 A. states it is the Contractor’s responsibility to ensure all materials used in project meet BABAA requirements. It is the Contractor’s responsibility to set up how they receive quotes to avoid this scenario. Contractors should require each supplier and subcontractor to confirm BABAA compliance in their bid/quote or they are at risk. 4. Q) Note #1 on drawing S-201 (and other Structural drawings) reference verifying existing sheathing nailing at various wood framed conditions. Please clarify the required scope that bidders should include in their bid amount for this work. A) Existing sheathing to be verified at walls marked with detail 1/S-301. Detail 1/S-301 indicates the same information. ADDENDUM NO. 3 PAGE 9 OF 10 Don Persson Renton Senior Activity Center: Exterior & HVAC Improvements City of Renton (CAG-26-032) February 27, 2026 5. Q) Detail 1/S-301 is designated on drawing S-201 between GL's 19&20 and along GL P, between two HDU 5 callouts. This detail is not indicated between GL's 20&21 along GL P between two HDU 5 callouts. Please confirm detail 1/S-301 as shown on S-201 is only to occur between HDU callouts where specifically called out. A) Detail 1/S-301 is indicated to occur the entire length of the wall that is framed with full height shear walls. At the requested location, the full height wall is only between Grid 19 and 20. 6. Q) Drawing M-201 shows new ERV and ductwork over the kitchen (cooking area). It was discussed during the Prebid that the kitchen needs to stay operational for approximately 4 hours each day. This work will require removal of ceilings. Contractor assumes that this work can be done after hours and that the ceiling can remain open until required work is complete. A) At the contractor’s option, access to HVAC equipment at the kitchen area may be provided through existing walls at the adjacent Banquet Hall. 7. Q) Specification 061000 indicates in section 1.05B the qualifications for framing carpenters. As this project requires only minor installation of blocking, renailing, anchor bolts, and hold- downs, please confirm this will be a requirement on the project. A) The qualification for journeyman carpenters is required. This project is paying the prevailing wage set by the State for journeyman carpenters, therefore the journeyman carpenters need to be qualified and trained as journeyman carpenters. 8. Q) Specification section 008000 Form A Bid Form indicates bids due 2pm PDT March 12, 2026. Section 001113 Advertisement for Bids indicates bids due 10am on March 12, 2026. Please confirm bid time. If possible, can bid be due at 2pm. A) Bids are to be submitted prior to 10:00am on March 12, 2026. Please use the revised Form A Bid Form that is included in Addendum No. 3. 9. Q) Section 003100 Information Available to Bidders - Limited Asbestos and Universal Waste Survey appears to indicate removal of 400ea. 4' fluorescent tubes and electronic ballasts throughout the building. This scope does not appear to be required by our design drawings - please clarify. Also, please clarify any hazardous materials scope we are to include. A) Paragraph 1.03 of Section 00 3100 Information Available to Bidders states that the Limited Asbestos and Universal Waste Survey “is for information and reference purposes only and does not contain Contract Work.” The project has no proposed hazardous materials work. ADDENDUM NO. 3 PAGE 10 OF 10 Don Persson Renton Senior Activity Center: Exterior & HVAC Improvements City of Renton (CAG-26-032) February 27, 2026 Approved Substitutions: The following manufacturers are acceptable subject to their ability to provide products conforming to the requirements of the Drawings and Specifications. (Inclusion in this list does not necessarily constitute approval of these manufacturer’s standard products.) Section Item Manufacturer(s) Approved 07 54 23 TPO Single-Ply Roofing System Duro-Last DURO-TECH 60-mil Induction Welded Mechanically Fastened Reinforced TPO Single-Ply Roofing System END OF ADDENDUM NO. 3 DON PERSSON RENTON SENIOR ACTIVITY CENTER EXTERIOR & HVAC IMPROVEMENTS CAG-26-032 Bid Form – FORM A DON PERSSON RENTON SENIOR ACTIVITY CENTER EXTERIOR & HVAC IMPROVEMENTS Page 1 of 7 Bid Form – Form A CITY OF RENTON HAND DELIVER TO: OFFICE OF THE CITY CLERK RENTON CITY HALL – LOBBY 1055 S. GRADY WAY, RENTON, WA, 98057 B I D F O R M for the DON PERSSON RENTON SENIOR ACTIVITY CENTER EXTERIOR & HVAC IMPROVEMENTS 211 Burnett Avenue North Renton, WA 98057 Bids Due: 10:00 AM PDT March 12, 2026 Bidder’s Name: Address: Telephone: (MUST BE COMPLETED AND SIGNED) Having carefully examined the Bidding Documents and Instructions to Bidders, the Project site and conditions affecting the Work, and all Addenda, the undersigned Bidder certifies that: (i) it has the personnel and means to complete the Work and (ii) it will furnish all labor, materials, equipment, and management to perform all Work required by, and in strict accordance with, the above-named documents for the following sum within the time fixed. All Bid amounts shall include overhead, profit, bonds, insurance, and any other expense required to complete the Work (excluding Washington State Sales Tax). The undersigned Bidder certifies that it is, at the time of submitting the Bid, and shall remain throughout the period of the Contract, licensed by the State of Washington to perform the type of work required under the Contract Documents. It further certifies that it is skilled and regularly engaged in the general class and type of work called for in the Contract Documents. DON PERSSON RENTON SENIOR ACTIVITY CENTER EXTERIOR & HVAC IMPROVEMENTS CAG-26-032 Bid Form – FORM A DON PERSSON RENTON SENIOR ACTIVITY CENTER EXTERIOR & HVAC IMPROVEMENTS Page 2 of 7 Bid Form – Form A A. BASE BID The Bidder agrees to complete the Work for this Project for the following lump sum Base Bid amount: DOLLARS (words) $ (numerals) Do not include in the Base Bid amount Washington State Sales Tax that will be paid based on the Contract Sum. B. ALTERNATIVE See specification Section 01 2200 – Bid Alternates and Drawing Sheets in the Bidding Docu- ments for description of Alternate. Alternate shall not be included in the Base Bid amount. Alternates selected by the Owner will be added to the Base Bid amount. • Add Alternate #1 – Kitchen Area HVAC Upgrades: ADD Dollars (words) ($ ) (numerals) Do not include in the Alternate amounts Washington State Sales Tax that will be paid based on the Contract Sum. C. TRENCH EXCAVATION SAFETY PROVISIONS The Base Bid amount includes any trench-excavation safety provisions required for compliance with Chapter 39.04 RCW and Chapter 49.17 RCW, as applicable, and the amount included in the Base Bid is: $ . D. SUBCONTRACTOR LISTING If the Project is expected to cost $1,000,000 or more, as required by RCW 39.30.060, every Bidder must complete and provide the included Subcontractor listing forms (Forms C and Form D) in accordance with the applicable timing requirements. E. RECEIPT OF ADDENDA Bidder acknowledges receipt of the following addenda: Addendum No. Addendum No. Addendum No. Addendum No. DON PERSSON RENTON SENIOR ACTIVITY CENTER EXTERIOR & HVAC IMPROVEMENTS CAG-26-032 Bid Form – FORM A DON PERSSON RENTON SENIOR ACTIVITY CENTER EXTERIOR & HVAC IMPROVEMENTS Page 3 of 7 Bid Form – Form A All requirements therein are included in the appropriate Bid amount. F. CONDITIONS OF PROPOSAL 1. Determination of Low Bidder: a. The City of Renton (alternatively referred to as “Owner” or “City”) reserves the right to award the Contract for the Project based on the Contractor’s Base Bid and any selected Alternate(s), in whatever manner is in the City’s best interest. 2. Overhead and Profit: a. All of the above Bid Prices shall include overhead, profit, bonds, insurance, and any other expense required to complete the Work (excluding Washington State Sales Tax). G. PERIOD OF BID VALIDITY/ACCEPTANCE OF BID The undersigned hereby agrees that this Bid shall be a valid and firm offering for the period of sixty (60) days from the Bids Due date. Within sixty (60) days from the Bids Due date, the City will act either to accept the Bid Form the lowest responsive and responsible Bidder, or to reject all Bids. The City reserves the right to request extensions of such Bid acceptance period. The acceptance of a Bid will be evidenced by a written Notice of Intent to Award Contract to the Bidder whose Bid is under consideration for acceptance, together with a request to furnish a bond (if required), evidence of required insurance to execute the Agreement set forth in the Contract Documents, and other designated documents. H. EXECUTION OF CONTRACT If the written Notice of Intent to Award Contract is mailed, telegraphed, or delivered via facsimile to the undersigned within the period of Bid validity noted above, or any time thereafter before this Bid is withdrawn, the undersigned will, within ten (10) days after the date of such notification, execute the City of Renton Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum (“Agreement”) set forth in the Contract Documents. I. TIME FOR COMPLETION A. Notice to Proceed – Anticipated date for Notice to Proceed is April 9, 2026. B. The undersigned hereby agrees to: 1. Mobilization to Site – Anticipated April 9, 2026. DON PERSSON RENTON SENIOR ACTIVITY CENTER EXTERIOR & HVAC IMPROVEMENTS CAG-26-032 Bid Form – FORM A DON PERSSON RENTON SENIOR ACTIVITY CENTER EXTERIOR & HVAC IMPROVEMENTS Page 4 of 7 Bid Form – Form A 2. Substantial Completion – Substantially complete all the Work under the Base Bid no later than August 10, 2026. 3. Final Completion – All the Work shall achieve Final Completion in accordance with the contract documents within 30 calendar days after the date of Substantial Completion, September 10, 2026 J. LIQUIDATED DAMAGES The undersigned agrees to pay the Owner as liquidated damages the sum of $750.00 for each calendar day beyond the date upon which Substantial Completion of the entire Work is required to be complete until Substantial Completion is achieved, in accordance with the Contract Documents. K. BID SECURITY (As per the Bidding Documents) If applicable, Bid Security must be submitted with the Bid Form. L. BID FORM ATTACHMENTS TO BE COMPLETED WITH BID FORM The following document is attached to the Bid Form and must be executed by the Contractor in connection with the Bid From for it to be complete: 1. Attachment 1 – Non-Collusion, Anti-Trust and Minimum Wage Affidavit M. ACKNOWLEDGMENT The undersigned acknowledges that it has read, understands, and agrees to comply with all federal and state non-discrimination laws, regulations, and policies during the performance of the Work. The undersigned Bidder further represents and certifies, under penalty of perjury, that within the three-year period immediately preceding the Bid Date, the Bidder has not been determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries, or through a civil judgment entered by a court of limited or general jurisdiction, to have willfully violated, as defined in RCW 49.48.082, any provision of Chapter 49.46, 49.48, or 49.52 RCW. This project is being funded by both the City of Renton and King County Community Development Block Grant (CDBG) funds. The undersigned acknowledges that it has read, understands, and agrees to comply with all federal and King County Development Block Grant requirements referenced in Section 00 7313 - King County Supplementary Construction Conditions. [SIGNATURE PAGE FOLLOWS] DON PERSSON RENTON SENIOR ACTIVITY CENTER EXTERIOR & HVAC IMPROVEMENTS CAG-26-032 Bid Form – FORM A DON PERSSON RENTON SENIOR ACTIVITY CENTER EXTERIOR & HVAC IMPROVEMENTS Page 5 of 7 Bid Form – Form A Legal Name of Person or Entity Submitting Bid: NOTE: If Bidder is a corporation, write State of Incorporation; if a partnership, give full names and addresses of all parties below. Authorized Signatory: Title: Printed Name: Address: City: State: Zip Code: Date: Telephone: Fax: Washington Contractor's License No.: Federal Tax ID #: E-mail address: Washington State UBI No.: Expiration Date: DON PERSSON RENTON SENIOR ACTIVITY CENTER EXTERIOR & HVAC IMPROVEMENTS CAG-26-032 Bid Form – FORM A DON PERSSON RENTON SENIOR ACTIVITY CENTER EXTERIOR & HVAC IMPROVEMENTS Page 6 of 7 Bid Form – Form A Bid Form – Attachment 1 This form must be submitted with the Bid Form NON-COLLUSION AFFIDAVIT The undersigned, having been duly sworn, deposes and says, that he/she is the identical person who submitted the forgoing Bid, and that such Bid is genuine and not sham or collusive or made in the interest or on behalf of any person not therein named, and further, that the deponent has not directly induced or solicited any other Bidder on the foregoing Work or equipment to put in a sham Bid, or any other person or corporation to refrain from Bidding, and that deponent has not in any manner sought by collusion to secure to himself or to any other person any advantage over the other Bidder or Bidders. AND CERTIFICATION RE: ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER The City of Renton (“City”) and Bidder recognize that in actual economic practice overcharges re- sulting from anti-trust violations are in fact usually borne by the Bidder. Therefore, the Bidder hereby assigns to the City any and all claims for such overcharges as to goods and materials purchased in connection with this Contract, except as to overcharges resulting from anti-trust violations com- mencing after the date of the bid, quotation, or other event establishing the price under this Contract. In addition, the Bidder warrants and represents that such of his suppliers and subcontractors shall assign any and all such claims to the City, subject to the aforementioned exception. AND MINIMUM WAGE AFFIDAVIT FORM The undersigned, having been duly sworn, deposed, says and certify that in connection with the per- formance of the Work of this Project, (a) I will pay each classification of laborer, workman, or me- chanic employed in the performance of such Work; not less than the prevailing rate of wage or not less than the minimum rate of wages as specified in the principal Contract and (b) that I have read the above and foregoing statement and certificate, know the contents thereof and the substance as set forth therein is true to my knowledge and belief. [SIGNATURE PAGE FOLLOWS] DON PERSSON RENTON SENIOR ACTIVITY CENTER EXTERIOR & HVAC IMPROVEMENTS CAG-26-032 Bid Form – FORM A DON PERSSON RENTON SENIOR ACTIVITY CENTER EXTERIOR & HVAC IMPROVEMENTS Page 7 of 7 Bid Form – Form A FOR: NON-COLLUSION AFFIDAVIT, ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER AND MINIMUM WAGE AFFIDAVIT [Legal Name of Person or Entity Submitting Bid] [Signature of Authorized Official*] [Printed Name] [Title] [Date] [City] [State] Subscribed and sworn to before me on this day of , 20 . End of Bid Form Don Persson Renton Senior Activity Center Exterior & HVAC Improvements (CAG-26-032) Construction Documents – Addendum No. 3, February 27, 2026 BCRA Project No. 25040.00.00 01 2200 - 1 BID ALTERNATES SECTION 01 2200 BID ALTERNATES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplementary Conditions and Divisions 00 and 01 Specification Sections, apply to work of this section. 1.02 SECTION INCLUDES A. Administrative and Procedural Requirements for: 1. Bid Alternates. 1.03 BID ALTERNATES A. Definition: A Bid Alternate is an additive or deductive amount proposed by bidders on their bid proposal for specific component(s) of the work or for specific products, materials, equipment, systems or installation methods described in Contract Documents that may be added to or deducted from the Base Bid amount at the discretion of the Owner. B. Coordination: Coordinate related Work and modify or adjust adjacent Work as necessary to ensure that Work affected by each selected Bid Alternate is complete and fully integrated into the Project. C. Notification: Immediately following the award of the contract, prepare and distribute to each party involved, notification of the status of each Bid Alternate. Indicate whether Bid Alternates have been accepted, rejected or deferred for consideration at a later date. Include a complete description of negotiated modifications to Bid Alternates. D. Schedule: A “Schedule of Bid Alternates” is included in this section. Specification sections referenced in the Schedule contain requirements for materials and methods necessary to achieve the Work described under each Bid Alternate. 1. Include as part of each Bid Alternate, miscellaneous devices, accessory objects and similar items incidental to or required for a complete and functional installation whether or not mentioned as part of the Bid Alternate. Don Persson Renton Senior Activity Center Exterior & HVAC Improvements (CAG-26-032) Construction Documents – Addendum No. 3, February 27, 2026 BCRA Project No. 25040.00.00 01 2200 - 2 BID ALTERNATES 1.04 SCHEDULE OF BID ALTERNATES A. Bid Alternate No. 1: Kitchen Area HVAC Upgrades The Base Bid does not include the upgrades to the HVAC system in the Kitchen area shown on the Drawings and specified in the Project Manual. If the Owner chooses to accept this Bid Alternate, provide the upgrades to the HVAC system in the Kitchen area as shown on the Drawings and specified in the Project Manual. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) END OF SECTION Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 7416 - 1 PACKAGED ROOFTOP AIR- CONDITIONING UNITS SECTION 23 7416 PACKAGED ROOFTOP AIR-CONDITIONING UNITS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Packaged Rooftop Unitary Air Conditioners. B. Unit Controls – Systems Integration 1.02 RELATED REQUIREMENTS A. Section 23 0548 - Vibration and Seismic Controls for HVAC Piping and Equipment. B. Section 23 0993 – Sequence of Operations for HVAC Controls. 1.03 REFERENCE STANDARDS A. AHRI 210/240 - Standard for Performance Rating of Unitary Air Conditioning and Air-Source Heat Pump Equipment; Air-Conditioning, Heating, and Refrigeration Institute. B. AHRI 270 - Sound Rating of Outdoor Unitary Equipment; Air-Conditioning, Heating, and Refrigeration Institute. C. NFPA 90A - Standard for the Installation of Air-Conditioning and Ventilation Systems; National Fire Protection Association. D. Reference standards shall be the latest revision as accepted by the local Authority Having Jurisdiction. 1.04 PERFORMANCE REQUIREMENTS A. Electric Heating: See schedule. B. Supply Air: See schedule. C. Return Air: See schedule. D. Electric cooling: See schedule. 1.05 SUBMITTALS A. Refer to Section 01 3300 for submittal procedures. Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 7416 - 2 PACKAGED ROOFTOP AIR- CONDITIONING UNITS B. BABAA Documentation: Provide letter from manufacturer(s) certifying that all products provided under this Section conform to the requirements of the Build America, Buy America Act (BABAA); refer to Section 01 6000 Product Requirements for additional information. C. Product Data: Provide capacity and dimensions of manufactured products and assemblies required for this project. Indicate electrical service with electrical characteristics and connection requirements and duct connections. D. Shop Drawings: Indicate capacity and dimensions of manufactured products and assemblies required for this project. Indicate electrical service with electrical characteristics and connection requirements and duct connections. E. Manufacturer's Instructions: Indicate assembly, support details, connection requirements, and include start-up instructions. F. Operation and Maintenance Data: Include manufacturer's descriptive literature, operating instructions, installation instructions, maintenance and repair data, and parts listing. G. Warranty: Submit manufacturer's warranty and ensure forms have been filled out in Owner's name and registered with manufacturer. 1.06 QUALITY ASSURANCE A. Perform work in accordance with applicable codes. B. Products specified in this section shall be manufactured in the United States of America. Products shall be labeled with the manufacturer's logo and country of origin. This paragraph will be strictly enforced; contractors shall bid on this project accordingly. C. Manufacturer Qualifications: Company specializing in manufacturing the type of products specified in this section, with a minimum of five years of documented experience. D. Products Requiring Electrical Connection: Listed and classified by Underwriters Laboratories Inc. as suitable for the purpose specified and indicated. 1.07 DELIVERY, STORAGE, AND HANDLING A. Protect units from physical damage by storing them off site until roof mounting curbs are in place, ready for immediate installation of units. 1.08 WARRANTY A. Provide a two (2) year manufacturer’s warranty on units, covering parts and labor. Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 7416 - 3 PACKAGED ROOFTOP AIR- CONDITIONING UNITS PART 2 - PRODUCTS 2.01 BUILD AMERICA, BUY AMERICA ACT (BABAA) REQUIREMENTS A. Products shall comply with the requirements of the Build America, Buy America Act (BABAA), refer to Section 01 6000 Product Requirements for additional information. 2.02 MANUFACTURERS A. Trane B. JCI, Johnson Controls International C. Approved Equal 2.03 PACKAGED ROOFTOP UNITS A. Outdoor, rooftop mounted, electrically controlled, electric heating and cooling unit utilizing a fully hermetic, suction gas cooled, direct drive compressor(s) for cooling duty and gas combustion or for heating duty. B. Description: Factory assembled, single-piece heating and cooling rooftop unit. Contained within the unit enclosure shall be all factory wiring, piping, controls, and special features required prior to field start- up. C. Unit shall use environmentally sound, R-454b refrigerant. D. Units shall be installed in accordance with the manufacturer’s instructions. E. Units must be selected and installed in compliance with local, state, and federal codes. F. Unit meets ASHRAE 90.1 minimum efficiency requirements. G. Unit shall be rated in accordance with AHRI Standards 210/240 or 340/360. H. Unit shall be designed to conform to ASHRAE 15. I. Unit shall be CSA tested and certified in accordance with ANSI Z21.47 - 2016/CSA 2.3-2016, and CSA C22.2 No. 60335-2-40. J. Insulation and adhesive shall meet NFPA 90A requirements for flame spread and smoke generation. K. Unit casing shall be capable of withstanding 750- hour salt spray exposure per ASTM B117 (scribed specimen). Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 7416 - 4 PACKAGED ROOFTOP AIR- CONDITIONING UNITS L. Unit shall be subjected to a completely automated run test on the assembly line. The data for each unit will be stored at the factory and must be available upon request. M. Unit shall be designed in accordance with CSA C.22.2 NO.60335-2-40, including tested to withstand rain. N. Unit shall be constructed to prevent intrusion of snow into the control. O. Electrical Characteristics: See schedule. 2.04 OPERATING CHARACTERISTICS: A. Unit shall be capable of starting and running at 115°F (52°C) ambient outdoor temperature, meeting maximum load criteria of AHRI Standard 210/240 or 340/360 at 10% voltage. B. Compressors with standard controls shall be capable of operation down to 45°F (7°C), ambient outdoor temperatures. Intermittent cooling shall be operational down 0° F (-17° C). Low ambient kit is necessary if mechanically cooling at ambient temperatures below 40°F (4°C). C. Unit shall be factory configured for vertical supply & return configurations. 2.05 FABRICATION A. Cabinet: Unit cabinet shall be constructed of galvanized steel with exterior surfaces coated with a non-chalking, powder paint finish, certified at 750-hour salt spray test per ASTM-B117 standards. B. Unit cabinet exterior paint: film thickness, (dry) 3.0 MILS minimum, gloss (per ASTM D523, 60°F / 16°C): 80+/-5, Hardness: H- 2H Pencil hardness. C. Unit cabinet shall have electric utility entry locations marked from the factory with a dimple for accuracy of field drilling. Entry locations shall be available for entry through the side of the unit or from the unit underside. D. Base Rail: 1. Unit shall have base rails on all 4 sides. 2. Holes shall be provided in the base rails for rigging shackles to facilitate maneuvering and overhead rigging. 3. Holes shall be provided in the base rail for moving the unit by fork truck. 4. Base rail shall be a minimum 15-gauge thickness. E. Top Panel: Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 7416 - 5 PACKAGED ROOFTOP AIR- CONDITIONING UNITS 1. Shall be a multi piece top panel. F. Supply Fan: Forward curved centrifugal type, resiliently mounted with V-belt drive, adjustable variable pitch motor pulley, and rubber isolated hinge mounted high efficiency motor or direct drive as indicated. Isolate complete fan assembly. Refer to Section 23 05 48. G. Air Filters: As noted on schedule. H. Roof Mounting: Refer to drawings for mounting conditions and or types. Unit shall be provided with manufacturer’s matching roof curb. I. Electrical Connections: 1. All unit power wiring shall enter unit cabinet through a field drilled hole located by a factory provided dimple. 2. Standard unit shall have a through- the- base electrical location(s) using a raised, embossed portion of the unit base-pan. 2.06 ELECTRIC HEAT A. General: 1. Use nickel chromium elements for heating. 2. Shall have a single stage of capacity on 3 kW through 9 kW heaters and two stages of capacity for all other heater sizes. 3. Shall have a primary limit control with automatic reset to prevent the heating element system from operating at an excessive temperature. 4. Heating section assembly shall slide out of the unit for easy maintenance and service. 5. Shall be wired for single point power supply with branch circuit fusing (where required). 2.07 COILS: A. Evaporator Coils, Aluminum Fin - Copper Tube: 1. Standard evaporator coils shall have aluminum plate fins mechanically bonded to seamless internally grooved copper tubes with all joints brazed. 2. Provide copper tube aluminum fin coil assembly with galvanized drain pan and connection. Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 7416 - 6 PACKAGED ROOFTOP AIR- CONDITIONING UNITS 3. Provide capillary tubes or thermostatic expansion valves for units of 6 tons capacity and less, and thermostatic expansion valves and alternate row circuiting for units 7.5 tons cooling capacity and larger. 4. Shall be leak tested to 150 psig, pressure tested to 250 psig, and burst qualified to CSA C22.2 No. 60335-2-40. 5. Assembled unit shall be pressure tested to 450 psig. B. Condenser Coils, All Aluminum Microchannel: 1. Condenser coils shall have all aluminum microchannel design consisting of aluminum multiport flat tube design and aluminum fin. Coils shall be a furnace brazed design and contain epoxy lined shrink wrap on all aluminum to copper connections. 2. Microchannel condenser coils shall be leak tested to 150 psig, pressure tested by supplier to 600 psig, and burst qualified to CSA C22.2 No. 60335-2-40. 3. Provide direct drive propeller fans, resiliently mounted with fan guard, motor overload protection, wired to operate with compressor. Provide high efficiency fan motors. 4. Provide refrigerant pressure switches to cycle condenser fans. 5. Assembled unit shall be pressure tested to 450 psig. 2.08 REFRIGERANT CIRCUITS A. Refrigerant circuit shall include the following control, safety, and maintenance features: 1. Thermostatic Expansion Valve (TXV) shall help provide optimum performance across the entire operating range. 2. Refrigerant filter drier - Solid core design. 3. Service gauge connections on suction and discharge lines. B. Compressors 1. Unit shall use fully hermetic scroll compressors for each independent refrigeration circuit. 2. Compressor motors shall be cooled by refrigerant gas passing through motor windings. 3. Compressors shall be internally protected from high discharge temperature conditions. Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 7416 - 7 PACKAGED ROOFTOP AIR- CONDITIONING UNITS 4. Compressors shall be protected from an over- temperature and over- amperage conditions by an internal, motor overload device. 5. Compressor shall be factory mounted on rubber grommets. 6. Crankcase heaters shall be installed in the factory as needed on tandem compressor sets. 7. For heat pump units, provide reversing valve, suction line accumulator, discharge muffler, flow control check valve, and solid-state defrost control utilizing thermistors. 2.09 REFRIGERATION DETECTION SYSTEM A. Unit shall have Refrigerant detection system that activates upon detection of refrigerant above minimum threshold. The RDS shall connect to unit controls and automatically start a sequence to dilute refrigerant gas as well as raise an alarm when it senses the presence of refrigerant in the cabinet. The RDS shall contain factory-installed sensors that are located to ensure accurate and timely sensing of refrigerant. 2.10 EVAPORATOR FAN AND MOTOR A. Evaporator fan motor: 1. Shall have permanently lubricated ball-bearings. 2. Shall have inherent automatic- reset thermal overload protection. 3. The job site selected brake horsepower shall be required to not exceed the motor’s nameplate horsepower rating plus the service factor. B. Evaporator Fan: 1. Forward curved centrifugal type, resiliently mounted with V-belt drive, adjustable variable pitch pulley, and rubber isolated hinge mounted. Provide with high efficiency motor or direct drive as indicated. Isolate complete fan assembly. 2. Blower bearings shall have an L10 life of 100,000 hrs 3. Shall use sealed, permanently lubricated ball-bearing type. 4. Shall be constructed from steel with a corrosion resistant finish and dynamically balanced. 2.11 CONDENSER FAN AND MOTORS A. Condenser fan motors: Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 7416 - 8 PACKAGED ROOFTOP AIR- CONDITIONING UNITS 1. Shall be a totally enclosed motor. 2. Shall use permanently lubricated ball-bearings. 3. Shall have inherent thermal overload protection with an automatic reset feature. 4. Shall use a shaft- down design. B. Condenser Fans: 1. Shall be a direct- driven propeller type fan. 2.12 POWERED EXHAUST A. Propeller Powered Exhaust: 1. Power exhaust shall be used in conjunction with an integrated economizer. 2. Horizontal power exhaust shall be mounted in return ductwork. 3. Power exhaust shall be controlled by economizer controller operation. Exhaust fans shall be energized when dampers open past the 0-100% adjustable set point on the economizer control 2.01 MIXED AIR CASING A. Dampers: Provide outside, return, and relief dampers with motorized damper operator to provide full modulating economizer operation. B. Gaskets: Provide tight fitting dampers with edge gaskets and side seals, maximum leakage 5 percent at 2" pressure differential. C. Damper Operator: 24 volt with gear train sealed in oil. D. Controls: See Section 23 0913. 2.02 STANDARD FILTER SECTION A. Shall consist of factory installed, low velocity, disposable 2- in. thick fiberglass filters of commercially available sizes. B. Units can accept 2” or 4” filters and have a field convertible transition. C. Filters shall be accessible through an access panel; hinged panel with toolless access is available as described in the Special Features Options and Accessories section of this specification. Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 7416 - 9 PACKAGED ROOFTOP AIR- CONDITIONING UNITS 2.03 SPECIAL FEATURES OPTIONS & ACCESSORIES A. Low Leak Economizer: 1. Integrated, tie-bar driven parallel modulating blade design type capable of simultaneous economizer and compressor operation. 2. Damper blades shall be galvanized steel with tie-bar metal linkages. Plastic or composite blades on intake or return shall not be acceptable. 3. Damper blades shall be class 1A dampers. 4. Shall include all hardware and controls to provide free cooling with outdoor air when temperature and/or humidity are below set points. 5. Shall be equipped with tie-bar driven dampers for both the outdoor ventilation air and the return air for positive air stream control. 6. Economizers shall comply with, and be certified to, the AMCA 511 standard. 7. Standard leak rate shall be equipped with dampers not to exceed 3 cfm/ft2 leakage at 1 in. wg pressure differential. 8. Economizer controller shall be the Johnson Controls SE Economizer Controller. a. On-board Fault Detection and Diagnostics (FDD) that senses and alerts when the economizer is not operating properly, meets the requirements for California Title 24, IECC 2015, and ASHRAE 90.1. b. Display alarms if the following occur: 1) Economizers are economizing when conditions do not support. 2) Economizers are not economizing when conditions do support. 3) Damper Stuck. 4) Excess Outdoor Air. 5) Failed Sensor. c. Automatic sensor detection. d. Capabilities for use with multiple-speed indoor fan systems. Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 7416 - 10 PACKAGED ROOFTOP AIR- CONDITIONING UNITS e. Utilize digital sensors: Dry bulb and Enthalpy. f. UL, CSA, and ICES-003 recognized and FCC compliant to CFR47. 9. Shall be capable of introducing up to 100% outdoor air. 10. Shall be equipped with powered exhaust capable of relieving up to 100% return air and contain seals that meet ASHRAE 90.1 requirements. 11. Shall be designed to close damper(s) during loss- of- power situations with spring return built into motor. 12. Dry bulb outdoor air temperature sensor shall be provided as standard. Single or dual enthalpy sensing is available as a factory or field installed sensing option. Outdoor air sensor set point shall be adjustable and shall range from 40° to 80°F / 4° to 27°C. Additional sensor options shall be available as accessories. 13. The economizer controller shall also provide control of an accessory power exhaust unit function. Factory set at 100%, with a range of 0% to 100%. 14. The economizer shall maintain minimum airflow into the building during occupied period and provide design ventilation rate for full occupancy. 15. Dampers shall be completely closed when the unit is in the unoccupied mode. 16. Economizer controller shall accept a 2- 10 Vdc CO2 sensor input for IAQ/DCV control. In this mode, dampers shall modulate the outdoor air damper to provide ventilation based on the sensor input. 17. Economizer controller shall provide indications when in free cooling mode, in the DCV mode, or the exhaust fan contact is closed. B. Motorized Damper: 1. Damper shall be a Two- Position Damper. Damper travel shall be from the full closed position to the full open position, depending on model selected. 2. Assembly shall include adjustable block off to allow air entry of 0% to 25% or 0% to 100% (dependent on selected option) of maximum allowed outside air. 3. Damper shall include multiple blades, tie-bar driven dampers and actuator motor. Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 7416 - 11 PACKAGED ROOFTOP AIR- CONDITIONING UNITS 4. Damper shall close upon indoor (evaporator) fan shutoff and/or loss of power. 5. The damper actuator shall plug into the rooftop unit’s wiring harness plug. No hard wiring shall be required. C. IntelliSpeed staged air volume system (6.5 – 12.5 Ton models): 1. Evaporator fan motor: a. Shall have permanently lubricated bearings. b. Shall have a maximum continuous bhp rating for continuous duty operation; no safety factors above that rating. c. Shall be Variable Frequency duty and 2-speed control. 2. Variable Frequency Drive (VFD): a. Shall be installed inside the unit cabinet, mounted, wired and tested. b. Shall contain Electromagnetic Interference (EMI) frequency protection. c. Insulated Gate Bi Polar Transistors (IGBT) used to produce the output pulse width modulated (PVM) waveform. d. Built in LED display and controls. Does not require additional kit or options. e. RS485 capability standard. f. Electronic thermal overload protection. g. 5% swinging chokes for harmonic reduction and improved power factor. h. All printed circuit boards shall be conformal coated. 2.01 OUTSIDE AIR HOOD A. The outside air intake hood shall include an aluminum water entrainment filter mounted directly to inside face of intake. 2.02 HINGED AND TOOL-LESS ACCESS PANELS: A. Cabinet panels shall be hinged. B. Shall provide easy access with tool-less latching mechanism. Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 7416 - 12 PACKAGED ROOFTOP AIR- CONDITIONING UNITS C. Shall be on major panels of: filter, control box, fan motor, and gas or electric heat controls. 2.03 POWERED CONVENIENCE OUTLETS: A. Outlet shall be powered from main line power to the rooftop unit. B. Outlet shall be factory installed and internally mounted with easily accessible 115- v female receptacle. C. Outlet shall include 15-amp GFI receptacles with independent fuse protection. D. Voltage required to operate convenience outlet shall be provided by a factory installed step-down transformer. E. Outlet shall be accessible from outside the unit. 2.04 SINGLE ENTHALPY SENSOR: A. The single enthalpy sensor option or kit shall provide a relative humidity sensor to be mounted in the outdoor air stream to provide single enthalpy economizer control. B. The sensor allows the unit to determine if outside air is suitable for free cooling. 2.05 PHASE MONITOR A. Shall provide protection against phase reversal, phase loss, and phase unbalance. B. Switch shall automatically shut off unit control circuit if any of the above conditions is detected. C. Shall have visual LED indication of operational status. 2.06 SMART EQUIPMENT CONTROLS A. Shall be ASHRAE 62-2001 compliant. B. Shall accept 20-30 VAC input power, 50/60Hz. 24 VAC nominal. C. Shall include an option of an Economizer microprocessor controller which communicates directly with the Unit Control Board and has 8 Analog outputs, 2 Analog inputs, 2 Binary outputs, 3 Binary outputs. Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 7416 - 13 PACKAGED ROOFTOP AIR- CONDITIONING UNITS D. Controller shall accept the following inputs: space temperature, return air temperature sensor, set point adjustment, outdoor air temperature, indoor air quality, outdoor air quality, indoor relative humidity, compressor lock out, fire/smoke shutdown, single and dual enthalpy, fan status, remote time clock, Sensor Actuator (SA) Bus communicated temperature/humidity/CO2 values from Network sensors, Field Controller (FC) Bus Network Overrides for space temperature, outdoor air temperature, space humidity, outdoor air quality, Indoor air quality, System purge. E. Shall accept a CO2 sensor or multiple CO2 sensors networked together in the conditioned space and be Demand Control Ventilation (DCV) ready. F. Shall provide compressor short-cycle protection with minimum compressor runtime set at 3 minutes standard and adjustable from 2 to 7 minutes. G. Built in lead-lag compressor sequencing to support balanced utilization of refrigerant circuits. H. Shall provide the following outputs: economizer, fan, cooling stage 1, cooling stage 2, heat stage 1, heat stage 2, heat stage 3/ exhaust/ reversing valve/ dehumidify/ occupied. I. Unit shall provide surge protection for the controller through a circuit breaker. J. Shall have open communication protocols with all required points exposed. Protocols supported include: BACnet®, MS/TP, Modbus®, and N2 communication. K. Shall have an LCD display on the Unit Control Board to display fault messages as well as navigate the menu structure to review and change set points. L. Shall utilize a USB connection to allow for uploading and downloading of data. M. Shall include an RJ-12 port to be used with a Wi-Fi signal transmitting device and allow unit(s) access via any non-proprietary smart device. N. Shall have the capability to control the Verasys control system. O. Shall not require any proprietary software or contractor tool to start-up, commission and troubleshoot unit operation. P. Software upgrades will be accomplished by local download via USB port on main Unit Control Board. Q. Unit shall be UL tested and certified in accordance with CSA/ANSI Z21.47:21/CSA 2.3:21, CAN/CSA-C22.2 No 60335-2-40:22 and 60335-2-40-1- :16, and UL 60335-2-40 (4th edition). Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 7416 - 14 PACKAGED ROOFTOP AIR- CONDITIONING UNITS 2.01 DELIVERY, STORAGE, AND HANDLING: A. Unit shall be stored and handled per manufacturer’s recommendations. B. Overhead crane can be used to place the units on a roof using rigging holes built into the unit base rails without any additions to the unit. C. Unit shall only be stored or positioned in the upright position. PART 3 - EXECUTION 3.01 EXAMINATION A. Verify that the roof is ready to receive work and opening dimensions are as indicated on shop drawings. B. Verify that proper power supply is available. 3.02 INSTALLATION A. Install in accordance with manufacturer's instructions. B. Install in accordance with NFPA 90A. C. Condensate Drainage: provide PVC P-traps on unit condensate drains with trap depth so as to prevent unit sucking in air through condensate drain. 3.03 SYSTEM STARTUP A. Provide the services of manufacturer's field representative for starting and testing unit. 1. Prepare a manufacturer’s startup report and turn over to the Owner and Commissioning Agent. END OF SECTION Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) 100% Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 8126 - 1 SPLIT-SYSTEM AIR- CONDITIONERS SECTION 23 8126 SPLIT-SYSTEM AIR CONDITIONERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Outdoor units. B. Coils. C. Controls. 1.02 RELATED REQUIREMENTS A. Section 01 9100 – Commissioning B. Section 23 0548 - Vibration and Seismic Controls for Piping and Equipment C. Section 23 0513 - Common Motor Requirements for HVAC Equipment. D. Section 23 0548 - Vibration and Seismic Controls for HVAC. E. Section 23 2300 - Refrigerant Piping. F. Section 23 3100 - HVAC Ducts and Casings 1.03 REFERENCE STANDARDS A. AHRI 210/240 - Performance Rating of Unitary Air-Conditioning and Air-Source Heat Pump Equipment; 2023. B. ASHRAE Std 15 - Safety Standard for Refrigeration Systems; 2022, with Addendum (2024). C. ASHRAE Std 20 - Methods of Laboratory Testing Remote Mechanical-Draft Air- Cooled Refrigerant Condensers; 2019. D. ASHRAE Std 90.1 I-P - Energy Standard for Buildings Except Low-Rise Residential Buildings; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements. E. NEMA 250 - Enclosures for Electrical Equipment (1000 Volts Maximum); 2020. F. NEMA MG 1 - Motors and Generators; 2021. G. UL 207 - Standard for Refrigerant-Containing Components and Accessories, Nonelectrical; Current Edition, Including All Revisions. Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) 100% Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 8126 - 2 SPLIT-SYSTEM AIR- CONDITIONERS 1.04 SUBMITTALS A. See Section 013000 - Administrative Requirements for submittal procedures. B. BABAA Documentation: Provide letter from manufacturer(s) certifying that all products provided under this Section conform to the requirements of the Build America, Buy America Act (BABAA); refer to Section 01 6000 Product Requirements for additional information C. Product Data: Provide rated capacities, weights, accessories, electrical requirements, and wiring diagrams. D. Shop Drawings: Indicate components, assembly, dimensions, weights and loading, required clearances, and location and size of field connections. Include schematic layouts showing condenser, refrigeration compressors, cooling coils, refrigerant piping and accessories required for complete system. E. Manufacturer's Instructions: Submit manufacturer's complete installation instructions. F. Sustainable Design Documentation: Submit manufacturer's product data on refrigerant used, showing compliance with specified requirements. G. Operation and Maintenance Data: Include start-up instructions, maintenance instructions, parts lists, controls, and accessories. H. Warranty Documentation: Submit manufacturer warranty and ensure that forms have been completed in Owner's name and registered with manufacturer. 1.05 QUALITY ASSURANCE A. Manufacturer Qualifications: 1. Nationally recognized manufacturer of HVAC systems and products having shipped HVAC systems with similar requirements to U.S. market for a continuous period of five years within time of bid. 2. Having complete published online catalog literature, installation, and operation and maintenance manuals for all products intended for use. Resources must be publicly available without login or sign-in as registered account. B. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by HVAC system manufacturer. 1. Each employee shall be certified to have successfully completed training for proper installation of systems, including, but not limited to, equipment, piping, controls, and accessories indicated and furnished for installation. Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) 100% Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 8126 - 3 SPLIT-SYSTEM AIR- CONDITIONERS C. All wiring shall be in accordance with the National Electrical Code (N.E.C.). D. The units shall be manufactured in a facility registered to ISO 9001 and ISO 14001 which is a set of standards applying to environmental protection set by the International Standard Organization (ISO). E. A factory charge of R-454B for the condensing unit only shall be provided in the condensing unit. Additional refrigerant is required based on diameters and lengths of system liquid refrigerant lines and indoor equipment model and quantity. 1.06 DELIVERY, STORAGE, AND HANDLING A. Deliver and store products in a clean and dry place. Protect products from weather, dirt, dust, water, construction debris, and physical damage. B. Comply with manufacturer's installation instruction for rigging, unloading and transporting units. C. Protect units on site from physical damage. Protect coils. 1.07 WARRANTY A. Manufacturer's Warranty: Manufacturer agrees to repair or replace equipment and components that fail(s) in materials or workmanship within specified warranty period. 1. Failures include, but are not limited to, the following: a. Structural failures. b. Faulty operation. c. Deterioration of metals, metal finishes, and other materials beyond normal weathering and use. 2. Warranty Period: a. For Compressor, 10 years from date of Substantial Completion. b. For Parts, Five years from date of Substantial Completion. B. Installer’s Labor Warranty: Installer agrees to repair or replace equipment and components that fail(s) in materials or workmanship within specified warranty period. 1. Warranty Period: One year from date of substantial completion. Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) 100% Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 8126 - 4 SPLIT-SYSTEM AIR- CONDITIONERS PART 2 - PRODUCTS 2.01 BUILD AMERICA, BUY AMERICA ACT (BABAA) REQUIREMENTS A. Products shall comply with the requirements of the Build America, Buy America Act (BABAA), refer to Section 01 6000 Product Requirements for additional information. 2.02 SINGLE-ZONE, HEAT PUMP HVAC SYSTEM: A. Manufacturers: Basis of design product series is SMART MULTI. Subject to compliance with requirements, provide products by one of the following brands only: 1. Trane, Inc. 2. Samsung 3. Daikin Applied 2.03 SYSTEM DESCRIPTION A. Single-zone HVAC system(s) with variable capacity in response to varying cooling loads. System shall consist of outdoor unit, indoor unit, piping, controls, and electrical power to make complete operating system(s) complying with requirements indicated. B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. C. AHRI Compliance: System and equipment performance certified according to AHRI 210/240-2024 and AHRI 1380. D. UL Compliance: Comply with UL 60335-2-40. 2.04 OUTDOOR, AIR-SOURCE HEAT PUMP UNITS A. Description: Factory-assembled and tested complete unit module designed for use in systems with all cooling demands. B. Cabinet: 1. Galvanized steel and coated with a corrosion-resistant finish. Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) 100% Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 8126 - 5 SPLIT-SYSTEM AIR- CONDITIONERS a. Coating with documented salt spray test performance of 2000 hours according to ASTM B117 surface scratch test (SST) procedure. 2. Internal Access: Removable panels or hinged doors of adequate size for field access to internal components for inspection, cleaning, service, and replacement. C. Compressor and Motor Assembly: 1. Positive-displacement, direct-drive and hermetically sealed rotary or scroll compressor with inverter drive. Non-inverter compressors—where LRA applies—are not allowed. 2. Protection: Integral protection against the following: a. High and low refrigerant pressure. b. High refrigerant and oil temperature. c. Thermal and overload. d. Voltage fluctuations. e. Short cycling 3. Vibration Control: Integral isolation to dampen vibration transmission. 4. Crankcase heater. 5. Accumulator. 6. Fusible plug. D. Heat-Exchanger Assembly: Documented salt spray test performance of 2000 hours according to ASTM B117 surface test (SST) procedure. 1. Plate Fin Coils: a. Casing: Aluminum, galvanized, or stainless steel. b. Fins: Aluminum or copper, mechanically bonded to tubes, with arrangement required by performance. c. Tubes: Copper, of diameter and thickness required by performance. E. Heat-Exchanger Fan and Motor Assembly: 1. Fan(s): Propeller type: Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) 100% Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 8126 - 6 SPLIT-SYSTEM AIR- CONDITIONERS a. Horizontal discharge. b. Direct-drive arrangement. c. Fabricated from non-ferrous components. d. Statically and dynamically balanced. 2. Fan Guards: Removable safety guards complying with OSHA regulations. If using metal materials, coat with corrosion-resistant coating to match performance indicated for heat exchanger. 3. Motor(s): Brushless DC or electronically commutated with permanently lubricated bearings and rated for outdoor duty. 4. Motor Protection: Integral protection against thermal, overload, and voltage fluctuations. F. DX Capacity Control: Electronic modulating type expansion valve with linear or proportional characteristics. G. Standard Operating Range: 1. COOL Mode: 23°F to 115°F DB. a. Unit shall deliver 100 percent cooling capacity at minimum range. 2. HEAT Mode: a. Standard heat pump as indicated on Drawings: -4°F to 59°F WB. H. Unit Controls: 1. Factory-Installed Sensors: a. Refrigerant suction temperature. b. Refrigerant discharge temperature. c. Compressor surface temperature. d. Refrigerant high pressure. e. Outdoor air temperature. f. Outdoor coil heat sink temperature. g. Outdoor coil two-phase pipe temperature. 2. Features and Functions: Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) 100% Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 8126 - 7 SPLIT-SYSTEM AIR- CONDITIONERS a. Self-diagnostics, 3-minute time delay, auto-restart after power interruption. 3. Backup Rotation Function: Where one Deluxe controller is connected to two indoor units per Drawings, outdoor units shall operate alternately to maintain equal runtimes and equivalent wear. During fault code or system lockout condition in one unit the other shall continue to operate. I. Refrigerant: 1. R-454b. 2. Pre-charged refrigerant supplied within unit for up to 100 feet line length. J. Refrigerant Piping Allowances: System shall operate up to maximum limits without need for line size changes, traps or additional oil. 1. Standard heat pump as indicated on Drawings: a. Outdoor unit sizes 18 and smaller: Up to 100 feet total length, up to 100 feet height difference, up to 15 long-radius elbows. b. Outdoor unit sizes 24 and larger: Up to 165 feet total length, up to 100 feet height difference, up to 15 long-radius elbows. K. Unit Electrical: 1. Field Connection: Single point connection to power each outdoor unit and integral controls. 2. Disconnecting Means: Field-installed circuit breaker or switch, complying with NFPA 70. 2.05 INDOOR, MULTI-POSITION CASED COILS FOR DUCTING A. Description: Factory-assembled cased coil with components, piping, wiring, and controls required for mating to ductwork, piping, power, and controls field connections. Coil may be configured for upflow, downflow, horizontal-left, or horizontal-right mounting positions as shown on Drawings: B. Cabinet: 1. Material: Painted steel. 2. Insulation: Closed-cell, fiberglass-free internal insulation to provide thermal resistance and prevent condensation. 3. Duct Connections: Extended collar or flange, or designated exterior cabinet surface, designed for attaching field-installed ductwork. Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) 100% Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 8126 - 8 SPLIT-SYSTEM AIR- CONDITIONERS C. Coil Assembly: 1. Coil Casing: Aluminum, galvanized, or stainless steel. 2. Coil Fins: Aluminum, mechanically bonded to tubes, with arrangement required by performance. 3. Coil Tubes: Copper, of diameter and thickness required by performance. 4. Unit Internal Tubing: Copper tubing with brazed joints. 5. Unit Internal Tubing Insulation: Closed-cell, of thickness to prevent condensation. 6. Factory Charge: Dehydrated air or nitrogen. 7. Testing: Factory pressure tested and verified to be without leaks. D. Drain Assembly: 1. Pan: Non-ferrous material, with bottom sloped to low point drain connection. 2. Condensate Removal: Gravity. a. If a floor drain is not available at unit, provide unit with field- installed condensate pump accessory. 3. Float switch: Accessory float switch shall be provided with coil and field- installed for all mounting configurations. 4. Field Piping Connection: Non-ferrous material. E. Testing Requirements: Evaporator and Condensing coils are tested to 600 psig. F. Unit Controls: 1. Factory-Installed Sensors: a. Unit inlet air temperature. b. Coil entering refrigerant temperature. c. Refrigerant detection 2. Dual-Fuel Balance Points: Unit shall support two outdoor air temperature set points to determine whether heat pump or gas furnace is primary heat source. Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) 100% Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 8126 - 9 SPLIT-SYSTEM AIR- CONDITIONERS a. Economic balance point: Defined by input at local controller, determined by cost of fossil fuel and electricity, efficiency of furnace and heat pump. b. Capacity balance point: Defined automatically by unit control board, determined if heat pump operation above economic balance point is unable to maintain space set temperature 3. Interlocked control sequence: Dry (volt-free contacts) contacts shall be provided to achieve interlock function; relay adapter kits may be required. Required interlock sequence(s) include: a. Backup heat control; one or two-stage. b. AHU blower fan; single speed. c. On/Off control. G. Refrigerant Leak Detection: 1. Integral refrigerant sensor: Factory-installed. 2. Sequence upon leak detection: a. Compressor stops. b. Indoor unit fan operates regardless of setting. c. Alarm indicator(s) may include sound from indoor unit or controller, flashing LED, error code or message on wall controller or central controller. H. Unit Electrical: 1. Field Connection: Single point connection from outdoor unit provides power for unit and signal for integral controls. a. 3-wire plus ground 14 AWG copper wire for wire length unit up to 148 feet. Consult manufacturer installation manuals for wire sizes for longer lengths. 2. Disconnecting Means: Field-installed 3-pole switch, complying with NFPA 70. 2.06 CONTROLS A. Control interface shall be provided by the manufacturer. Interface shall allow for a third-party building management system (BMS) to control a Mitsubishi Electric City Multi, M-series or P-series indoor unit. Provide as follows: Renton Senior Activity Center HVAC, Roof & Ext. Siding Replacement (CAG-25-247) 100% Construction Documents – January 16, 2026 BCRA Project No. 25040.00.00 23 8126 - 10 SPLIT-SYSTEM AIR- CONDITIONERS 1. (1) MelcoBEMS Mini (A1M) per indoor unit. 2. Indoor Unit Connection: CN105 – IT Terminal 3. 12VDC from indoor unit CN105 Connection 4. Communication protocols supported: a. BACnet MSTP (RS-385) with addressing 1-127 b. MODBUS RTU (RS-485) with addressing 1-247 5. LED light notification status of valid communication between: a. Procon and Indoor unit. b. Procon and BACnet/MODBUS networks. PART 3 - EXECUTION 3.01 INSTALLATION A. Install in accordance with manufacturer's instructions. B. Provide for connection to electrical service. See Section 260583. C. Install units on vibration isolation. See Section 230548. D. Provide connection to refrigeration piping system. See Section 232300. Comply with ASHRAE Std 15. E. Provide cooling season start-up, winter season shut-down service, for first year of operation. F. Shut-down system if initial start-up and testing takes place in winter and machines are to remain inoperative. Repeat start-up and testing operation at beginning of first cooling season. END OF SECTION SHEET NOTE REVISION EXTERIOR ELEVATION DETAIL CALLOUT - SECTION CUT LINE DOOR NUMBER CALLOUT WALL TYPE CALLOUT WINDOW TYPE CALLOUT CENTER LINE DETAIL CALLOUT - PLAN RELITE TYPE CALLOUT STOREFRONT TYPE CALLOUT INTERIOR ELEVATION 1 A-201 1 A-591 SIM 1 A-591 SIM ELEVATION MARKER DATUM POINT NAME ELEVATION 1 BREAK LINE, ROUND A-211 2 3 4 1 10 1 ROOF TYPE CALLOUT ROOM NAME/NUMBER CEILING HEIGHT SLOPE INDICATOR GRAPHIC SCALE SLOPE 6:12 12 6 SCALE: 0 4 8 16 1/8" = 1'-0" 11'-0" ROOM NAME 101 FLOOR/CEILING TYPE CALLOUT WALL SECTION BUILDING SECTION 1 A-311 A A-301 A A-301 6W1 R1 FC1 CL CL NORTH ARROW TRUE NORTH R1 SF1 1 SHEET NOTE - DEMOLITION1 W1 TRUE NORTH PROJECT LOCATION SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 22 x 3 4 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T 2/ 2 6 / 2 0 2 6 5 : 1 4 : 2 5 P M G-101 INDEX SHEET, PROJECT INFORMATION, PROJECT TEAM 100% CD SET 01.16.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , E X T E R I O R S I D I N G & W I N D O W R E P L A C E M E N T CITY OF RENTONOWNER 1055 SOUTH GRADY WAY RENTON, WA 98057 CONTACT: ALISHA SMOTHERS EMAIL: ASMOTHERS@RENTONWA.GOV PHONE: 206.536.0566 BCRA, INCARCHITECT 2106 PACIFIC AVENUE, SUITE 300 TACOMA, WA 98402 CONTACT: KIM DOYLE EMAIL: KDOYLE@BCRADESIGN.COM PHONE: 253.627.4367 DESIGN WEST ENGINEERINGMECHANICAL ENGINEER 123 2ND AVE S, SUITE 220 EDMONDS, WA 98020 CONTACT: REID HERRON EMAIL: RHERRON@DESIGNWESTENG.COM PHONE: 425.458.9700 NEXUSBUILDING ENVELOPE 2552 JEFFERSON AVE TACOMA, WA 98402 CONTACT: DANI ITTNER EMAIL: DITTNER@NEXUSBEC.COM PHONE: 253.625.7090 GENERAL ARCHITECTURAL DEMOLITION MECHANICAL ELECTRICAL G-101 INDEX SHEET, PROJECT INFORMATION, PROJECT TEAM A-111 SITE PLAN A-121 FIRST FLOOR PLAN A-122 SECOND FLOOR PLAN A-151 FIRST FLOOR REFLECTED CEILING PLAN A-152 SECOND FLOOR REFLECTED CEILING PLAN A-161 ROOF PLAN A-201 EXTERIOR ELEVATIONS A-202 EXTERIOR ELEVATIONS A-501 EXTERIOR DETAILS A-502 EXTERIOR DETAILS A-503 EXTERIOR DETAILS A-504 EXTERIOR DETAILS A-541 TYPICAL SEQUENCING DETAILS A-542 TYPICAL SEQUENCING DETAILS A-611 WINDOW TYPES A-701 EXTERIOR IMAGES A-702 EXTERIOR IMAGES M-001 MECHANICAL LEGEND NOTES & SCHEDULES M-002 MECHANICAL SCHEDULES M-003 MECHANICAL SCHEDULES M-004 MECHANICAL SCHEDULES M-005 MECHANICAL SCHEDULES M-100 MECHANICAL REFERENCE PLAN - UNDERSLAB M-201 MECHANICAL FIRST FLOOR REMODEL PLAN M-202 MECHANICAL SECOND FLOOR REMODEL PLAN M-203 MECHANICAL ROOF REMODEL PLAN M-301 MECHANICAL REFRIGERANT PLAN - FIRST FLOOR M-302 MECHANICAL REFRIGERANT PLAN - SECOND FLOOR M-303 MECHANICAL ELEVATIONS DEMOLITION PLANS M-304 MECHANICAL ELEVATIONS REMODEL PLANS M-401 MECHANICAL DETAILS M-402 MECHANICAL DETAILS M-403 MECHANICAL CONTROLS DETAILS M-404 MECHANICAL CONTROLS DETAILS M-505 MECHANICAL CONTROLS DETAILS MD-101 MECHANICAL DEMOLITION PLAN - FIRST FLOOR MD-102 MECHANICAL DEMOLITION PLAN - SECOND FLOOR MD-103 MECHANICAL DEMOLITION PLAN - ROOF E-001 ELECTRICAL LEGENDS AND NOTES E-002 SINGLE LINE DIAGRAM AND PANEL SCHEDULES' E-003 ELECTRICAL PANEL SCHEDULES E-101 ELECTRICAL FIRST FLOOR REMODEL PLAN E-102 ELECTRICAL SECOND FLOOR REMODEL PLAN E-103 ELECTRICAL ROOF REMODEL PLAN E-201 ELECTRICAL DETAILS ED-101 ELECTRICAL FIRST FLOOR DEMOLITION PLAN ED-102 ELECTRICAL SECOND FLOOR DEMOLITION PLAN ED-103 ELECTRICAL ROOF DEMOLITION PLAN SHEET NUMBER DRAWING DESCRIPTION ARCHITECTURAL AD121 FIRST FLOOR DEMOLITION PLAN AD122 SECOND FLOOR DEMOLITION PLAN AD161 DEMOLITION ROOF PLAN VICINITY MAP SHEET INDEX PROJECT TEAM ABBREVIATIONS ARCHITECTURAL SYMBOLS PROJECT INFORMATION AFF ABOVE FINISHED FLOOR ALUM ALUMINUM CJ CONTROL JOINT DS DOWNSPOUT EQ EQUAL EXIST EXISTING FC FIBER CEMENT FV FIELD VERIFY GA GAUGE GWB GYPSUM BOARD MAX MAXIMUM MIN MINIMUM MTL METAL NIC NOT IN CONTRACT OC ON CENTER OPP OPPOSITE SITE ADDRESS 211 BURNETT AVE N, RENTON, WA 98057 PARCEL NUMBER 1823059158 ZONING R-10 LAND USE DESIGNATION RESIDENTIAL PROJECT SITE AREA 1.37 ACRES / 59,800 SQUARE FEET PROJECT SITE ACCESS NORTH: EXISTING PAVED ENTRY INTO PARKING LOT FROM BURNETT AVE N OR LOGAN AVE N UTILITY PURVEYORS SEWER — CITY OF RENTON WATER — CITY OF RENTON ELECTRIC — PUGET SOUND ENERGY 211 BURNETT AVE N RENTON, WA 98057 100% CD SET - 01.16.2026 CODE SUMMARY DESIGN WEST ENGINEERINGELECTRICAL ENGINEER 123 2ND AVE S, SUITE 220 EDMONDS, WA 98020 CONTACT: LEO MAYA EMAIL: LMAYA@DESIGNWESTENG.COM PHONE: 425.458.9700 1 Addendum No. 3 2/27/2026 GENERAL NOTES 1. 2. 3. 4. 5. 6. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING DIMENSIONS AND EXISTING CONDITIONS. PRIOR TO SUBMITTING BID. FIELD VERIFY EXISTING CONDITIONS AND NOTIFY THE OWNER OF ANY DISCREPANCIES FROM CONDITIONS SHOWN ON THE DRAWINGS PRIOR TO START OF WORK. NOTES APPEAR ON VARIOUS DRAWINGS FOR DIFFERENT SYSTEMS AND MATERIALS. REVIEW ALL SHEETS AND APPLY NOTES TO RELATED BUILDING COMPONENTS. REFER TO COMPLETE SET OF ISSUED CONTRACT DOCUMENTS FOR OTHER APPLICABLE NOTES, ABBREVIATIONS, AND SYMBOLS. WHERE MATERIALS ARE APPLIED TO, OR ARE IN DIRECT CONTACT WITH WORK INSTALLED BY ANOTHER SUBCONTRACTOR, COMMENCEMENT OF WORK IMPLIES ACCEPTANCE OF THE SUBSTRATE AS SUITABLE FOR APPLICATION INTENDED. ISOLATE DISSIMILAR METALS TO PREVENT GALVANIC CORROSION. OCCUPANCY TYPE EXISTING B - OCCUPANCY CONSTRUCTION TYPE EXISTING V-B SPRINKLERED NUMBER OF STORIES ABOVE GRADE:EXISTING TWO HEIGHT OF BUILDING EXISTING 29'-7" BUILDING AREA EXISTING FIRST FLOOR 13,060 SF EXISTING SECOND FLOOR 6,668 SF TOTAL 19,728 SF PPT PRESSURE PRESERVATIVE TREATED PREFIN PREFINISHED RO ROUGH OPENING SHT SHEET SIM SIMILAR TYP TYPICAL UNO UNLESS NOTED OTHERWISE ROOFING REPLACEMENT: REMOVE AND REPLACE ALL ROOFING TO INCLUDE SHINGLES AND SINGLE-PLY ROOF ASSEMBLIES. DOWNSPOUTS TO BE REMOVED AND REUSED. FLASHING TO BE REUSED IF POSSIBLE OR REPLACED WHERE DIRECTED IN DRAWINGS. GUTTERS TO BE REPLACED. SIDING REPLACEMENT: REMOVE AND REPLACE ALL SIDING WITH FIBER CEMENT BOARD TO MATCH ORIGINAL APPEARANCE. TRIM TO BE REPLACED THROUGHOUT WITH FIBER CEMENT BOARD TRIM, UNLESS NOTED OTHERWISE IN DRAWINGS. WINDOW REPLACEMENT: REMOVE AND REPLACE ALL WINDOW UNITS. SOLARIUM GLAZING REPAIR: REPAIR FAILING ASSEMBLY WITH IN-KIND REPLACEMENT GLAZING UNITS AT THE EXISTING WOOD-FRAMED SOLARIUM. MECHANICAL & ELECTRICAL UPDATES: MECHANICAL SYSTEMS TO BE REPLACED ON ROOF AND UPDATED INSIDE TO PROVIDE HEATING AND COOLING TO ALL OCCUPIED SPACES. ELECTRICAL WORK AS NEEDED TO SUPPORT THE REPLACED MECHANICAL SYSTEMS. PROJECT DESCRIPTION SHEET NUMBER DRAWING DESCRIPTION SHEET NUMBER DRAWING DESCRIPTION S-001 GENERAL NOTES S-002 GENERAL NOTES S-201 FOUNDATION PLAN S-202 LEVEL 2 FRAMING PLAN S-203 ROOF FRAMING PLAN S-301 FRAMING DETAILS STRUCTURAL PCS STRUCTURAL SOLUTIONSSTRUCTURAL ENGINEER 1250 PACIFIC AVE #701 TACOMA, WA 98402 CONTACT: LUKE HEATH EMAIL: LHEATH@PCS-STRUCTURAL.COM PHONE: 253.383.2797 DON PERSSON RENTON SENIOR ACTIVITY CENTER HVAC, ROOF, EXTERIOR SIDING & WINDOW REPLACEMENT BID ALTERNATE NO. 1: KITCHEN AREA HVAC UPGRADES THE BASE BID DOES NOT INCLUDE THE UPGRADES TO THE HVAC SYSTEM IN THE KITCHEN AREA SHOWN ON THE DRAWINGS AND SPECIFIED IN THE PROJECT MANUAL. IF THE OWNER CHOOSES TO ACCEPT THIS BID ALTERNATE, PROVIDE THE UPGRADES TO THE HVAC SYSTEM IN THE KITCHEN AREA AS SHOWN ON THE DRAWINGS AND SPECIFIED IN THE PROJECT MANUAL. 1 12106 REGISTERED ARCHITECT STATE OF WASHINGTON SARA ANN RICKARDS NOTE: NOT ALL LEGEND ITEMS MAY BE PRESENT ON THIS SHEET EXISTING WALL TO REMAIN EXISTING DOOR AND FRAME TO REMAIN EXISTING RELITE / WINDOW TO REMAIN REMOVE EXISTING WINDOW ASSEMBLY # REFER TO FLAG NOTES FOR EXTENT OF EXTERIOR DEMOLITION STRUCTURE ABOVE / EDGE OF ROOF ABOVE 1. 2. 3. 4. A. B. C. 5. 6. 7. 8. DIMENSIONS OF EXISTING GRIDLINES ARE BASED ON EXISTING DRAWINGS. FIELD VERIFY. FIELD VERIFY EXISTING CONDITIONS PRIOR TO THE START OF DEMOLITION OPERATIONS. BRING ANY DISCREPANCIES WHICH MAY SIGNIFICANTLY AFFECT DEMOLITION OR NEW CONSTRUCTION TO THE ATTENTION OF THE ARCHITECT FOR REVIEW. DO NOT ALTER THE STRUCTURAL INTEGRITY OF THE EXISTING BUILDING OR ITS ASSEMBLIES UNLESS SPECIFICALLY NOTED OTHERWISE. FOR THE PURPOSES OF THESE DEMOLITION DRAWINGS, DEFINITIONS ARE AS FOLLOWS: DEMOLISH - COMPLETE DEMOLITION OF AN ENTIRE STRUCTURE. NO ITEMS TO BE REMOVED OR SALVAGED. REMOVE - SELECTIVE REMOVAL OF A DESIGNATED BUILDING ELEMENT IN A MANNER THAT ENSURES THAT SURROUNDING EXISTING BUILDING ELEMENTS (TO REMAIN) ARE PROTECTED FROM DAMAGE. ALL REMOVED ITEMS ARE TO BE DISPOSED OF IN AN APPROPRIATE MANNER OFF-SITE. SALVAGE - REMOVAL OF A DESIGNATED BUILDING ELEMENT IN A MANNER THAT PROTECTS THE ITEM BEING REMOVED FOR RE-USE IN THE PROJECT, OR TURNED OVER TO THE OWNER. ITEM IS TO BE STORED BY THE GENERAL CONTRACTOR (FOR RE-USE) OR COORDINATED WITH THE OWNER FOR REMOVAL FROM THE SITE. REFER ALSO TO STRUCTURAL, MECHANICAL AND ELECTRICAL FOR ADDITIONAL DEMOLITION SCOPE REQUIREMENTS. AREAS OF REMOVAL OF EXISTING GWB ARE TO BE COORDINATED WITH STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS. PROTECT ALL EXISTING STRUCTURE, EQUIPMENT, WALLS, FLOORS, ROOFS AND FINISHES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR AND REPLACE DAMAGED EXISTING CONSTRUCTION. ANY EXISTING CONSTRUCTION OR FINISH ELEMENTS AFFECTED BY THE REMOVAL OF EXISTING BUILDING SYSTEMS SHALL BE PATCHED AND REPAIRED TO MATCH ADJACENT BUILDING FINISHES IN A CONSISTENT MANNER. 1 1 A A 5 5 11 11 12 12 13 13 21 21 23 23 24 24 B B C C E E F F G G J J L L Q Q 8 8 9 9 17 17 18 18 P P 2 2 KITCHEN PANTRY COMP. FREEZERFRIDGE WORK AREA LOBBY STAIR-2 WORK AREA RECEPTION BANQUET HALL STORAGE ENTERTAINMENT ROOM CRAFTS ROOMELECTRICAL SUPPLY MEN'S RESTROOM WOMEN'S RESTROOM RISER ROOM JANITOR FITNESS ROOM SOLARIUM COFFEE BAROFFICECONF. HEALTH/COUNSELING TLT.CLOSET ELEV. RM.ELEV. STAIR-1 STAIR-3 176'-4 1/2" 4'-2 1/4"24'-0"24'-0"8'-0"16'-0"8'-0"8'-0"31'-3"8'-9"24'-0"16'-0"4'-2 1/4" STOR. 10 8 ' - 1 0 1 / 2 " 4' - 2 1 / 4 " 24 ' - 0 " 18 ' - 9 " 17 ' - 9 " 8' - 0 " 8' - 0 " 16 ' - 0 " 8' - 0 " 4' - 2 1 / 4 " MAIN ENTRY TLT. D1 D2 D1 D1 D1 TYP D2 TYP D2 TYP D2 TYP D3 TYP D4 D4 D4 D3 TYP R 11 ' - 1 0 " 1 AREA OF WORK FOR BID ALTERNATE NO. 1: KITCHEN AREA HVAC UPGRADES, REFER TO MECHANICAL 1 PROTECT EXISTING WINDOWS AND STAINED GLASS TO REMAIN 1 REMOVE CEDAR WOOD BOARD SIDING, BATTENS AND TRIM, AND BUILDING PAPER. PROTECT EXISTING PLYWOOD SHEATHING TO REMAIN. VERIFY SHEATHING ATTACHMENT PER STRUCTURAL. D1 REMOVE EXTERIOR CEDAR WOOD TRIM AT WINDOWS AND DOORS D2 RETAIN AND PROTECT EXISTING INTERIOR WOOD TRIM AT WINDOWS AND DOORS D3 D4 SOLARIUM: REMOVE EXISTING GLASS WALL PANELS. PROTECT EXISTING GLULAM BEAM AND WOOD POSTS FROM DAMAGE. RETAIN AND PROTECT EXISTING INTERIOR WOOD TRIM. SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 22 x 3 4 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T 2/ 2 7 / 2 0 2 6 2 : 5 6 : 0 6 P M AD121 FIRST FLOOR DEMOLITION PLAN 100% CD SET 01.16.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , E X T E R I O R S I D I N G & W I N D O W R E P L A C E M E N T DEMOLITION PLAN FLAG NOTES DEMOLITION PLAN LEGEND 1 Addendum No. 3 2/27/2026 1/8" = 1'-0"1 FIRST FLOOR DEMOLITION PLAN DEMOLITION PLAN GENERAL NOTES KEY PLAN SCALE: 0 4 8 16 1/8" = 1'-0" PLAN NORTH 12106 REGISTERED ARCHITECT STATE OF WASHINGTON SARA ANN RICKARDS 1 1 A A 5 5 12 12 13 13 21 21 22 22 23 23 24 24 B B C C E E F F G G J J L L Q Q 8 8 9 9 17 17 18 18 I I P P N N 2 2 BILLIARD ROOM GAME ROOM GAME ROOM ELEV.MEN'S RESTROOM WOMEN'S RESTROOM CLASSROOM TLT. TLT. ASSEMBLY ROOM BALCONY BALCONY MECH. STAIR-2 STORAGE STAIR-1 STAIR-3 MECH. JAN. STORAGE 176'-4 1/2" 24'-0"8'-0"8'-0"31'-3"8'-9"24'-0"8'-0"8'-0"4'-2 1/4" 10 8 ' - 1 0 1 / 2 " 4' - 2 1 / 4 " 8' - 0 " 16 ' - 0 " 18 ' - 9 " 5' - 4 1 / 2 " 12 ' - 4 1 / 2 " 8' - 0 " 8' - 0 " 16 ' - 0 " 8' - 0 " 4' - 2 1 / 4 " 4'-2 1/4"24'-0"24'-0" D1 D1 D2 D1 D1 D2 TYP D2 TYP 1 1. 2. 3. 4. A. B. C. 5. 6. 7. 8. DIMENSIONS OF EXISTING GRIDLINES ARE BASED ON EXISTING DRAWINGS. FIELD VERIFY. FIELD VERIFY EXISTING CONDITIONS PRIOR TO THE START OF DEMOLITION OPERATIONS. BRING ANY DISCREPANCIES WHICH MAY SIGNIFICANTLY AFFECT DEMOLITION OR NEW CONSTRUCTION TO THE ATTENTION OF THE ARCHITECT FOR REVIEW. DO NOT ALTER THE STRUCTURAL INTEGRITY OF THE EXISTING BUILDING OR ITS ASSEMBLIES UNLESS SPECIFICALLY NOTED OTHERWISE. FOR THE PURPOSES OF THESE DEMOLITION DRAWINGS, DEFINITIONS ARE AS FOLLOWS: DEMOLISH - COMPLETE DEMOLITION OF AN ENTIRE STRUCTURE. NO ITEMS TO BE REMOVED OR SALVAGED. REMOVE - SELECTIVE REMOVAL OF A DESIGNATED BUILDING ELEMENT IN A MANNER THAT ENSURES THAT SURROUNDING EXISTING BUILDING ELEMENTS (TO REMAIN) ARE PROTECTED FROM DAMAGE. ALL REMOVED ITEMS ARE TO BE DISPOSED OF IN AN APPROPRIATE MANNER OFF-SITE. SALVAGE - REMOVAL OF A DESIGNATED BUILDING ELEMENT IN A MANNER THAT PROTECTS THE ITEM BEING REMOVED FOR RE-USE IN THE PROJECT, OR TURNED OVER TO THE OWNER. ITEM IS TO BE STORED BY THE GENERAL CONTRACTOR (FOR RE-USE) OR COORDINATED WITH THE OWNER FOR REMOVAL FROM THE SITE. REFER ALSO TO STRUCTURAL, MECHANICAL AND ELECTRICAL FOR ADDITIONAL DEMOLITION SCOPE REQUIREMENTS. AREAS OF REMOVAL OF EXISTING GWB ARE TO BE COORDINATED WITH STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS. PROTECT ALL EXISTING STRUCTURE, EQUIPMENT, WALLS, FLOORS, ROOFS AND FINISHES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR AND REPLACE DAMAGED EXISTING CONSTRUCTION. ANY EXISTING CONSTRUCTION OR FINISH ELEMENTS AFFECTED BY THE REMOVAL OF EXISTING BUILDING SYSTEMS SHALL BE PATCHED AND REPAIRED TO MATCH ADJACENT BUILDING FINISHES IN A CONSISTENT MANNER. NOTE: NOT ALL LEGEND ITEMS MAY BE PRESENT ON THIS SHEET EXISTING WALL TO REMAIN EXISTING DOOR AND FRAME TO REMAIN EXISTING RELITE / WINDOW TO REMAIN REMOVE EXISTING WINDOW ASSEMBLY # REFER TO FLAG NOTES FOR EXTENT OF EXTERIOR DEMOLITION STRUCTURE ABOVE / EDGE OF ROOF ABOVE REMOVE CEDAR WOOD BOARD SIDING, BATTENS AND TRIM, AND BUILDING PAPER. PROTECT EXISTING PLYWOOD SHEATHING TO REMAIN. VERIFY SHEATHING ATTACHMENT PER STRUCTURAL. D1 REMOVE EXTERIOR CEDAR WOOD TRIM AT WINDOWS AND DOORS D2 RETAIN AND PROTECT EXISTING INTERIOR WOOD TRIM AT WINDOWS AND DOORS D3 D4 SOLARIUM: REMOVE EXISTING GLASS WALL PANELS. PROTECT EXISTING GLULAM BEAM AND WOOD POSTS FROM DAMAGE. RETAIN AND PROTECT EXISTING INTERIOR WOOD TRIM. SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 22 x 3 4 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T 2/ 2 6 / 2 0 2 6 5 : 1 5 : 1 0 P M AD122 SECOND FLOOR DEMOLITION PLAN 100% CD SET 01.16.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , E X T E R I O R S I D I N G & W I N D O W R E P L A C E M E N T 1/8" = 1'-0"1 SECOND FLOOR DEMOLITION PLAN 1 Addendum No. 3 2/27/2026 DEMOLITION PLAN FLAG NOTES DEMOLITION PLAN LEGEND DEMOLITION PLAN GENERAL NOTES KEY PLAN SCALE: 0 4 8 16 1/8" = 1'-0" PLAN NORTH 12106 REGISTERED ARCHITECT STATE OF WASHINGTON SARA ANN RICKARDS 1 1 A A 5 5 11 11 12 12 13 13 21 21 23 23 24 B B C C E E F F G G J J L L Q Q A-202 4 A-201 4 A-201 5 A-202 5 8 8 9 9 17 17 18 18 P P 2 2 TLT. KITCHEN PANTRY COMP. FREEZERFRIDGE WORK AREA LOBBY STAIR-2 WORK AREA RECEPTION BANQUET HALL STORAGE ENTERTAINMENT ROOM CRAFTS ROOMELECTRICAL SUPPLY MEN'S RESTROOM WOMEN'S RESTROOM RISER ROOM JANITOR FITNESS ROOM SOLARIUM COFFEE BAROFFICECONF. HEALTH/COUNSELING TLT.CLOSET ELEV. RM.ELEV. STAIR-1 STAIR-3 176'-4 1/2" 4'-2 1/4"24'-0"24'-0"8'-0"16'-0"8'-0"8'-0"31'-3"8'-9"24'-0"16'-0"4'-2 1/4" STOR. 10 8 ' - 1 0 1 / 2 " 4' - 2 1 / 4 " 24 ' - 0 " 18 ' - 9 " 17 ' - 9 " 8' - 0 " 8' - 0 " 16 ' - 0 " 8' - 0 " 4' - 2 1 / 4 " MAIN ENTRY A-201 1 W1 TYP W1TYP W1 TYP W1 TYP W2 W2 W2 W2 W2 W2 1 R 11 ' - 1 0 " 2 TYP DS DS DS DS DS DS DS DS DS DS DS DS DS DS 1 AREA OF WORK FOR BID ALTERNATE NO. 1: KITCHEN AREA HVAC UPGRADES, REFER TO MECHANICAL 1 AT THE CONTRACTORS OPTION, ACCESS TO HVAC EQUIPMENT AT THE KITCHEN AREA MAY BE PROVIDED THROUGH EXISTING WALLS AT THE BANQUET HALL. WHERE PORTIONS OF EXISTING WALLS ARE REMOVED TO FACILITATE WORK, THE WALL ASSEMBLY AND FINISH SHALL BE PATCHED BACK TO MATCH EXISTING FINISH. PROTECT EXISTING WINDOWS AND STAINED GLASS TO REMAIN 1 1. 2. 3. 4. REFER TO A-503 FOR WALL ASSEMBLY TYPES. REFER TO MECHANICAL DRAWINGS FOR SIZING AND CONFIGURATION OF ALL DUCTS AND PIPES PENETRATING FLOOR ASSEMBLIES. REFER TO STRUCTURAL DRAWINGS FOR ADDED FOUNDATION HOLDDOWNS. REFER TO STRUCTURAL DRAWINGS FOR ADDED BOUNDARY CLIPS AT SHEATHING JOINTS. REINSTALL EXISTING DOWNSPOUTDS NOTE: NOT ALL LEGEND ITEMS MAY BE PRESENT ON THIS SHEET W1 WALL ASSEMBLY; REFER TO SHEET A-503 STRUCTURE ABOVE / EDGE OF ROOF ABOVE EXISTING WALL TO REMAIN EXISTING DOOR TO REMAIN EXISTING RELITE / WINDOW TO REMAIN WINDOW UNIT SOLARIUM - EXISTING WOOD ROOF BEAMS AND POSTS: STRIP OFF EXISTING CLEAR FINISH DOWN TO BARE WOOD. REMOVE WATER STAINS USING BLEACH AND SANDING AS REQUIRED TO PROVIDE UNIFORM WOOD COLOR AND APPEARANCE. APPLY CLEAR POLYURETHANE FINISH TO WOOD SURFACES AS SPECIFIED IN SECTION 09 9000. 1 SOLARIUM - GLAZING REPLACEMENT: PROVIDE GLASS WALL PANELS (IN-KIND REPLACEMENT OF EXISTING PANELS). PROVIDE SAFETY GLAZING. REFER TO GLAZING TYPES ON SHEET A-611. 2 BALCONY: PAINT EXISTING CEDAR WOOD SIDING AT INSIDE FACE OF BALCONY. REFER TO FINISH SCHEDULE ON EXTERIOR ELEVATIONS SHEET. 3 SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 22 x 3 4 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T 2/ 2 7 / 2 0 2 6 2 : 5 7 : 4 7 P M A-121 FIRST FLOOR PLAN 100% CD SET 01.16.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , E X T E R I O R S I D I N G & W I N D O W R E P L A C E M E N T 1/8" = 1'-0"1 FIRST FLOOR PLAN KEY PLAN 1 Addendum No. 3 2/27/2026 SCALE: 0 4 8 16 1/8" = 1'-0" PLAN NORTH FLOOR PLAN GENERAL NOTES FLOOR PLAN LEGEND FLOOR PLAN SHEET NOTES 12106 REGISTERED ARCHITECT STATE OF WASHINGTON SARA ANN RICKARDS 1 1 A A 5 5 11 11 12 12 13 13 21 21 23 23 24 24 B B C C E E F F G G J J L L Q Q 8 8 9 9 17 17 18 18 P P 2 2 TLT.PANTRY COMP. FRIDGE FREEZER KITCHEN BANQUET HALL STORAGE STAIR-1 ENTERTAINMENT ROOM ELEV. RM.ELEV. STAIR-2 WORK AREA LOBBY RECEPTION WORK AREA MEN'S RESTROOM WOMEN'S RESTROOM JANITOR RISER ROOM HEALTH/COUNSELINGSTAIR-3 TLT.CLOSET CONF.OFFICE COFFEE BAR SOLARIUM FITNESS ROOM CRAFTS ROOM SUPPLY ELECTRICAL PREP AND PAINT EXISTING WOOD PERGOLA FRAMING 176'-4 1/2" 4'-2 1/4"24'-0"24'-0"8'-0"16'-0"8'-0"8'-0"31'-3"8'-9"24'-0"16'-0"4'-2 1/4" 10 8 ' - 1 0 1 / 2 " 4' - 2 1 / 4 " 24 ' - 0 " 18 ' - 9 " 17 ' - 9 " 8' - 0 " 8' - 0 " 16 ' - 0 " 8' - 0 " 4' - 2 1 / 4 " R 11 ' - 1 0 " DS DS DS DS DS DS DSDSDS DS DS DS DS DS AREA OF WORK FOR BID ALTERNATE NO. 1: KITCHEN AREA HVAC UPGRADES, REFER TO MECHANICAL 1 EXISTING ACOUSTIC CEILING TILE (2'x2') EXISTING SUSPENDED WOOD CEILING EXISTING LIGHT FIXTURE (SIZE AND TYPE VARIES) EXISTING WALL TO REMAIN EXISTING DOOR/OPENING TO REMAIN EXISTING RELITE / WINDOW TO REMAIN EXISTING GWB CEILING EXISTING WOOD SOFFIT, PAINT WINDOW UNIT 1. 2. 3. INTERIOR CEILING LAYOUT IS SHOWN FOR REFERENCE ONLY. COORDINATE CEILING REMOVAL AND PATCHING WITH MECHANICAL AND ELECTRICAL WORK. WHERE CEILING REMOVAL IS REQUIRED TO FACILITATE WORK, THE CEILING SHALL BE PATCHED BACK TO MATCH EXISTING FINISH, TYPICAL UNLESS NOTED OTHERWISE. PAINT ALL EXPOSED EXTERIOR SOFFIT AND EXPOSED EXTERIOR WOOD FRAMING, TYPICAL UNLESS NOTED OTHERWISE. REFER TO EXTERIOR ELEVATIONS SHEETS FOR EXTERIOR FINISH SCHEDULE. SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 22 x 3 4 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T 2/ 2 6 / 2 0 2 6 5 : 1 5 : 4 8 P M A-151 FIRST FLOOR REFLECTED CEILING PLAN 100% CD SET 01.16.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , E X T E R I O R S I D I N G & W I N D O W R E P L A C E M E N T 1/8" = 1'-0"1 FIRST FLOOR REFLECTED CEILING PLAN 1 Addendum No. 3 2/27/2026 SCALE: 0 4 8 16 1/8" = 1'-0" PLAN NORTH GENERAL NOTES REFLECTED CEILING PLAN LEGEND REFELCTED CEILING PLAN 12106 REGISTERED ARCHITECT STATE OF WASHINGTON SARA ANN RICKARDS FIRST FLOOR 0" SECOND FLOOR 11' - 0" A E G QM 11 A-501 8 A-502 6 A-501 6 A-501 PREP AND PAINT EXISTING WOOD POSTS AND PERGOLA FRAMING, TYP 10 A-502 REINSTALL EXISTING ROLLING CANOPY 9 A-501 12 A-501 A-201 1 EAST ELEVATION BEYOND A-201 2 A-202 2 R W3 W6 W6 W1 W1 W6 W1 W3 W16 EXISTING WOOD FRAMED SOLARIUM, PROVIDE REPLACEMENT GLAZING, TYP EXTERIOR FINISH SCHEDULE ITEM MATERIAL FINISH REMARKS / COLOR SHINGLES FIBER CEMENT COLOR: SHERWIN WILLIAMS 7025 "BACKDROP" SELECT CEDARMILL - FIELD PAINTVERTICAL BOARD AND BATTEN (BB-1) ASPHALT MANUFACTURER COLOR: ANTIQUE BROWN METAL COLOR: TO MATCH AEP SPAN "COOL WALNUT" MANUFACTURER PRE-PRIMED, FIELD PAINT VERTICAL METAL PANEL (BB-2) WOOD COLOR: SHERWIN WILLIAMS 7031 "MEGA GREIGE" FIELD PAINTEXISTING EXPOSED EXTERIOR SOFFITS WOOD COLOR: SHERWIN WILLIAMS 7031 "MEGA GREIGE" FIELD PAINTEXISTING EXPOSED EXTERIOR STRUCTURE FIBER CEMENT COLOR: SHERWIN WILLIAMS 7501 "KEYSTONE GRAY" SELECT CEDARMILL - FIELD PAINTFIBER CEMENT TRIM WOOD COLOR: BENJAMIN MOORE 2094-20 "COPPER MINE" FIELD PAINT EXTERIOREXISTING EXTERIOR DOORS ALUMINUM COLOR: DARK BRONZEANODIZED ALUMINUMALUMINUM WINDOWS 1. 2. 3. REFER TO EXTERIOR DETAIL SHEETS FOR TYPICAL SIDING REVEAL AND TRANSITION DETAILS. REFER TO EXTERIOR DETAIL SHEETS FOR TYPICAL TRIMS, FLASHINGS, AND AIR BARRIER TRANSITIONS AT PENETRATIONS OF EXTERIOR WALLS. ALL EXISTING SHEET METAL DOWNSPOUTS AND CONDUCTOR HEADS TO BE REMOVED, PROTECTED, AND STORED FOR REINSTALLATION. 4 5 1 2 3 FIRST FLOOR 0" SECOND FLOOR 11' - 0" 1 20 241718 PREP AND PAINT EXISTING WOOD POSTS AND PERGOLA FRAMING, TYP PREP AND PAINT EXISTING WOOD POSTS, TYP 3 A-503 3 A-503 OPP 6 A-501 9 A-501 12 A-501 8 A-502 REINSTALL EXISTING BUILDING SIGNAGE 11 A-501 8 A-502 OUTSIDE CORNER 9 A-502 INSIDE CORNEROPP OPP 10 A-502 W3 W1 W1 W1 W1 W1 W1 W1 W6 W1 W1 W5 W3 W3 W6 W1 W3 8' - 0 " 6' - 9 " SO F F I T , T Y P AL I G N W I T H HORIZONTAL SIDING REVEAL, TYP PROTECT EXISTING WINDOWS TO REMAIN 1 VERTICAL METAL PANEL SIDING (BB-2) FIBER CEMENT VERTICAL BOARD AND BATTEN SIDING (BB-1) FIRST FLOOR 0" SECOND FLOOR 11' - 0" A REFER TO FOR CONTINUATION /5 A-201 W3 W6 12 A-501 SECOND FLOOR 11' - 0" I W7 W3 SECOND FLOOR 11' - 0" 18 W6 SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 22 x 3 4 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T 2/ 2 7 / 2 0 2 6 2 : 5 0 : 2 2 P M A-201 EXTERIOR ELEVATIONS 100% CD SET 01.16.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , E X T E R I O R S I D I N G & W I N D O W R E P L A C E M E N T EXTERIOR ELEVATION GENERAL NOTES 1/8" = 1'-0"5 EXTERIOR ELEVATION - EAST 1/8" = 1'-0"4 EXTERIOR ELEVATION - SOUTH KEY PLAN 1 Addendum No. 3 2/27/2026 EXTERIOR ELEVATION COLOR AND MATERIAL LEGEND SCALE: 0 4 8 16 1/8" = 1'-0" 1/8" = 1'-0"1 EXTERIOR ELEVATION - EAST AT BANQUET HALL 1/8" = 1'-0"2 EAST BALCONY 1/8" = 1'-0"3 NORTH BALCONY EXTERIOR ELEVATION -EXTERIOR ELEVATION - 12106 REGISTERED ARCHITECT STATE OF WASHINGTON SARA ANN RICKARDS GL-1 TYPICAL AT EXTERIOR WINDOW UNITS: CLEAR 1" INSULATED GLAZING UNIT WITH LOW-E COATING AND INSULATING SPACERS BASIS OF DESIGN (2) LAYERS CLEAR 1/4" GLASS WITH SOLARBAN-65 (#2 SURFACE), ARGON GAS FILL GL-2 TYPICAL AT SOLARIUM GLAZING REPLACEMENT: CLEAR 1" INSULATED GLAZING UNIT WITH LAMINATED SAFETY GLASS, WITH LOW-E COATING AND INSULATING SPACERS BASIS OF DESIGN (2) LAYERS CLEAR 1/4" LAMINATED SAFETY GLASS WITH SOLARBAN-65 (#2 SURFACE), ARGON GAS FILL, LAMINATED SAFETY GLASS SHALL HAVE (2) PLIES OF GLASS AND A 0.030" POLYVINYL BUTYRAL (PVB) INTERLAYER (PER WA STATE BUILDING CODE SECTION 2405.2.2.) GLAZING TYPES FINISH FLOOR FRAME: ALUMINUM FINISH: DARK BRONZE ANODIZED GLAZING: GL-1 PROJECTION:FIXED SHADING:EXISTING ROLLER SHADE (UNO) 6' - 9 " F V 7'-6 1/4" FV 4' - 3 " F V 6' - 9 " F V 4' - 3 " F V 7'-0" FV 6' - 9 " F V 4' - 3 " F V 6' - 9 " F V 4' - 3 " F V 6' - 9 " F V 4' - 3 " F V 4'-2 1/2" FV W1 W2 W3 W4 W5 W6 W7 6' - 9 " F V 4' - 3 " F V FV 1' - 8 " FV 4 1 / 2 " 7'-6 1/2" FV EQ EQ FV 1' - 8 " FV 4 1 / 2 " EQ EQ FV 1' - 8 " FV 4 1 / 2 " EQ EQ 7'-4 1/2" FV FV 1' - 8 " FV 4 1 / 2 " EQ EQ FV 1' - 8 " FV 4 1 / 2 " EQ EQ 6'-9 3/4" FV FV 1' - 8 " FV 4 1 / 2 " 4' - 3 " F V FV 1' - 8 " FV 4 1 / 2 " 6' - 9 " F V 3'-11 1/2" FV 6 A-504 5 A-504 4 A-504 7 A-504 10 A-504 SIM AT FC TRIM SIM AT FC TRIM AT SOFFIT AT ADJACENT PAVING AT FC TRIM 3 A-504 AT FC SIDING FRAME: ALUMINUM FINISH: DARK BRONZE ANODIZED GLAZING: GL-1 PROJECTION:FIXED SHADING:EXISTING ROLLER SHADE (UNO) FRAME: ALUMINUM FINISH: DARK BRONZE ANODIZED GLAZING: GL-1 PROJECTION:FIXED SHADING:EXISTING ROLLER SHADE (UNO) FRAME: ALUMINUM FINISH: DARK BRONZE ANODIZED GLAZING: GL-1 PROJECTION:FIXED SHADING:EXISTING ROLLER SHADE (UNO) FRAME: ALUMINUM FINISH: DARK BRONZE ANODIZED GLAZING: GL-1 PROJECTION:FIXED SHADING:EXISTING ROLLER SHADE (UNO) FRAME: ALUMINUM FINISH: DARK BRONZE ANODIZED GLAZING: GL-1 PROJECTION:FIXED SHADING:EXISTING ROLLER SHADE (UNO) FRAME: ALUMINUM FINISH: DARK BRONZE ANODIZED GLAZING: GL-1 PROJECTION:FIXED SHADING:EXISTING ROLLER SHADE (UNO) 2 A-504 AT FC SIDING 1 A-504 AT FC SIDING 7 A-504 AT FC SIDING 10 A-504 AT ADJACENT WINDOW DETAILS CALLOUTS TYPICAL UNO FINISH FLOOR 4' - 6 " F V FV 2' - 0 " 4'-6" FV W12 PROVIDE ANTI-GLARE WINDOW FILM WHERE INDICATED ON EXTERIOR ELEVATIONS W10 W11 7'-6" FV6'-10" FV 4' - 3 " F V 2' - 6 " F V 4' - 3 " F V 2' - 6 " F V W9W8 FRAME: ALUMINUM FINISH: DARK BRONZE ANODIZED GLAZING: GL-1 PROJECTION:FIXED SHADING:EXISTING ROLLER SHADE (UNO) 4' - 3 " F V 3' - 0 " F V 1'-8" 7'-1" FV 4' - 3 " F V 3' - 0 " F V 1'-8"1'-8" 7'-6 1/2" FV W13 W14 4' - 3 " F V 2' - 6 " F V 3'-8" FV 4' - 3 " F V 2' - 6 " F V 5'-1" FV FRAME: ALUMINUM FINISH: DARK BRONZE ANODIZED GLAZING: GL-1 PROJECTION:FIXED SHADING:EXISTING ROLLER SHADE (UNO) FRAME: ALUMINUM FINISH: DARK BRONZE ANODIZED GLAZING: GL-1 PROJECTION:FIXED SHADING:EXISTING ROLLER SHADE (UNO) FRAME: ALUMINUM FINISH: DARK BRONZE ANODIZED GLAZING: GL-1 PROJECTION:FIXED SHADING:EXISTING ROLLER SHADE (UNO) FRAME: ALUMINUM FINISH: DARK BRONZE ANODIZED GLAZING: GL-1 PROJECTION:FIXED SHADING:EXISTING ROLLER SHADE (UNO) FRAME: ALUMINUM FINISH: DARK BRONZE ANODIZED GLAZING: GL-1 PROJECTION:FIXED SHADING:EXISTING ROLLER SHADE (UNO) FRAME: ALUMINUM FINISH: DARK BRONZE ANODIZED GLAZING: GL-1 PROJECTION:FIXED SHADING:EXISTING ROLLER SHADE (UNO) 2 A-504 SIM2 A-504 SIM 2 A-504 SIM 2 A-504 SIM6 A-502 1. 2. 3. 4. 5. 6. WINDOWS TO BE INSTALLED AT EXISTING ROUGH OPENINGS. FIELD VERIFY ALL OPENINGS SIZES. REFER TO SHEETS A-541 AND A-542 FOR TYPICAL WINDOW FLASHING AND SEQUENCING DETAILS. REFER TO EXTERIOR ELEVATION SHEETS A-201 AND A-202 FOR WINDOW TYPE CALLOUTS. EXTERIOR ALUMINUM WINDOW UNITS: ENERGY PERFORMANCE REQUIREMENTS MAXIMUM U-FACTOR, AW WINDOW, FIXED:0.34 (WSEC TABLE C402.4) MAXIMUM SHGC, PF<0.2, FIXED:0.38 (WSEC TABLE C402.4) EXTERIOR ALUMINUM WINDOW UNITS: THERMAL TRANSMITTANCE REQUIREMENTS MARLIN WINDOWS SERIES 1505 (BASIS OF DESIGN) SHALL HAVE AN AAMA 1503 CONDENSATION RESISTANCE FACTOR (CRF) OF NOT LESS THAN 56 AND AN NFRC 500 CONDENSATION RESISTANCE (CR) OF NOT LESS THAN 31. SOLARIUM GLAZING REPLACEMENT: ENERGY PERFORMANCE REQUIREMENTS MAXIMUM U-FACTOR, FIXED:0.26 (WSEC TABLE C402.4) MAXIMUM SHGC, PF<0.2, FIXED:0.38 (WSEC TABLE C402.4) FINISH FLOOR 5' - 8 1 / 2 " F V FV 2' - 0 " FV 2' - 0 " 5' - 1 0 " F V FV 2'-7 3/4" FV 2'-7 3/4" FV 2'-7 3/4" FV 2'-7 3/4" W16 FRAME: SOLARIUM CAP AND COVER FINISH: DARK BRONZE ANODIZED GLAZING: GL-2 PROJECTION:FIXED SHADING:NONE W15 FRAME: SOLARIUM CAP AND COVER FINISH: DARK BRONZE ANODIZED GLAZING: GL-2 PROJECTION:FIXED SHADING:NONE 3'-8 3/8" FV 3'-8 3/8" FV 3'-8 3/8" FV 3'-8 3/8" FV 8 A-504 8 A-504 11 A-504 11 A-504 2021 WASHINGTON STATE ENERGY CODE (WSEC) SECTION C202 GENERAL DEFINITIONS ALTERATION. ANY CONSTRUCTION, RETROFIT OR RENOVATION TO AN EXISTING STRUCTURE OTHER THAN REPAIR OR ADDITION. ALSO, A CHANGE IN A BUILDING, ELECTRICAL, GAS, MECHANICAL OR PLUMBING SYSTEM THAT INVOLVES AN EXTENSION, ADDITION OR CHANGE TO THE ARRANGEMENT, TYPE OR PURPOSE OF THE ORIGINAL INSTALLATION. REPAIR. THE RECONSTRUCTION OR RENEWAL OF ANY PART OF AN EXISTING BUILDING. SECTION C503 ALTERATIONS C503.1 GENERAL ALTERATIONS TO ANY BUILDING OR STRUCTURE SHALL COMPLY WITH THE REQUIREMENTS OF SECTION C503 AND THE CODE FOR NEW CONSTRUCTION. ALTERATIONS TO AN EXISTING BUILDING, BUILDING SYSTEM OR PORTION THEREOF SHALL CONFORM TO THE PROVISIONS OF THIS CODE AS THEY RELATE TO NEW CONSTRUCTION WITHOUT REQUIRING THE UNALTERED PORTIONS OF THE EXISTING BUILDING OR BUILDING SYSTEM TO COMPLY WITH THIS CODE. ALTERATIONS SHALL BE SUCH THAT THE EXISTING BUILDING OR STRUCTURE IS NO LESS CONFORMING WITH THE PROVISIONS OF THIS CODE THAN THE EXISTING BUILDING OR STRUCTURE WAS PRIOR TO THE ALTERATION. THE ADDITIONAL ENERGY EFFICIENCY CREDIT REQUIREMENTS IN SECTION C406.1 AND THE RENEWABLE ENERGY REQUIREMENTS IN SECTION C411 DO NOT APPLY TO ALTERATIONS. C503.3 BUILDING ENVELOPE NEW BUILDING ENVELOPE ASSEMBLIES THAT ARE PART OF THE ALTERATION SHALL COMPLY WITH SECTIONS C402.1 THROUGH C402.5 AND SECTIONS C503.3.1 THROUGH C503.3.3. EXCEPTION: AIR LEAKAGE TESTING IS NOT REQUIRED FOR ALTERATIONS AND REPAIRS, UNLESS THE PROJECT INCLUDES A CHANGE IN SPACE CONDITIONING ACCORDING TO SECTION C503.2 OR A CHANGE OF OCCUPANCY OR USE ACCORDING TO SECTION C505.1. NO CHANGE OF OCCUPANCY OR USE IS PROPOSED. C503.3.1 ROOF REPLACEMENT ROOF REPLACEMENTS SHALL COMPLY WITH TABLE C402.1.3 OR C402.1.4 WHERE THE EXISTING ROOF ASSEMBLY IS PART OF THE BUILDING THERMAL ENVELOPE AND CONTAINS NO INSULATION OR THE INSULATION IS LOCATED ENTIRELY ABOVE THE ROOF DECK. IN NO CASE SHALL THE R-VALUE OF THE ROOF INSULATION BE REDUCED OR THE U-FACTOR OF THE ROOF ASSEMBLY BE INCREASED AS PART OF THE ROOF REPLACEMENT. C503.3.2.1 REPLACEMENT FENESTRATION PRODUCTS WHERE SOME OR ALL OF AN EXISTING FENESTRATION UNIT IS REPLACED WITH A NEW FENESTRATION PRODUCT, INCLUDING SASH AND GLAZING, THE REPLACEMENT FENESTRATION UNIT SHALL MEET THE APPLICABLE REQUIREMENTS FOR U-FACTOR AND SHGC IN TABLE C402.4. NO NEW VERTICAL FENESTRATION AREA IS PROPOSED. NO NEW SKYLIGHT AREA IS PROPOSED. SECTION C504 REPAIRS C504.1 GENERAL BUILDINGS AND STRUCTURES, AND PARTS THEREOF, SHALL BE REPAIRED IN COMPLIANCE WITH SECTION C501.3 AND THIS SECTION. WORK ON NONDAMAGED COMPONENTS THAT IS NECESSARY FOR THE REQUIRED REPAIR OF DAMAGED COMPONENTS SHALL BE CONSIDERED PART OF THE REPAIR AND SHALL NOT BE SUBJECT TO THE REQUIREMENTS FOR ALTERATIONS IN THIS CHAPTER. ROUTINE MAINTENANCE REQUIRED BY SECTION C501.3, ORDINARY REPAIRS EXEMPT FROM PERMIT, AND ABATEMENT OF WEAR DUE TO NORMAL SERVICE CONDITIONS SHALL NOT BE SUBJECT TO THE REQUIREMENTS FOR REPAIRS IN THIS SECTION. C504.2 APPLICATION FOR THE PURPOSES OF THIS CODE, THE FOLLOWING SHALL BE CONSIDERED REPAIRS. 1. GLASS ONLY REPLACEMENTS IN AN EXISTING SASH AND FRAME. SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 22 x 3 4 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T 2/ 2 6 / 2 0 2 6 5 : 1 6 : 2 4 P M A-611 WINDOW TYPES 100% CD SET 01.16.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , E X T E R I O R S I D I N G & W I N D O W R E P L A C E M E N T 1/4" = 1'-0" WINDOW TYPES 1 Addendum No. 3 2/27/2026 WINDOW TYPES GENERAL NOTES ENERGY CODE SUMMARY 1 12106 REGISTERED ARCHITECT STATE OF WASHINGTON SARA ANN RICKARDS REMOTE SENSOR DUCT MOUNTED SMOKE DETECTOR DUCT DOWN DUCT ACCESS DOOR PARALLEL DAMPER THERMOSTAT MVD SFD OBD T'STAT TIME CLOCK CFM SUPPLY CFM CFMS T S TC SWITCH CUBIC FEET OF AIR PER MINUTE SQUARE TO ROUND TRANSITION SECTION THROUGH DUCT COMBINATION SMOKE / FIRE DAMPER MANUAL VOLUME DAMPER OPPOSED BLADE DAMPER DUCT WITH TURNING VANES NEW CFM EXHAUST EXISTING CFME (N) 30/10 30X10 POINT OF CONNECTION POINT OF DEMOLITION MOTORIZED DAMPER 10ø P.O.D. P.O.C M (E) OR EXIST. INDICATES ROUND DUCT (INCHES) INDICATES SQUARE DUCT (INCHES) INDICATES OVAL DUCT (INCHES) CFM RETURNCFMR FLEXIBLE DUCT DUCT WITH ACOUSTICAL LINER EXIST. DUCT OR EQUIP. TO REMAIN SQ., RECT. OR ROUND DUCT AS NOTED EXIST. DUCT OR EQUIP. TO BE REMOVED HVAC LEGEND SYMBOL ABBREVIATIONS DESCRIPTION CD CR / CE SD / SR CEILING DIFFUSER, SUPPLY CEILING REGISTER, RETURN & EXHAUST SIDE WALL DIFFUSER & REGISTER BACK DRAFT DAMPERBD RS DD CO2 SENSORCO2 SENSORCO2 A.F.F.ABOVE FINISHED FLOOR OUTSIDE AIRO.S.A. M-1 A EQUIPMENT ID. No. SHEET No. DETAIL No. EQUIPMENT REFERENCE SECTION REFERENCE DETAIL REFERENCE HUMIDISTATH THERMOSTAT & CO2 SENSORT'STATT* 1.DUCT SEALING SHALL MEET REQUIREMENTS LISTED IN CHAPTER 6 OF THE IMC. IN ADDITION, PROVIDE SEAL CLASS A FOR ALL DUCTWORK. 2.CONSTRUCT RECTANGULAR DUCTWORK TO MEET ALL FUNCTIONAL CRITERIA DEFINED IN CHAPTER 11, OF THE SMACNA HVAC DUCT CONSTRUCTION STANDARDS. PROVIDE DIAGONAL CREASING OR BEADING ON ALL PANELS WIDER THAN 18-INCHES, AND PANELS LESS THAN 18 GAGE. CONSTRUCT ROUND AND FLAT OVAL DUCTWORK IN ACCORDANCE WITH CHAPTER 3 OF SMACNA HDCS. 3.DUCTMATE, METU, OR W.D.C.I. DUCT CONNECTION SYSTEMS ARE ACCEPTABLE. DUCTS CONSTRUCTED USING THESE SYSTEMS WILL REFER TO THE MANUFACTURER'S GUIDELINES FOR SHEET GAGE, INTERMEDIATE REINFORCEMENT SIZE AND SPACING, AND JOINT REINFORCEMENTS. 4.PROVIDE COLLARS WHEREVER AN EXPOSED DUCT PASSES THROUGH A WALL, SLAB, OR CEILING:1-INCH WIDE, 18-GAGE ANGLE WITH MITERED CORNERS & SEAL WITH FIBERGLASS AND MASTIC. 5.SPIN-IN FITTINGS SHALL BE CONICAL TYPE WITH VOLUME DAMPER, AND QUADRANT; FLEX MASTER ELGEN OR EQUIVALENT. 6.ELBOWS IN RECTANGULAR OR SQUARE DUCTWORK SHALL HAVE AN INSIDE RADIUS EQUAL TO DIMENSION OF ELBOW IN THE PLANE OF THE TURN. 7.ELBOWS IN ROUND DUCTWORK SHALL HAVE THE INSIDE RADIUS EQUAL TO DIMENSION OF ELBOW IN THE PLANE OF THE TURN. USE SEGMENTED, STANDING SEAM, PLEATED, OR STAMPED ELBOWS. ADJUSTABLE ELBOWS ARE ALLOWED IF RADIUS CONFORMS TO ABOVE. 8.SQUARE CORNER INSERTS (TURNING VANES) SHALL BE SMACNA FIG. 4.3 DOUBLE THICKNESS, RUNNER TYPE 2 WITH 2-1/8-INCH SPACING. 9.PROVIDE VOLUME DAMPERS IN THE DUCT TO EACH SUPPLY, EXHAUST, OR RETURN OPENING. LOCATE DAMPERS AT A POINT WHERE THE DUCT IS ACCESSIBLE; AS FAR FROM THE OUTLET AS POSSIBLE. DAMPERS SHALL BE RUSKIN MD25 OR MDRS25. 10.THOROUGHLY CLEAN ALL DEBRIS FROM THE INSIDE OF ALL DUCTWORK AND PLENUMS. 11.MECHANICAL DRAWINGS SHOW APPROXIMATE LOCATIONS FOR GRILLES AND DIFFUSERS. ENSURE THAT DIFFUSER AND GRILLE FRAMES MATCH CEILING TYPES AND FINISH PRIOR TO ORDERING. 12.CONNECT FLEXIBLE DUCTS TO METAL DUCTS WITH A SLIP JOINT MADE USING FIRE RESISTANT MASTIC AND CLAMP, IDEAL "SNAP-LOCK" OR VENTLOCK "SURETIGHT NO. 670" AT EACH END. SUPPORT IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS. DO NOT INSTALL WITH ABRUPT BENDS OR OFFSETS. MAXIMUM LENGTH 5-FEET. LOW PRESSURE INSULATED FLEXIBLE DUCT SHALL BE THERMAFLEX MK-E. 13.AIR SYSTEMS SHALL BE BALANCED SO AS TO FIRST MINIMIZE THROTTLING LOSSES, THEN ADJUSTED TO MEET DESIGN FLOW CONDITIONS. 14.DIFFUSERS & GRILLES SHALL BE COORDINATED WITH THE EXISTING LOCATION OF LIGHT FIXTURES. 15.ALL SHEET METAL PRODUCTS SHALL COMPLY WITH SMACNA DUCT CONSTRUCTION STANDARDS, CURRENT EDITION. 16.ALL RECTANGULAR DUCTWORK SIZES SHOWN ARE GALVANIZED SHEET METAL UNLESS NOTED OTHERWISE. ROUND DUCT SHALL BE SHEET METAL. PROVIDE TURNING VANES IN ALL ROUND 2-PIECE AND RECTANGULAR 90 DEGREE ELBOWS. 17.ALL DUCT SIZES SHOWN ARE CLEAR INSIDE DIMENSIONS. 18.PROVIDE FLEXIBLE CONNECTORS AT DUCT CONNECTIONS TO ALL AIR HANDLING EQUIPMENT. 19.ALL LONGITUDINAL AND TRANSVERSE JOINTS, SEAMS AND CONNECTIONS OF LOW-PRESSURE SUPPLY AND RETURN DUCTS SHALL BE SECURELY FASTENED AND SEALED WITH WELDS, GASKETS, MASTICS (ADHESIVES), MASTIC-PLUS-EMBEDDED-FABRIC SYSTEMS OR TAPES INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S INSTALLATION INSTRUCTIONS. HVAC MATERIALS & METHODS 1.WHERE USED TO CONTROL BOTH HEATING AND COOLING, ZONE THERMOSTATIC CONTROLS SHALL PROVIDE A TEMPERATURE RANGE OR DEADBAND OF AT LEAST 5°F WITHIN WHICH THE SUPPLY OF HEATING AND COOLING ENERGY TO THE ZONE IS CAPABLE OF BEING SHUT OFF OR REDUCED TO A MINIMUM PER C403.2.4.1.2. 2.EACH ZONE SHALL BE PROVIDED WITH THERMOSTATIC SETBACK CONTROLS THAT ARE CONTROLLED BY EITHER AN AUTOMATIC TIME CLOCK OR PROGRAMMABLE CONTROL SYSTEM. THERMOSTATIC SETBACK SHALL BE IN ACCORDANCE WITH C403.2.4.2.1 3.PROVIDE AUTOMATIC START CONTROLS FOR EACH HVAC SYSTEM. THE CONTROLS SHALL BE CAPABLE OF AUTOMATICALLY ADJUSTING THE DAILY START TIME OF THE HVAC SYSTEM IN ORDER TO BRING EACH SPACE TO THE DESIRED OCCUPIED TEMPERATURE IMMEDIATELY PRIOR TO SCHEDULED OCCUPANCY IN ACCORDANCE WITH WSEC, C403.2.4.2.3. 4.OUTDOOR AIR SUPPLY, EXHAUST OPENINGS AND RELIEF OUTLETS SHALL BE EQUIPPED WITH NOT LESS THAN CLASS I MOTORIZED DAMPERS IN ACCORDANCE WITH WSEC, C403.2.4.3, AND SHALL BE INSTALLED WITH AUTOMATIC CONTROLS CONFIGURED TO CLOSE ALL OUTSIDE AIR, RELIEF AND EXHAUST DAMPERS WHEN EQUIPMENT IS NOT RUNNING. 5.PROVIDE COMMISSIONING OF THE MECHANICAL SYSTEM IN ACCORDANCE WITH C408. PROVIDE COMMISSIONING PLAN IN ACCORDANCE WITH C408.1.2. PROVIDE FUNCTIONAL TESTING CRITERIA INCLUDING SEQUENCE OF OPERATION, NEW AND EXISTING TO REMAIN INTERFACE & TEST PROCEDURES PER WASHINGTON STATE ENERGY CODE. SEE SPECIFICATIONS FOR SPECIFIC EQUIPMENT TESTING REQUIREMENTS. ITEMS TO BE COMMISSIONED ARE: HRU'S, CABINET HEATERS, UNIT HEATERS, DUCT HEATERS, EXHAUST FANS, STRATIFICATION FANS, INDOOR AIR HANDLING UNITS, CONDENSING UNITS, AND ROOF MOUNTED PACKAGED RTU'S. PROVIDE PRELIMINARY AND FINAL COMMISSIONING REPORTS. SUBMIT FIGURE C408.1.2.1 COMPLIANCE CHECKLIST FROM SEC TO AUTHORITY HAVING JURISDICTION UPON COMPLETION OF PRELIMINARY COMMISSIONING REPORT. PROVIDE CLOSEOUT DOCUMENTS IN COMPLIANCE WITH C103.6. ALL COMMISSIONING REPORTS SHALL BE COMPLETED BY A COMMISSIONING PROFESSIONAL AND SHALL BE COMPLETED PRIOR TO FINAL MECHANICAL INSPECTION. 6.PURSUANT TO SECTION C408.2.3, FUNCTIONAL PERFORMANCE TESTING, THE HVAC SYSTEM SHALL BE TESTED TO ENSURE THAT THE CONTROL DEVICES, EQUIPMENT AND SYSTEMS ARE CALIBRATED, ADJUSTED, AND OPERATE IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS. SEQUENCES OF OPERATION SHALL BE FUNCTIONALLY TESTED TO ENSURE THEY OPERATE IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS. WASHINGTON STATE ENERGY CODE NOTES 1.THE FOLLOWING ITEMS ARE TAKEN DIRECTLY FROM THE 2021 INTERNATIONAL BUILDING CODE, 2021 INTERNATIONAL BUILDING CODE AND FROM THE AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) STANDARD 7-10. THE CONTRACTOR SHALL REFER TO THE ABOVE FOR ADDITIONAL INFORMATION, EXCEPTIONS, AND FURTHER DESCRIPTIONS. THE CONTRACTOR SHALL ADHERE TO REQUIREMENTS AND AS SUCH, SHALL BE INCLUDED WITHIN BID. 2.2021 IMC 301.18; WHERE EARTHQUAKE LOADS ARE APPLICABLE IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE, MECHANICAL SYSTEM SUPPORTS SHALL BE DESIGNED AND INSTALLED FOR THE SEISMIC FORCES IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. 3.2021 IBC 1613.1; EVERY STRUCTURE, AND PORTION THEREOF, INCLUDING NON-STRUCTURAL COMPONENTS THAT ARE PERMANENTLY ATTACHED TO STRUCTURES AND THEIR SUPPORTS AND ATTACHMENTS, SHALL BE DESIGNED AND CONSTRUCTED TO RESIST THE EFFECTS OF EARTHQUAKE MOTIONS IN ACCORDANCE WITH CHAPTERS 11, 12, 13, 15, 17, AND 18 OF ASCE 7-10, AS APPLICABLE. 4.2021 IBC 1704.3, STATEMENT OF SPECIAL INSPECTIONS: WHERE SPECIAL INSPECTIONS OR TESTS ARE REQUIRED BY SECTION 1705, THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL PREPARE A STATEMENT OF SPECIAL INSPECTIONS IN ACCORDANCE WITH SECTION 1704.3.1 FOR SUBMITTAL BY THE APPLICANT IN ACCORDANCE WITH SECTION 1704.2.3. 5.2021 IBC 1704.4, CONTRACTOR RESPONSIBILITY: EACH CONTRACTOR RESPONSIBLE FOR THE DESIGN AND CONSTRUCTION OF MAIN WIND OR SEISMIC FORCE-RESISTING SYSTEM, DESIGNATED SEISMIC SYSTEM, OR A WIND OR SEISMIC FORCE-RESISTING COMPONENT LISTED IN THE STATEMENT OF SPECIAL INSPECTIONS SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND THE OWNER OR THE OWNER'S AUTHORIZED AGENT PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT. THE CONTRACTOR'S STATEMENT OF RESPONSIBILITY SHALL CONTAIN ACKNOWLEDGEMENT OF AWARENESS OF THE SPECIAL REQUIREMENTS CONTAINED IN THE STATEMENT OF SPECIAL INSPECTIONS. 6.2021 IBC 1705.12, SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE. SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE SHALL BE REQUIRED AS SPECIFIED IN SECTIONS 1705.12.1 THROUGH 1705.12.9, UNLESS EXEMPTED BY THE EXCEPTIONS OF SECTION 1704.2. NON-STRUCTURAL COMPONENT NOTES ALL BACKGROUNDS PROVIDED ON THE DRAWINGS HAVE BEEN TAKEN FROM THE PROJECT RECORD DRAWINGS. THE RECORD DRAWINGS SHALL BE MADE AVAILABLE TO THE CONTRACTOR BY THE OWNER FOR REFERENCE, INFORMATION, AND COORDINATION PURPOSES ONLY. ALL HAND DRAFTED NOTES THAT REMAIN ON THE PDF BACKGROUNDS ARE ORIGINAL TO THE RECORD DRAWINGS AND MAY NOT APPLY TO THE CURRENT SCOPE OF WORK. ALL NEW AND OR DEMOLITION WORK SHOWN IN BOLD FOR CLARITY. OVERALL PROJECT DRAWING INFORMATION 1.EXISTING MATERIALS THAT ARE REMOVED SHALL NOT BE REUSED IN NEW SYSTEMS, EXCEPT WHERE INDICATED AS BEING RELOCATED. 2.WHERE INDICATED, DUCTWORK AND PIPING OR PORTIONS OF DUCTWORK AND PIPING SHALL BE REUSED. REFER TO DRAWING PLANS FOR POINTS OF CONNECTIONS. 3.PROVIDE TEMPORARY SUPPORT OF EXISTING MECHANICAL SYSTEMS WHERE REQUIRED BY DEMOLITION OR ALTERATION OF EXISTING STRUCTURE DURING CONSTRUCTION. COORDINATE WITH GENERAL CONTRACTOR AND PROVIDE ALL NECESSARY PIPE, DUCT AND EQUIPMENT SUPPORTS AND HANGERS TO MAINTAIN INTEGRITY, SAFETY AND PROPER OPERATION OF EXISTING MECHANICAL SYSTEMS FOR THE DURATION OF THE WORK. 4.THE CONTRACTOR SHALL COORDINATE WITH THE OWNER AS TO PRIORITIZING WHICH AHU, RTU AND OR HRU UNITS SHALL INITIALLY BE REPLACED. IT IS THE INTENT TO REMOVE AND REPLACE THOSE UNITS WHICH ARE NO LONGER FUNCTIONING PROPERLY OR ARE NON-OPERATIONAL FIRST SO AS TO ENSURE THAT ZONES IMPACTED BY THE UNIT REPLACEMENTS SHALL HAVE PROPER AIR CIRCULATION. EXISTING MECHANICAL CONDITIONS MECHANICAL GENERAL NOTES 1.THE TOTAL INSTALLATION SHALL COMPLY WITH ANY REQUIREMENTS OF THE LEGALLY CONSTITUTED AUTHORITIES HAVING JURISDICTION INCLUDING 2021 INTERNATIONAL BUILDING CODE (IBC), 2021 INTERNATIONAL MECHANICAL CODE (IMC), 2021 UNIFORM PLUMBING CODE (UPC) WITH WASHINGTON STATE AMENDMENTS AND THE 2021 WASHINGTON STATE ENERGY CODE. 2.THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BID AND SHALL THOROUGHLY FAMILIARIZE THEMSELVES WITH THE EXISTING CONDITIONS UNDER WHICH THEY WILL BE REQUIRED TO WORK. INDICATED DIMENSIONS ARE APPROXIMATE AND ARE GIVEN FOR ESTIMATE PURPOSES ONLY. PRIOR TO PERFORMING ANY NEW WORK, THE CONTRACTOR SHALL CAREFULLY CHECK AND VERIFY DIMENSIONS, SIZES, REQUIRED CLEARANCES AND SHALL ASSUME FULL RESPONSIBILITY FOR THE FITTING OF EQUIPMENT AND MATERIALS HEREIN REQUIRED TO OTHER PARTS OF THE WORK OF OTHER TRADES. DUCT DIMENSIONS SHOWN ON PLANS ARE NET INSIDE CLEAR. 3.THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC TO THE EXTENT THAT OFFSETS, BENDS, SPECIAL FITTINGS AND LOCATIONS ARE NOT EXACTLY LOCATED. DUCTWORK DIMENSIONS SHOWN ON THE DRAWINGS ARE NET INSIDE DIMENSIONS. DO NOT FABRICATE DUCTWORK FROM THESE DRAWINGS. THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR SUPPLYING SHOP DRAWINGS WHICH REFLECT THE PROPOSED INSTALLATION. THE SHOP DRAWINGS MUST BE APPROVED BY THE ENGINEER PRIOR TO ANY SHEET METAL FABRICATION. THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING ACCURATE AS-BUILT DRAWINGS, IN AUTOCAD FORMAT, AT THE COMPLETION OF THE PROJECT AND SUBMITTING THEM TO THE ENGINEER AND OWNER. 4.ALL EQUIPMENT, PIPING, DUCTWORK, CONTROLS AND OR WIRING SHOWN IS A REPRESENTATION OF THE ACTUAL SYSTEMS AND IS NOT TO BE CONSIDERED AN AS-BUILT. ALL DIMENSIONS, LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF DEMOLITION OR NEW CONSTRUCTION. 5.ITEMS RELATED TO PLUMBING UTILITIES AND/OR OTHER SERVICE(S); MATERIALS, LABOR, PERMITS, FEES, ETC., SHALL BE VERIFIED WITH THE RESPECTIVE SERVING UTILITY COMPANY PRIOR TO SUBMISSION OF A BID. THE ACT OF SUBMITTING A BID SHALL CONSTITUTE FULL RESPONSIBILITY TO INSTALL SERVICE(S) IN COMPLIANCE WITH THE REQUIREMENTS OF THE SERVING UTILITY COMPANY AND THE MECHANICAL ENGINEER. 6.THE CONTRACTOR SHALL COMPLY WITH THE CONTRACT DOCUMENTS IN LAYING OUT THEIR WORK AND EQUIPMENT. THEY SHALL COORDINATE THE WORK OF THIS SECTION WITH THE WORK OF OTHER TRADES AND JOB CONDITIONS. 7.THE INSTALLATION OF ACCESS PANELS OR OTHER INDICATING EQUIPMENT OR SPECIALTIES REQUIRING READING, ADJUSTMENT, INSPECTION, REPAIRS, REMOVAL OR REPLACEMENT SHALL BE CONVENIENTLY LOCATED WITH REFERENCE TO THE FINISHED BUILDING. 8.EQUIPMENT AND FIXTURES INSTALLED UNDER THIS CONTRACT SHALL BE HUNG OR ANCHORED IN ACCORDANCE WITH 2021 (IBC) AND 2021 UPC. WHERE NOT SPECIFICALLY INDICATED OTHERWISE, DUCTWORK AND EQUIPMENT SHALL BE SUPPORTED PER THE SMACNA GUIDELINES FOR SEISMIC RESTRAINT AND CURRENT APPLICABLE UNIFORM MECHANICAL CODE. 9.PROVIDE MANUAL VOLUME DAMPERS AT UPSTREAM PORTION OF TERMINAL AIR BRANCHES. THESE SHALL BE OF THE LOCKING QUADRANT TYPE. WHERE LOCATED OVER SLOPED OR HARD CEILINGS, PROVIDE DURO-DYNE ANGLE GEAR DRIVE OR BOWDEN CABLE CONTROL SYSTEM OR PROVIDE UNITED ENERTECH POWER/BALANCE SYSTEM. REMOTE PLATE LOCATIONS TO BE LOCATED AS DETERMINED BY ARCHITECT. 10.PROVIDE MINIMUM 1" ACOUSTICAL LINING IN DUCTWORK WITHIN 10 FEET OF AIR MOVING EQUIPMENT. PROVIDE DURO-DYNE FLEXIBLE CONNECTION AT DUCT AT EQUIPMENT LOCATIONS. 11.DUCTS IN AN UNCONDITIONED SPACE OR EXTERIOR DUCT WORK SHALL BE INSULATED IN ACCORDANCE WITH THE WASHINGTON STATE ENERGY CODE (WSEC) AND THE DUCT INSULATION TABLE AS PROVIDED ON THIS SHEET. 12.TESTING, ADJUSTING, AND BALANCING (TAB) OF THE AIR CONDITIONING SYSTEMS AND RELATED ANCILLARY EQUIPMENT WILL BE PERFORMED BY A CERTIFIED, INDEPENDENT THIRD PARTY, AABC OR NEBB AGENCY PROCURED BY THE MECHANICAL CONTRACTOR. A COMPLETE AIR BALANCE REPORT TO BE SUBMITTED TO THE ADMINISTRATIVE AUTHORITY AND TO THE MECHANICAL ENGINEER AND APPROVED PRIOR TO OCCUPANCY. 13.AIR HANDLING DUCT SYSTEMS SHALL BE CONSTRUCTED, INSTALLED AND INSULATED AS DESCRIBED IN CHAPTER 6 OF THE 2021 IMC. 14.MATERIALS EXPOSED WITHIN DUCTS OR PLENUMS SHALL BE NONCOMBUSTIBLE OR SHALL HAVE FLAME SPREAD INDEX NOT GREATER THAN 25 AND A SMOKE DEVELOPED INDEX NOT GREATER THAN 50 (2021 IMC SECTION 602.2). 15.UNLESS OTHERWISE STATED, MAXIMUM LENGTH FOR FLEXIBLE DUCTWORK SHALL NOT EXCEED FIVE FEET (5'-0"). ALUMINUM FLEX DUCTWORK WILL NOT BE ALLOWED ON ANY PORTION OF THE DUCTWORK SYSTEM. 16.TEST SYSTEM(S) IN ACCORDANCE WITH REQUIREMENTS OF THE GOVERNING AUTHORITIES. 17.CONNECTIONS TO EXISTING SERVICES SHALL BE MADE SUCH THAT INTERRUPTION TIME WILL BE AS SHORT AS POSSIBLE. GIVE THE OWNERS REPRESENTATIVE A MINIMUM OF 72 HOURS NOTICE OF SUCH INTERRUPTIONS AND THE ACTUAL SHUT-DOWN TIME SHALL BE AT A TIME DESIGNATED BY THE OWNERS REPRESENTATIVE. 18.ANY SUBSTITUTION MADE THAT IS DIFFERENT FROM WHAT IS SPECIFIED ON THE DRAWINGS NEEDS TO BE APPROVED BY ENGINEER OF RECORD AND OWNER PRIOR TO BID AND SHALL BE CLEARLY INDICATED ON THE SUBMITTAL AS TO THAT IS BEING SUBSTITUTED. 19.FIXTURES, EQUIPMENT, PIPING, FITTINGS, AND MATERIALS SHALL BE UL LISTED. APPLICABLE CODES · 2021 INTERNATIONAL BUILDING CODE (IBC) WITH WASHINGTON STATE AMENDMENTS · 2021 UNIFORM PLUMBING CODE (IPC) WITH CITY OF RENTON AMENDMENTS. · 2021 INTERNATIONAL MECHANICAL CODE (IMC) WITH WASHINGTON STATE AMENDMENTS · 2020 NATIONAL ELECTRICAL CODE (NFPA 70 - 2020) INC. ANNEX A, B, AND C · 2021 WASHINGTON STATE ENERGY CODE (WSEC), COMMERCIAL WAC SECTIONS · 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC) · 2017 WASHINGTON ACCESSIBILITY CODE THE TOTAL INSTALLATION SHALL COMPLY WITH ANY REQUIREMENTS OF THE LEGALLY CONSTITUTED AUTHORITY HAVING JURISDICTION, CITY OF RENTON. ALL MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE LATEST EDITION OF THE FOLLOWING CODES AS ADOPTED BY THE AHJ. 1.DEMOLITION: WORK REQUIRED IS NOTED ON PLANS. VERIFY WITH ON SITE CONDITION AND OWNER. SALVAGE EQUIPMENT FOR OWNER'S USE AS NOTED. 2.COORDINATE WORK WITH GENERAL CONSTRUCTION TO MINIMIZE DUST & DUST MIGRATION. 3.EXISTING MATERIALS THAT ARE REMOVED SHALL NOT BE REUSED IN NEW SYSTEMS, EXCEPT WHERE INDICATED AS BEING RELOCATED. 4.WHERE INDICATED, PIPING OR PORTIONS OF PIPING SHALL BE REUSED. REFER TO DRAWING PLANS FOR POINTS OF CONNECTIONS. 5.PROVIDE TEMPORARY SUPPORT OF EXISTING MECHANICAL SYSTEMS WHERE REQUIRED BY DEMOLITION OR ALTERATION OF EXISTING STRUCTURE DURING CONSTRUCTION. COORDINATE WITH GENERAL CONTRACTOR AND PROVIDE ALL NECESSARY PIPE, DUCT AND EQUIPMENT SUPPORTS AND HANGERS TO MAINTAIN INTEGRITY, SAFETY AND PROPER OPERATION OF EXISTING MECHANICAL SYSTEMS FOR THE DURATION OF THE WORK. 6.CONNECTIONS TO EXISTING SERVICES SHALL BE MADE SUCH THAT INTERRUPTION TIME WILL BE AS SHORT AS POSSIBLE. GIVE THE OWNERS REPRESENTATIVE A MINIMUM OF 72 HOURS NOTICE OF SUCH INTERRUPTIONS AND THE ACTUAL SHUT-DOWN TIME SHALL BE AT A TIME DESIGNATED BY THE OWNERS REPRESENTATIVE REMODEL & DEMOLITION NOTES & CO2 SENSOR ALL HVAC EQUIPMENT AND MATERIALS PROVIDED UNDER THIS PROJECT SHALL COMPLY WITH THE REQUIREMENTS OF THE BUY AMERICA ACT (41 U.S.C. §§ 8301–8305), AS APPLICABLE. MANUFACTURED PRODUCTS SHALL BE MANUFACTURED IN THE UNITED STATES, OR THE DOCUMENTATION ALLOWING ANY EXEMPTIONS TO THIS REQUIREMENT. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION CERTIFYING COMPLIANCE UPON REQUEST. BUILD AMERICA, BUY AMERICA ACT 1 THE BASE BID DOES NOT INCLUDE THE UPGRADES TO THE HVAC SYSTEM IN THE KITCHEN AREA SHOWN ON THE DRAWINGS AND SPECIFIED IN THE PROJECT MANUAL. IF THE OWNER CHOOSES TO ACCEPT THIS BID ALTERNATE, PROVIDE THE UPGRADES TO THE HVAC SYSTEM IN THE KITCHEN AREA AS SHOWN ON THE DRAWINGS AND SPECIFIED IN THE PROJECT MANUAL. BID ALTERNATE NO. 1: KITCHEN AREA HVAC UPGRADES 1 MECHANICAL LEGEND NOTES & SCHEDULES M-001 SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T CONSTRUCTION DOCUMENTS 02.27.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , & E X T E R I O R S I D I N G R E P L A C E M E N T DESIGN WEST ENGINEERING MECHANICAL ELECTRICAL ENERGY CONSULTANTS Edmonds, WA 98020 123 2nd Ave. S., Suite 220 Phone: 909.890.3700 Fax: 909.890.3770 Email: cadd@designwesteng.com CG/DS RH EW LM 25-149 R: \ _ P R O J E C T \ 2 0 2 5 \ 2 5 - 1 4 9 R E N T O N S E N I O R C E N T E R \ _ C A D \ 2 5 - 1 4 9 M - F R O N T - 20 2 6 - 0 2 - 2 6 - CO L I N G O U L E T ADDENDUM 31 MECHANICAL SHEET INDEX SHEET NUMBER SHEET TITLE M-001 MECHANICAL LEGEND NOTES & SCHEDULES M-002 MECHANICAL SCHEDULES M-003 MECHANICAL SCHEDULES M-004 MECHANICAL SCHEDULES M-005 MECHANICAL SCHEDULES M-100 MECHANICAL REFERENCE PLAN - UNDERSLAB MD-101 MECHANICAL DEMOLITION PLAN - FIRST FLOOR MD-102 MECHANICAL DEMOLITION PLAN - SECOND FLOOR MD-103 MECHANICAL DEMOLITION PLAN - ROOF M-201 MECHANICAL REMODEL PLAN - FIRST FLOOR M-202 MECHANICAL REMODEL PLAN - SECOND FLOOR M-203 MECHANICAL REMODEL PLAN - ROOF M-301 MECHANICAL REFRIGERANT PLAN - FIRST FLOOR M-302 MECHANICAL REFRIGERANT PLAN - SECOND FLOOR M-303 MECHANICAL ELEVATIONS DEMOLITION PLANS M-304 MECHANICAL ELEVATIONS REMODEL PLANS M-401 MECHANICAL DETAILS M-402 MECHANICAL DETAILS M-403 MECHANICAL CONTROLS DETAILS M-404 MECHANICAL CONTROLS DETAILS M-405 MECHANICAL CONTROLS DETAILS CG/DS RH 2/27/2026 MAKE-UP AIR UNIT SCHEDULE NEW UNIT NO.AREA SERVED LOCATION (EXISTING) MAKE/MODEL (NEW) MAKE / MODEL SUPPLY FAN WEIGHT (LBS)REMARKS FLOW (CFM) ESP (IN) MOTOR (HP) SPEED (RPM) VOLT/PHASE (V/Ø) MAU-1 KITCHEN HOOD KITCHEN 106 TRANE CABINET FAN T-6 GREENHECK 15-APM-4-80-I-15 2,450 0.5 1.5 1,804 208/3 120 SEE NOTES NOTES: 1. PROVIDE SOUNDLINED PLENUM AROUND MOTOR & DRIVE ASSEMBLY. 2. PROVIDE WITH INTERLOCK WITH OPERATION OF KITCHEN HOOD EXHAUST FAN EF-2. 3. PROVIDE WITH MOTOR STARTER FOR ALL FANS WITH MOTORS OVER 1 HP. 4. PROVIDE WITH 2-10VDC SIGNAL FOR CONTROL BY DDC AND INTERFACE CARD SUITABLE FOR INTEGRATION TO EMS SYSTEM. ELECTRICAL ROOF HOOD SCHEDULE EQUIP. NO LOCATION SERVICE MANUFACTURER / MODEL FLOW (CFM) SP (IN" WG) THROAT SIZE (INxIN) CURB CAP SIZE (INxIN) THROAT VELOCITY (FPM) OVERALL DIMENSIONS (LxWxH) WEIGHT (LBS) DAMPER TYPE REMARKS RH-1 ROOF RELIEF GREENHECK GRSR --12x12 16x16 -29x11.75 15 BARO.SEE NOTES RH-2 ROOF RELIEF GREENHECK FGR --36x24 42x30 -48x36x19 85 BARO.SEE NOTES REMARKS: 1. PROVIDE WITH MANUFACTURER'S BIRD SCREENS FOR HOOD OPENINGS, ROOF CURB, AND CORRESPONDING BACKDRAFT DAMPER MOUNTED IN THROAT. 2. CONTRACTOR TO CONFIRM SIZING OF ALL DIMENSIONS AND REQUIRED DUCTWORK CONNECTIONS BEFORE ORDERING. 1 SPLIT-SYSTEM SCHEDULE OUTDOOR UNIT TAG AREA SERVED LOCATION MANUFACTURER / MODEL REFRIGERANT PIPING NOMINAL COOLING CAPACITY (MBH) NOMINAL HEATING CAPACITY (MBH)HSPF2 COP AT 5 DEG F SEER2 ELECTRICAL PHYSICAL DATA REMARKSMAX PIPE LENGTH (FT) MAX HEIGHT DIFFERENCE (FT) LIQ. CONN. (IN) GAS CONN. (IN) REFRIGERANT MCA (AMPS) MOCP (AMPS) RECOMMENDED BREAKER SIZE (AMPS) V-PH-Hz DIMENSIONS (IN) L x W x H WEIGHT (LBS) HP-9 IT ROOM 214 ROOF TRANE PUZ-AK18NL 100 100 1/4 1/2 R-454B 18.0 23.6 8.9 2 19.5 16 27 20 208-1-60 34.5 x 12 x 25 110 - HP-10 COFFEE BAR ROOF TRANE PUZ-AH30NL 165 100 3/8 5/8 R-454B 30.4 34.4 9.2 2 19.7 22 37 25 208-1-60 37.5 x 14 x 37 165 - HP-11 ELEVATOR MACHINE ROOM ROOF TRANE PUZ-AK18NL 100 100 1/4 1/2 R-454B 18.0 23.6 8.9 2 19.5 16 27 20 208-1-60 34.5 x 12 x 25 110 - INDOOR UNIT TAG AREA SERVED LOCATION MANUFACTURER / MODEL INDOOR FAN ELECTRICAL WEIGHT (LBS)REMARKSFLOW (CFM) ESP (IN WC) FAN SPEED (RPM) MCA (AMPS) MOCP (AMPS)FAN MOTOR (W)V-PH-Hz FCU-9 IT ROOM 214 IT ROOM 214 TRANE PKA-AL18NL 450 N/A -N/A N/A 30 208-1-60 35 1, 2, 3, 4, 5, 6, 7, 8 FCU-10 COFFEE BAR COFFEE BAR TRANE PKA-AK30NL 775 N/A -N/A N/A 69 208-1-60 50 1, 2, 3, 4, 5, 6, 7, 8 FCU-11 ELEVATOR MACHINE ROOM ELEVATOR MACHINE ROOM TRANE PKA-AL18NL 450 N/A -N/A N/A 30 208-1-60 35 1, 2, 3, 4, 5, 6, 7, 8 NOTES: 1. PROVIDE WITH FACTORY MOTOR STARTERS. SEE ELECTRICAL DRAWINGS FOR SEPARATE DISCONNECT SWITCH. 2. PROVIDE ALL ASSOCIATED REFRIGERANT PIPING SIZED IN ACCORDANCE WITH MANUFACTURER'S LISTED RECOMMENDATIONS. INSULATE ALL REFRIGERANT PIPING AND PROVIDE WATERPROOF ALUMINUM JACKETING ON ALL EXTERIOR MOUNTED/ROUTED PIPING. 3. PROVIDE CONTROL/POWER WIRING AND REFRIGERANT PIPING FROM OUTDOOR UNIT TO INDOOR UNIT PER MANUFACTURES LISTED RECOMMENDATIONS. 4. PROVIDE WALL MOUNTED 7-DAY PROGRAMMABLE T-STAT. 5. MOUNT MIN. 7'-0" A.F.F. COORDINATE WITH ARCHITECT FINAL LOCATIONS. 6. STANDARD FILTER (BEST AVAILABLE). 7. PROVIDE CONDENSATE PUMP WHERE GRAVITY DRAINAGE IS NOT POSSIBLE. 8. CONDITIONS PER AHRI: 80 F DB / 67 F WB INDOOR COOLING; 96 F DB / 75 F WB COOLING OUTDOOR. HEAT PUMP SCHEDULE OUTDOOR UNIT TAG UNIT SERVED LOCATION MANUFACTURER / MODEL REFRIGERANT PIPING NOMINAL COOLING CAPACITY (MBH) NOMINAL HEATING CAPACITY (MBH)HSPF2 EER2 SEER2 ELECTRICAL PHYSICAL DATA REMARKSMAX PIPE LENGTH (FT) MAX HEIGHT DIFFERENCE (FT) LIQ. CONN. (IN) GAS CONN. (IN) REFRIGERANT MCA (AMPS) MOCP (AMPS) RECOMMENDED BREAKER SIZE (AMPS) V-PH-Hz DIMENSIONS (IN) L x W x H WEIGHT (LBS) HP-1 CC-1 ROOF TRANE PUZ-AK42NLHZ 245 100 3/8 5/8 R-454B 44.5 54.0 8.7 10.8 17.1 35 60 40 208-1-60 41.5 x 14 x 53.5 280 - HP-2 CC-2 ROOF TRANE PUZ-AH24NL 165 100 3/8 5/8 R-454B 24.0 31.4 8.7 12 17.8 22 37 25 208-1-60 37.5 x 14 x 37 165 - HP-3 CC-3 ROOF TRANE PUZ-AK36NL 165 100 3/8 5/8 R-454B 36.0 42.0 9.4 11.7 18.1 34 56 35 208-1-60 41.5 x 14 x 53 235 - HP-4 CC-4 ROOF TRANE PUZ-AK36NL 165 100 3/8 5/8 R-454B 36.0 42.0 9.4 11.7 18.1 34 56 35 208-1-60 41.5 x 14 x 53 235 - HP-5 CC-5 ROOF TRANE PUZ-AK36NL 165 100 3/8 5/8 R-454B 36.0 42.0 9.4 11.7 18.1 34 56 35 208-1-60 41.5 x 14 x 53 235 - HP-6 CC-6 ROOF TRANE PUZ-AK36NL 165 100 3/8 5/8 R-454B 36.0 42.0 9.4 11.7 18.1 34 56 35 208-1-60 41.5 x 14 x 53 235 - HP-7 CC-7 ROOF TRANE PUZ-AK36NL 165 100 3/8 5/8 R-454B 36.0 42.0 9.4 11.7 18.1 34 56 35 208-1-60 41.5 x 14 x 53 235 - HP-8 CC-8 ROOF TRANE PUZ-AH24NL 165 100 3/8 5/8 R-454B 24.0 31.4 8.7 12 17.8 22 37 25 208-1-60 37.5 x 14 x 37 165 - NOTES: 1. PROVIDE ALL ASSOCIATED REFRIGERANT PIPING SIZED IN ACCORDANCE WITH MANUFACTURER'S LISTED RECOMMENDATIONS. INSULATE ALL REFRIGERANT PIPING AND PROVIDE WATERPROOF ALUMINUM JACKETING ON ALL EXTERIOR MOUNTED/ROUTED PIPING. 2. PROVIDE CONTROL/POWER WIRING AND REFRIGERANT PIPING FROM OUTDOOR UNIT TO INDOOR UNIT PER MANUFACTURES LISTED RECOMMENDATIONS. 3. CONDITIONS PER AHRI: 80 F DB / 67 F WB INDOOR COOLING; 96 F DB / 75 F WB COOLING OUTDOOR. MECHANICAL SCHEDULES M-003 SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T CONSTRUCTION DOCUMENTS 02.27.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , & E X T E R I O R S I D I N G R E P L A C E M E N T DESIGN WEST ENGINEERING MECHANICAL ELECTRICAL ENERGY CONSULTANTS Edmonds, WA 98020 123 2nd Ave. S., Suite 220 Phone: 909.890.3700 Fax: 909.890.3770 Email: cadd@designwesteng.com CG/DS RH EW LM 25-149 R: \ _ P R O J E C T \ 2 0 2 5 \ 2 5 - 1 4 9 R E N T O N S E N I O R C E N T E R \ _ C A D \ 2 5 - 1 4 9 M - F R O N T - 20 2 6 - 0 2 - 2 6 - CO L I N G O U L E T ADDENDUM 31 CG/DS RH 2/27/2026 ELECTRIC DUCT HEATER SCHEDULE NEW UNIT NO.EXISTING UNIT NO.LOCATION ORIGINAL MAKE / MODEL NEW MANUFACTURER / MODEL CFM ELECTRIC HEATING ELECTRICAL DIMENSIONS WxHxD WEIGHT (LBS.)REMARKSCAPACITY (kW)STAGES FLA (A) VOLT / PHASE EDH-1 EDH-1 BANQUET HALL MECH. RM ELECTRODUCT BRASCH HUA 46.0 6 127.68 208/3 49x27 DUCT SEE NOTES EDH-2 EDH-2 MECH. ROOM 114 ELECTRODUCT BRASCH HUA 8.0 SCR 22.21 208/3 20x14 DUCT SEE NOTES EDH-3 EDH-3 MECH. ROOM 114 ELECTRODUCT BRASCH HUA 8.5 SCR 23.59 208/3 20x14 DUCT SEE NOTES EDH-4 EDH-4 MECH. ROOM 118 ELECTRODUCT BRASCH HUA 9.0 SCR 24.98 208/3 18x12 DUCT SEE NOTES EDH-5 EDH-5 MECH. ROOM 118 ELECTRODUCT BRASCH HUA 7.0 SCR 19.43 208/3 18x12 DUCT SEE NOTES EDH-6 EDH-6 MECH. ROOM 224 N/A BRASCH HUA 3.0 SCR 8.33 208/3 10x10 DUCT SEE NOTES EDH-7 EDH-7 MECH. ROOM 224 N/A BRASCH HUA 3.8 SCR 10.41 208/3 11x11 DUCT SEE NOTES EDH-8 EDH-8 MECH. ROOM 203 ELECTRODUCT BRASCH HUA 5.0 SCR 13.88 208/3 20x10 DUCT SEE NOTES EDH-9 EDH-9 KITCHEN 106 ELECTRODUCT BRASCH HUA 5.0 SCR 13.88 208/3 16x10 DUCT SEE NOTES NOTES: 1. HEATERS SHALL BE PROVIDED WITH FULL SCR CONTROLS, AIRFLOW INTERLOCK SWITCH, 24V CONTROL TRANSFORMER, DISCONNECT & DUCT MOUNTED THERMOSTAT. 2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING DUCT SIZES AT ALL DUCT HEATER LOCATIONS PRIOR TO ORDERING EQUIPMENT. 3. WHERE 4' MINIMUM DISTANCE FROM OUTLET OF AIR HANDLING UNIT FAN OR SHARP DUCT TRANSITION CANNOT BE ACHIEVED, THE HEATER SHALL BE CUSTOM DESIGNED BY THE MANUFACTURER TO ENSURE AREAS OF THE COILS THAT WILL EXPERIENCE LOWER THAN THE DESIGN AIRFLOW DO NOT OVERHEAT PAST SPECIFICATION. INDOOR AIR-HANDLING UNIT SCHEDULE NEW UNIT NO.AREA SERVED LOCATION (EXISTING) MAKE/MODEL (NEW) MAKE / MODEL MIN. OUTSIDE AIR FLOW (CFM) SUPPLY FAN ELECTRICAL WEIGHT (LBS)REMARKSFLOW (CFM) ESP (IN) MOTOR (HP) SPEED (RPM) VOLT/ PHASE (V/Ø) HV-1 BANQUET HALL 108 BANQUET HALL MECH. RM TRANE CABINET FAN T-10 GREENHECK 16-APM-4-100-I-20 4600 1.0 2.0 2,083 208/3 125 SEE NOTES HV-2 QUIET LOUNGE 111, CRAFTS 116, MEETING ROOM 213 MECH. RM 114 TRANE CABINET FAN T-8 GREENEHCK 16-APM-4-85-I-15 3130 0.75 1.5 1,770 208/3 125 SEE NOTES HV-3 FITNESS ROOM 117, COFFEE BAR 129, OFFICE 127, CONFERENCE 126, HEALTH/COUNSELING 123, FIRST FLOOR CORRIDOR, RECEPTION/ADMIN, LOBBY, NUTRITIONAL OFFICES 104 MECH. RM 118 TRANE CABINET FAN T-6 GREENEHECK 15-APM-4-100-I-15 2540 0.75 1.5 1,590 208/3 120 SEE NOTES HV-4 CRAFTS 219, CLASSROOMS 206 &207, FLOOR 2 CORRIDOR MECH. RM 224 TRANE CABINET FAN T-3 GREENHECK 16-APM-4-65-I-15 1310 0.75 1.5 1,141 208/3 125 SEE NOTES HV-5 GAMES ROOM 202 MECH. RM 203 TRANE CABINET FAN T-3 GREENEHCK 16-APM-4-55-I-15 900 0.5 1.5 1,217 208/3 145 SEE NOTES HV-6 KITCHEN 106 KITCHEN 106 ATTIC TRANE CABINET FAN T-3 GREENEHCK 16-APM-4-55-I-15 800 0.5 1.5 1,217 208/3 145 SEE NOTES NOTES: 1. PROVIDE SOUNDLINED PLENUM AROUND MOTOR & DRIVE ASSEMBLY. 2. PROVIDE WITH INTERNAL OUTSIDE AND RETURN AIR DAMPERS AT MIXING BOX WITH COMMON LINKAGE. 3. PROVIDE WITH FUSING PER STEP OF HEAT & 2-STEP DISCONNECTING MAGNETIC CONTACTORS. 4. PROVIDE WITH 2-10VDC SIGNAL FOR CONTROL BY DDC AND INTERFACE CARD SUITABLE FOR INTEGRATION TO CAMPUS-WIDE HONEYWELL WEBs-N4 OR NIAGARA4 EMS SYSTEM. 5. PROVIDE NEW MOTORIZED DAMPERS ON ALL OA DUCTS AND RETURN DUCTS SERVING HV UNITS. 1050 535 640 265 150 185 DX COIL SCHEDULE TAG UNIT SERVED SYSTEM SERVED LOCATION (EXISTING) MAKE/MODEL MANUFACTURER / MODEL COIL AIRFLOW (CFM)COIL SIZE L x H (IN.xIN.)TOTAL CAPACITY (MBH) EAT DB/WB (F°) LAT DB/WB (F°)COIL MAX. APD (IN WG)WEIGHT NOTES CC-1 HP-1 HV-2 MECH. ROOM 114 TRANE 2TWA3048A3000AA TRANE PAA-CA42NL 1800 21.5 x 32 47.6 86 63.7 0.3 85 SEE NOTES CC-2 HP-2 HV-4 MECH. ROOM 224 TRANE 4TWR4024E1000BB TRANE PAA-BA24NL 500 21.5 x 27.5 27.2 86 61.3 0.2 65 SEE NOTES CC-3 HP-3 HV-4 MECH. ROOM 224 TRANE 4TWR4024E1000BB TRANE PAA-BA24NL 810 21.5 x 27.5 27.2 86 61.3 0.2 65 SEE NOTES CC-4 HP-4 HV-5 MECH. ROOM 203 TRANE TWA030A300A0 TRANE PAA-CA36NL 900 21.5 x 32 40.8 86 60.4 0.2 80 SEE NOTES CC-5 HP-5 HV-2 MECH. ROOM 114 -TRANE PAA-CA36NL 1255 21.5 x 32 40.8 86 60.4 0.2 80 SEE NOTES CC-6 HP-6 HV-3 MECH. ROOM 118 -TRANE PAA-CA36NL 1340 21.5 x 32 40.8 86 60.4 0.2 80 SEE NOTES CC-7 HP-7 HV-3 MECH. ROOM 118 -TRANE PAA-CA36NL 1370 21.5 x 32 40.8 86 60.4 0.2 80 SEE NOTES CC-8 HP-8 HV-6 KITCHEN -TRANE PAA-BA24NL 835 21.5 x 27.5 27.2 86 61.3 0.2 65 SEE NOTES NOTES: 1. SEE SPLIT SYSTEM HEAT PUMP UNIT SCHEDULE FOR ADDITIONAL INFORMATION. 2. PROVIDE NEW TXV'S, DRAIN PAN, ISOLATION VALVES, LIQUID LINE FILTER DRIER, SUCTION LINE FILTER, EXPANSION VALVES, FROSTSTAT, MOISTURE AND LIQUID INDICATOR. 3. PROVIDE INSULATION AND ALUMINUM JACKETING ON ALL EXPOSED OUTDOOR REFRIGERANT PIPING. PROVIDE INSULATION ON INDOOR REFRIGERANT PIPING IN ACCORDANCE WITH CURRENT WSEC. 4. CONTRACTOR RESPONISBLE FOR FIELD ROUTING OF REFRIGERANT LINES PER MANUFACTURERS REQUIREMENTS. 5. CONTRACTOR SHALL FIELD COORDINATE EXACT SIZING AND DIMENSIONS OF COILS REQUIRED TO FIT WITHIN INSTALLATION SPACE RESTRICTIONS PRIOR TO ORDERING. ANY MODIFCATIONS NECESSARY SHALL BE COORDINATED WITH EQUIPMENT REPRESENTIVE AS TO ENSURE DESIGN REQUIREMENTS ARE STILL MET. 1 MECHANICAL SCHEDULES M-005 SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T CONSTRUCTION DOCUMENTS 02.27.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , & E X T E R I O R S I D I N G R E P L A C E M E N T DESIGN WEST ENGINEERING MECHANICAL ELECTRICAL ENERGY CONSULTANTS Edmonds, WA 98020 123 2nd Ave. S., Suite 220 Phone: 909.890.3700 Fax: 909.890.3770 Email: cadd@designwesteng.com CG/DS RH EW LM 25-149 R: \ _ P R O J E C T \ 2 0 2 5 \ 2 5 - 1 4 9 R E N T O N S E N I O R C E N T E R \ _ C A D \ 2 5 - 1 4 9 M - F R O N T - 20 2 6 - 0 2 - 2 6 - CO L I N G O U L E T ADDENDUM 31 CG/DS RH 2/27/2026 1 1 A A 5 5 6 6 7 7 10 10 11 11 12 12 13 13 14 14 15 15 16 16 20 20 21 21 22 22 23 23 24 24 B B C C D D E E F F G G J J L L Q Q SUNROOM COFFEE BAROFFICECONF. HEALTH/ COUNSELING CLOSETTLT. Room MEN'S RESTROOM WOMEN'S RESTROOM RISER ROOM JANITOR FITNESS ROOM CRAFTS ROOM SUPPLY ELECTRICAL STAIR ENTERTAINMENT ROOM ELEV. RM.ELEV. Room WORK AREA RECEPTION BANQUET HALL KITCHEN Room Room FRIDGE FREEZER COMP. PANTRY 30x12 SG 800 30x12 SG 800 30x12 SG 800 30x12 SG 800 48x24 RG 3200 4 1 2 1 3 3 3 (E) 24x16 SA (E) 23x12 EA UP (E) 23x12 RA STAINLESS STEEL WELDED DUCT W/ 1 HR ENCLOSURE ALL AROUND (E) 12x12 CD 400 CFM (E) 18x18 CLEANOUT PANELS (E) 9x9 RA STAINLESS STEEL WELDED DUCT 3 MAU-1HV-6 EF-7 MECH ROOM 114 SEE ELEVATION DETAIL ON SHEET M3-1 FOR SCOPE OF DEMOLITION MECH ROOM 118 SEE ELEVATION DETAIL ON SHEET M3-1 FOR SCOPE OF DEMOLITION EF 30x18 SUPPLY AND RETURN REFER TO SHEET M1-3 FOR CONTINUATION RETURN ABOVE SUPPLY DUCTWORK; HIGH UP ON WALL EF-8 EF-9 (ON WALL BELOW DUCTWORK; SERVES RTU-1) (E) 36x5 FLR REG 400 CFM (TYP OF 10) (E) 48x5 FLR REG 600 CFM (E) 12x2-1/2 FLR REG 50 CFM (E) 24x4 SA UP (ABV CLG) 210 CFM (TYP 2) (E) 24x4 FLR REG 200 CFM (E) 24x4 FLR REG 250 CFM (E) 18x4 FLR REG 150 CFM (E) 18x4 FLR REG 110 CFM (E) 24x4 FLR REG 200 CFM (TYP OF 4) (E) 18x4 FLR REG 140 CFM (E) 12x2-1/2 FLR REG 75 CFM (E) 12x2-1/2 FLR REG 50 CFM (E) 12x2-1/2 FLR REG 50 CFM (E) 18x4 SA UP (ABV CLG) 215 CFM (E) 18x4 FLR REG 140 CFM (E) 12x4 FLR REG 125 CFM (E) 6x4 SA (E) 24x4 SA UP (E) 24x4 SA UP (E) 10x7 SA RUN IN JOIST SPACE (E) KITCHEN RANGE HOOD (E) DISHWASHER HOOD (E) 11x11 SA (E) 20x10 SA UP(E) 20x10(E) 16x10 (E) 18x18 ACCESS PANEL IN CLG RUN BETWEEN JOIST 9x9 EA UP (E) 12x4 SA UP (E) 6x6 SA (E) 12x9 SA (E) 24x4 SA UP (ABV CLG) (E) 12x11 SA (E) 11x6 SA (E) 6x6 SA (E) 12x4 SA UP (E) 11x11 SA THRU JOIST DROP DROP HV-1 MECHANICAL CLOSET SEE ELEVATION DETAIL ON SHEET M3-1 FOR SCOPE OF DEMOLITION (E) 24x24 SA DN (E) 60x36 RR (E) 36x30 OA LOUVER (E) 12x10 OPEN DUCT ABV CLG (E) 18x6 RA (E) 18x10 RAR (E) 18x10 RAR (E) 10x10 RA (E) 20x10 RA (E) 8x6 ER 110 CFM (E) 10x8 RAR (E) 16x12 EA UP (E) 12x12 ER 250 CFM(E) 12x9 EA (E) 36x4 SA UP (E) 36x4 SA UP (E) 15x10 SA (E) 36x4 SA UP (E) 15x10 SA (E) 24x10 SA (E) 36x4 SA UP (E) 15x10 SA (E) 12x8 SA EF-6 (E) 10x3-1/4 EA TO DISCH LOVER (E) 10x3-1/4 EA TO DISCH LOVER (E) 6x6 CD 35 CFM (E) 10x3-1/4 EA TO DISCH LOVER (E) 18x10 OA LOUVER (E) 16x12 RR 400 CFM (E) 48x18 OA LOUVER (E) 30x30 OA LOUVER TO COMPRESSOR ROOM +12" (E) 18x4 FLR REG 140 CFM (E) 48x24 REL REG W/ DUCT IN BETWEEN TOP 1" BLW KIT CLG (E) 36x48 REL REG, & LOUVER +10'-0" (E) 12x12 RAR (E) 21-3/4x21-3/4 RAR (E) 30x7 RA (E) 24x6 REL OA LOUVER (E) 10x18 RAR 30x9 OA DUCT (E) 16x10 SA EDH-9 20"Ø BID ALTERNATE NO. 1: KITCHEN AREA HVAC UPGRADES ALL EQUIPMENT, DUCTWORK, ACCESSORIES, NEW WORK, ETC. NOTATED WITHIN THE KITCHEN OR FOR PURPOSES OF SERVING THE EQUIPMENT LOCATED WITHIN THE KITCHEN SHALL BE SERVICE UNDER AN ADD ALTERNATE BID. 1 1.ALL EQUIPMENT, PIPING, DUCTWORK, CONTROLS AND OR WIRING SHOWN IS A REPRESENTATION OF THE ACTUAL SYSTEMS AND IS NOT TO BE CONSIDERED AN AS-BUILT. ALL DIMENSIONS, LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF DEMOLITION OR NEW CONSTRUCTION. 2.UPON REMOVAL OF EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC., THE CONTRACTOR SHALL PATCH ANY EXISTING ROOF, WALL, FLOOR AND OR CEILING ASSEMBLIES. REFER TO ARCHITECTURAL DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION AND COORDINATION ITEMS. 3.PHOTO SHALL BE USED FOR REFERENCE AND CLARIFICATION PURPOSES ONLY. CONTRACTOR SHALL BE RESPONSIBLE FOR SITE VERIFICATION. 4.CONTRACTOR SHALL COORDINATE WITH OWNER ANY SHUTDOWN OF SERVICES, SUCH AS GAS AND WATER, PRIOR TO ANY WORK BEING PERFORMED. EXTENT OF SHUTDOWN SHALL BE COORDINATED WITH ARCHITECT, OWNER'S REP AND OCCUPANTS. 5.ALL MATERIALS REMOVED UNDER DEMOLITION PHASE SHALL BE DISPOSED OFF SITE. 6.COORDINATE LOCATION OF ALL GRILLES, REGISTERS AND OR DIFFUSERS WITH ARCHITECTURAL REFLECTED CEILING PLANS (RCP'S) AND INTERIOR DRAWINGS. 7.LOCATIONS OF THERMOSTATS, CO2 SENSORS AND CONTROLS SHALL BE LOCATED PER THE ARCHITECTURAL INTERIOR ELEVATION DRAWINGS. THERMOSTATS SHALL NOT BE LOCATED ON EXTERIOR WALLS UNLESS DIRECTED OTHERWISE. 8.PROVIDE REMOTE CABLE CONTOL SYSTEM, YOUNGS REGULATORS OR EQUAL, FOR ALL VOLUME DAMPERS LOCATED ABOVE HARD CEILINGS. PROVIDE ACCESS PANEL AND LOCATED CONTROLLER DIRECTLY ABOVE. MAXIMUM CABLE LENGTH FROM CONTROLLER TO DAMPER SHALL NOT EXCEED 15'-0". 9.SEE TYPICAL HVAC DETAILS, M4-1 SERIES DRAWINGS. 10.ALL SUPPLY AND RETURN DIFFUSERS TO BE BALANCED TO ORIGINAL AIRFLOW NOTED ON THE DEMO PLANS, UNO. REMOVE EXISTING CABINET FAN. EXISTING CONTROL WIRING SHALL BE SALVAGED FOR RE-USE. EXISTING INLET AND DISCHARGE DUCTWORK SHALL BE CAPPED AND LEFT IN PLACE FOR RE-USE. REMOVE EXISTING ELECTRIC DUCT HEATER. EXISTING CONTROL WIRING SHALL BE SALVAGED FOR RE-USE. EXISTING INLET AND DISCHARGE DUCTWORK SHALL BE CAPPED AND LEFT IN PLACE FOR RE-USE. REMOVE EXISTING WALL MOUNTED EXHAUST FAN. EXISTING CONTROL WIRING SHALL BE SALVAGED FOR RE-USE. EXISTING INLET AND DISCHARGE DUCTWORK SHALL BE LEFT IN PLACE FOR RE-USE. REMOVE EXISTING CEILING MOUNTED EXHAUST FAN. EXISTING CONTROL WIRING SHALL BE SALVAGED FOR RE-USE. EXISTING INLET AND DISCHARGE DUCTWORK SHALL BE LEFT IN PLACE FOR RE-USE. 1 2 3 4 MECHANICAL DEMOLITION PLAN - FIRST FLOOR MD-101 GENERAL NOTES DEMOLITION NOTES 1SCALE: 1/8" = 1'-0"MECHANICAL DEMOLITION PLAN - FIRST FLOOR SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T CONSTRUCTION DOCUMENTS 02.27.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , & E X T E R I O R S I D I N G R E P L A C E M E N T DESIGN WEST ENGINEERING MECHANICAL ELECTRICAL ENERGY CONSULTANTS Edmonds, WA 98020 123 2nd Ave. S., Suite 220 Phone: 909.890.3700 Fax: 909.890.3770 Email: cadd@designwesteng.com CG/DS RH 25-149 R: \ _ P R O J E C T \ 2 0 2 5 \ 2 5 - 1 4 9 R E N T O N S E N I O R C E N T E R \ _ C A D \ 2 5 - 1 4 9 M - F L O O R P L A N S - 20 2 6 - 0 2 - 2 6 - CO L I N G O U L E T ADDENDUM 31 CG/DS RH 2/27/2026 1 1 A A 5 5 6 6 7 7 10 10 11 11 12 12 13 13 14 14 15 15 16 16 20 20 21 21 22 22 23 23 24 24 B B C C D D E E F F G G J J L L Q Q SUNROOM COFFEE BAROFFICECONF.HEALTH/ COUNSELING CLOSETTLT. Room MEN'S RESTROOM WOMEN'S RESTROOM RISER ROOM JANITOR FITNESS ROOM CRAFTS ROOM SUPPLY ELECTRICAL STAIR ENTERTAINMENT ROOMELEV. RM.ELEV. Room WORK AREA RECEPTION BANQUET HALL KITCHEN Room Room FRIDGE FREEZER COMP. PANTRY 4 3 2 3 1 1 1 2 2 2 5 2 3 6 6 (E) 2-1/2" SD (E) 2" VTR (E) 2-1/2" SD (E) 2-1/2" SD (E) 2" VTR (E) 2" VTR (E) 1-1/2" VTR (E) 1-1/2" VTR (E) 2-1/2" SD (E) 2-1/2" SD EF-2 EF-1 HP-9 EF-3 RTU-1 RTU-3 RTU-230x18 SUPPLY AND RETURN; REFER TO SHEET M1-1 FOR CONTINUATION HP-4 10x10 DN TO CEILING DIFFUSER (TYP OF 4) HP-1 HP-3 HP-2 24x14 EXHAUST DN 9x9 EXHAUST DN (FORMERLY HP-1 AS LABELED ON-SITE) 16x16 SUPPLY REFER TO SHEET M1-2 FOR CONTINUATION RH-1 (TYP OF 11) RH-1 (TYP OF 4) 48x12 7 (TYP OF 5)10x10 (E) EXHAUST GOOSENECK (E) EXHAUST GOOSENECK 14 x 1 4 14 x 1 4 14x14 BID ALTERNATE NO. 1: KITCHEN AREA HVAC UPGRADES ALL EQUIPMENT, DUCTWORK, ACCESSORIES, NEW WORK, ETC. NOTATED WITHIN THE KITCHEN OR FOR PURPOSES OF SERVING THE EQUIPMENT LOCATED WITHIN THE KITCHEN SHALL BE SERVICE UNDER AN ADD ALTERNATE BID. 1 1.ALL EQUIPMENT, PIPING, DUCTWORK, CONTROLS AND OR WIRING SHOWN IS A REPRESENTATION OF THE ACTUAL SYSTEMS AND IS NOT TO BE CONSIDERED AN AS-BUILT. ALL DIMENSIONS, LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF DEMOLITION OR NEW CONSTRUCTION. 2.UPON REMOVAL OF EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC., THE CONTRACTOR SHALL PATCH ANY EXISTING ROOF, WALL, FLOOR AND OR CEILING ASSEMBLIES. REFER TO ARCHITECTURAL DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION AND COORDINATION ITEMS. 3.PHOTO SHALL BE USED FOR REFERENCE AND CLARIFICATION PURPOSES ONLY. CONTRACTOR SHALL BE RESPONSIBLE FOR SITE VERIFICATION. 4.CONTRACTOR SHALL COORDINATE WITH OWNER ANY SHUTDOWN OF SERVICES, SUCH AS GAS AND WATER, PRIOR TO ANY WORK BEING PERFORMED. EXTENT OF SHUTDOWN SHALL BE COORDINATED WITH ARCHITECT, OWNER'S REP AND OCCUPANTS. 5.ALL MATERIALS REMOVED UNDER DEMOLITION PHASE SHALL BE DISPOSED OFF SITE. 6.COORDINATE LOCATION OF ALL GRILLES, REGISTERS AND OR DIFFUSERS WITH ARCHITECTURAL REFLECTED CEILING PLANS (RCP'S) AND INTERIOR DRAWINGS. 7.LOCATIONS OF THERMOSTATS, CO2 SENSORS AND CONTROLS SHALL BE LOCATED PER THE ARCHITECTURAL INTERIOR ELEVATION DRAWINGS. THERMOSTATS SHALL NOT BE LOCATED ON EXTERIOR WALLS UNLESS DIRECTED OTHERWISE. 8.PROVIDE REMOTE CABLE CONTOL SYSTEM, YOUNGS REGULATORS OR EQUAL, FOR ALL VOLUME DAMPERS LOCATED ABOVE HARD CEILINGS. PROVIDE ACCESS PANEL AND LOCATED CONTROLLER DIRECTLY ABOVE. MAXIMUM CABLE LENGTH FROM CONTROLLER TO DAMPER SHALL NOT EXCEED 15'-0". 9.SEE TYPICAL HVAC DETAILS, M4-1 SERIES DRAWINGS. 10.ALL SUPPLY AND RETURN DIFFUSERS TO BE BALANCED TO ORIGINAL AIRFLOW NOTED ON THE DEMO PLANS, UNO. REMOVE EXISTING ROOF MOUNTED PACKAGED ROOFTOP UNIT AND EXISTING ROOF CURB. CONTROL WIRING SHALL BE LEFT IN PLACE FOR RE-USE. REMOVE EXISTING HEAT PUMP AND ALL ASSOCIATED REFRIGERANT. EXISTING UNIT MOUNT, CONTROL WIRING SHALL BE LEFT IN PLACE FOR RE-USE. REMOVE EXISTING ROOF MOUNTED EXHAUST FAN AND CORRESPONDING ROOF CURB. EXISTING CONTROL WIRING SHALL BE LEFT IN PLACE FOR RE-USE. DEMOLISH ALL SUPPLY AND RETURN DUCTWORK FROM RTU-1 ON THE ROOF. CAP ALL DUCTWORK AT ALL PENETRATION POINTS FOR NEW DUCTWORK CONNECTIONS AND REUSE. DEMOLISH ALL SUPPLY AND RETURN DUCTWORK FROM RTU-2 ON THE ROOF. CAP ALL DUCTWORK AT ALL PENETRATION POINTS FOR NEW DUCTWORK CONNECTIONS AND REUSE. REMOVE EXISTING ROOF MOUNTED RELIEF HOOD, CORRESPONDING ROOF CURB AND BACKDRAFT DAMPER. CONTRACTOR SHALL PROTECT ALL EXISTING ROOF OPENINGS AND OR PENETRATIONS EXPOSED TO OUTDOOR CONDITIONS AFTER DEMOLITION. DUCTWORK SHALL BE DEMOLISHED AT POINT OF PENETRATION INTO THE BUILDING; DUCTWORK TO BE CAPPED IN PLACE FOR REUSE. 1 2 3 4 5 6 7 MECHANICAL DEMOLITION PLAN - ROOF MD-103 GENERAL NOTES DEMOLITION NOTES 1SCALE: 1/8" = 1'-0"MECHANICAL DEMOLITION PLAN - ROOF SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T CONSTRUCTION DOCUMENTS 02.27.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , & E X T E R I O R S I D I N G R E P L A C E M E N T DESIGN WEST ENGINEERING MECHANICAL ELECTRICAL ENERGY CONSULTANTS Edmonds, WA 98020 123 2nd Ave. S., Suite 220 Phone: 909.890.3700 Fax: 909.890.3770 Email: cadd@designwesteng.com CG/DS RH 25-149 R: \ _ P R O J E C T \ 2 0 2 5 \ 2 5 - 1 4 9 R E N T O N S E N I O R C E N T E R \ _ C A D \ 2 5 - 1 4 9 M - F L O O R P L A N S - 20 2 6 - 0 2 - 2 6 - CO L I N G O U L E T ADDENDUM 31 CG/DS RH 2/27/2026 SUNROOM COFFEE BAROFFICECONF.HEALTH/ COUNSELING CLOSETTLT. Room MEN'S RESTROOM WOMEN'S RESTROOM RISER ROOM JANITOR FITNESS ROOM CRAFTS ROOM SUPPLY ELECTRICAL STAIR ENTERTAINMENT ROOMELEV. RM.ELEV. Room WORK AREA RECEPTION BANQUET HALL KITCHEN Room Room FRIDGE FREEZER COMP. PANTRY 1 1 A A 5 5 6 6 7 7 10 10 11 11 12 12 13 13 14 14 15 15 16 16 20 20 21 21 22 22 23 23 24 24 B B C C D D E E F F G G J J L L Q Q SUNROOM COFFEE BAROFFICECONF. HEALTH/ COUNSELING CLOSETTLT. Room MEN'S RESTROOM WOMEN'S RESTROOM RISER ROOM JANITOR FITNESS ROOM CRAFTS ROOM SUPPLY ELECTRICAL STAIR ENTERTAINMENT ROOM ELEV. RM.ELEV. Room WORK AREA RECEPTION BANQUET HALL KITCHEN Room Room FRIDGE FREEZER COMP. PANTRY 30x12 SG 800 30x12 SG 800 48x24 RG 3200 14x14 CR 450 1 10x10 CD 155 10x10 CR 155 12x8 SG 150 12x8 RG 150 12x12 CR 200 12x12 CD 200 6x6 CR 35 6x6 CR 30 8x6 RG 30 8x6 SG 306x6 CD 30 6x6 CD 35 12x12 CR 75 12x8 RG 70 12x8 SG 70 12x12 CD 75 10x10 CD 120 10x10 CR 12030x12 SG 800 30x12 SG 800 12x12 CD 185 12x12 CR 185 PROVIDE DUCTWORK EXTENSIONS TO REPOSITION FLOOR REGISTERS TO BE LOCATED ON THE TOP BACKSIDE OF BUILT UP SEATING; DIFFUSERS SHALL BE ANGLED TO PROVIDE WINDOW WASHING 30x18 SUPPLY AND RETURN REFER TO SHEET M2-3 FOR CONTINUATION (ON WALL BELOW DUCTWORK; SERVES RTU-1) RETURN ABOVE SUPPLY DUCTWORK; HIGH UP ON WALL MAU-1 HV-6 EF-7 FCU-10 FCU-11 ERV-5 ERV-2 ERV-4 8"Ø 8"Ø 8x8 WL 12x12 WL ERV-1 32x8 WL 8"Ø 10x10 WL 8"Ø 8x8 WL 4"Ø 4"Ø ERV-3 10x10 WL 8x8 WL 8"Ø 8x8 WL 10x10 WL10' CLEARANCE TO BE MAINTAINED 18x8 WL ERV-6 EDH-9 10x8 WL 12x12 WL (MOUNT HIGH ON WALL)EDH-4, CC-6 EDH-5, CC-7 EDH-2, CC-5 EDH-9, CC-8 CC-8 EF-8 EF-9 HV-1 MECHANICAL CLOSET SEE ELEVATION DETAIL ON SHEET M3-2 FOR SCOPE OF NEW WORK MECH ROOM 114 SEE ELEVATION DETAIL ON SHEET M3-2 FOR SCOPE OF NEW WORK MECH ROOM 118 SEE ELEVATION DETAIL ON SHEET M3-2 FOR SCOPE OF NEW 2 2 2 2 2 13/16" 3 3 8"Ø 8"Ø 8"Ø 8"Ø 6" Ø 6"Ø 6"Ø 6"Ø 8"Ø 8"Ø 8"Ø 4" Ø 6"Ø 8" Ø 6"Ø 4"Ø 8"Ø 4"Ø 10 " Ø 10 " Ø 8" Ø 8"Ø 8"Ø 10"Ø 10"Ø 8"Ø 8"Ø 12x10 20"Ø 8"Ø 8"Ø 8"Ø BID ALTERNATE NO. 1: KITCHEN AREA HVAC UPGRADES ALL EQUIPMENT, DUCTWORK, ACCESSORIES, NEW WORK, ETC. NOTATED WITHIN THE KITCHEN OR FOR PURPOSES OF SERVING THE EQUIPMENT LOCATED WITHIN THE KITCHEN SHALL BE SERVICE UNDER AN ADD ALTERNATE BID. 1 M BDD BDD BD D M BDD BDD BD D BD D BD D BD D BD D 1 1 1 1 1 1 1 1 1 1 1.COORDINATE LOCATION OF ALL GRILLES, REGISTERS AND OR DIFFUSERS WITH ARCHITECTURAL REFLECTED CEILING PLANS (RCP'S) AND INTERIOR DRAWINGS. 2.LOCATIONS OF THERMOSTATS, CO2 SENSORS AND CONTROLS SHALL BE LOCATED PER THE ARCHITECTURAL INTERIOR ELEVATION DRAWINGS. THERMOSTATS SHALL NOT BE LOCATED ON EXTERIOR WALLS UNLESS DIRECTED OTHERWISE. 3.PROVIDE REMOTE CABLE CONTOL SYSTEM, YOUNGS REGULATORS OR EQUAL, FOR ALL VOLUME DAMPERS LOCATED ABOVE HARD CEILINGS. PROVIDE ACCESS PANEL AND LOCATED CONTROLLER DIRECTLY ABOVE. MAXIMUM CABLE LENGTH FROM CONTROLLER TO DAMPER SHALL NOT EXCEED 15'-0". 4.SEE TYPICAL HVAC DETAILS, M4.1 SERIES DRAWINGS. 5.ALL EQUIPMENT, AND OR PIPING SHOWN IS A REPRESENTATION OF THE ACTUAL SYSTEMS AND IS NOT TO BE CONSIDERED AN AS-BUILT. ALL DIMENSIONS, LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF DEMOLITION OR NEW CONSTRUCTION. 6.ALL SUPPLY AND RETURN DIFFUSERS TO BE BALANCED TO ORIGINAL AIRFLOW NOTED ON THE DEMO PLANS, UNO. 1 PROVIDE NEW 12x10 DUCTWORK TO NEW CEILING RETURN DIFFUSER. DUCTWORK SHALL CONNECT TO EXISTING PLENUM RETURN ABOVE CEILING. CONNECT NEW EQUIPMENT TO (E) IN PLACE DUCTWORK. PROVIDE NEW TRANSITIONS AND FLEXIBLE CONNECTIONS AS REQUIRED FOR PROPER AND COMPLETE INSTALLATION. PROVIDE NEW CONTROL WIRING TO NEW BMS CONTROL SYSTEMS. PROVIDE NEW CONTROL WIRING TO NEW BMS CONTROL SYSTEMS. 2 3 MECHANICAL REMODEL PLAN - FIRST FLOOR M-201 GENERAL NOTES CONSTRUCTION NOTES 1SCALE: 1/8" = 1'-0"MECHANICAL REMODEL PLAN - FIRST FLOOR SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T CONSTRUCTION DOCUMENTS 02.27.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , & E X T E R I O R S I D I N G R E P L A C E M E N T DESIGN WEST ENGINEERING MECHANICAL ELECTRICAL ENERGY CONSULTANTS Edmonds, WA 98020 123 2nd Ave. S., Suite 220 Phone: 909.890.3700 Fax: 909.890.3770 Email: cadd@designwesteng.com CG/DS RH 25-149 R: \ _ P R O J E C T \ 2 0 2 5 \ 2 5 - 1 4 9 R E N T O N S E N I O R C E N T E R \ _ C A D \ 2 5 - 1 4 9 M - F L O O R P L A N S - 20 2 6 - 0 2 - 2 6 - CO L I N G O U L E T ADDENDUM 31 CG/DS RH 2/27/2026 1 1 A A 5 5 6 6 7 7 10 10 11 11 12 12 13 13 14 14 15 15 16 16 20 20 21 21 22 22 23 23 24 24 B B C C D D E E F F G G J J L L Q Q 1 2 3 1'-6" 4 EF-2 EF-1 HP-9 EF-3 RTU-1 RTU-2 30x18 SUPPLY AND RETURN; REFER TO SHEET M2-1 FOR CONTINUATION HP-4 HP-3 HP-2 24x14 EXHAUST DN 9x9 EXHAUST DN RH-1 (TYP OF 11) HP-10 HP-5 HP-6 HP-7 HP-8 RH-2 (TYP OF 4) 16x16 SUPPLY REFER TO SHEET M2-2 FOR CONTINUATION 10x10 SUPPLY DN TO CEILING DIFFUSER REFER TO SHEET M2-2 FOR CONTINUATION (TYP OF 4) 10x8 10x8 HP-1 16x16 RETURN DN REFER TO SHEET M2-2 FOR CONTINUATION HP-11 5 6 (TYP OF 4) 16x16 18x12 12x12 30x24 14x14 16 x 1 6 30x24 7 (TYP OF 11 HP'S) BID ALTERNATE NO. 1: KITCHEN AREA HVAC UPGRADES ALL EQUIPMENT, DUCTWORK, ACCESSORIES, NEW WORK, ETC. NOTATED WITHIN THE KITCHEN OR FOR PURPOSES OF SERVING THE EQUIPMENT LOCATED WITHIN THE KITCHEN SHALL BE SERVICE UNDER AN ADD ALTERNATE BID. 1 1.COORDINATE LOCATION OF ALL GRILLES, REGISTERS AND OR DIFFUSERS WITH ARCHITECTURAL REFLECTED CEILING PLANS (RCP'S) AND INTERIOR DRAWINGS. 2.LOCATIONS OF THERMOSTATS, CO2 SENSORS AND CONTROLS SHALL BE LOCATED PER THE ARCHITECTURAL INTERIOR ELEVATION DRAWINGS. THERMOSTATS SHALL NOT BE LOCATED ON EXTERIOR WALLS UNLESS DIRECTED OTHERWISE. 3.PROVIDE REMOTE CABLE CONTOL SYSTEM, YOUNGS REGULATORS OR EQUAL, FOR ALL VOLUME DAMPERS LOCATED ABOVE HARD CEILINGS. PROVIDE ACCESS PANEL AND LOCATED CONTROLLER DIRECTLY ABOVE. MAXIMUM CABLE LENGTH FROM CONTROLLER TO DAMPER SHALL NOT EXCEED 15'-0". 4.SEE TYPICAL HVAC DETAILS, M4.1 SERIES DRAWINGS. 5.ALL EQUIPMENT, AND OR PIPING SHOWN IS A REPRESENTATION OF THE ACTUAL SYSTEMS AND IS NOT TO BE CONSIDERED AN AS-BUILT. ALL DIMENSIONS, LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF DEMOLITION OR NEW CONSTRUCTION. 6.ALL SUPPLY AND RETURN DIFFUSERS TO BE BALANCED TO ORIGINAL AIRFLOW NOTED ON THE DEMO PLANS, UNO. 1 CONNECT NEW 30x18 SUPPLY AND RETURN DUCTWORK TO EXISTING AT PENETRATION POINT INTO BUILDING. CONNECT NEW 16x16 SUPPLY DUCTWORK TO EXISTING AT PENETRATION POINT INTO BUILDING. CONNECT NEW 16x16 RETURN DUCTWORK TO EXISTING AT PENETRATION POINT INTO BUILDING. MAINTAIN MINIMUM 18" CLEARANCE FOR MAINTENANCE ACCESS TO MECH EQUIPMENT. CONNECT NEW 24x14 SUPPLY DUCTWORK TO EXISTING AT PENETRATION POINT INTO BUILDING. CONNECT NEW 10x10 SUPPLY DUCTWORK TO EXISTING AT PENETRATION POINT INTO BUILDING. REFRIGERANT PIPING PENETRATION. ALL REFRIGERANT PIPING SHALL BE INSULATED. PROVIDE WEATHERPROOF ALUMINUM JACKETING, IN ADDITION TO INSULATION, ON ALL EXTERIOR MOUNTED REFRIGERANT PIPING. 2 3 4 5 6 7 MECHANICAL REMODEL PLAN - ROOF M-203 GENERAL NOTES CONSTRUCTION NOTES 1SCALE: 1/8" = 1'-0"MECHANICAL REMODEL PLAN - ROOF SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T CONSTRUCTION DOCUMENTS 02.27.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , & E X T E R I O R S I D I N G R E P L A C E M E N T DESIGN WEST ENGINEERING MECHANICAL ELECTRICAL ENERGY CONSULTANTS Edmonds, WA 98020 123 2nd Ave. S., Suite 220 Phone: 909.890.3700 Fax: 909.890.3770 Email: cadd@designwesteng.com CG/DS RH 25-149 R: \ _ P R O J E C T \ 2 0 2 5 \ 2 5 - 1 4 9 R E N T O N S E N I O R C E N T E R \ _ C A D \ 2 5 - 1 4 9 M - F L O O R P L A N S - 20 2 6 - 0 2 - 2 6 - CO L I N G O U L E T ADDENDUM 31 CG/DS RH 2/27/2026 CONSTRUCTION NOTES GENERAL NOTES 2PANEL SCHEDULES CONSTRUCTION NOTES GENERAL NOTES 1600A UGPS EXISTING SERVICE GROUND EXISTING INCOMING POWER UTILITY SERVICE 1 2 3 4 (E) 400A 3P G N EXISTING PANEL K1 5 (E) 400A 3P (E) 400AS 3P (E) 200A 3P (E) 200A 3P (E) MAIN SWITCHBOARD 'MS' 1600A 208Y/120V 3Ø 4W EXISTING NEW PANEL M EXISTING ELEVATOR EXISTING EXISTING WATER HEATERS EXISTING 6 (E) 400A 3P EXISTING EXISTING PANEL D EXISTING PANEL P EXISTING 1SINGLE LINE DIAGRAM EXISTING PANEL K2 EXISTING 1.REFER TO 'GENERAL NOTES' ON ELECTRICAL LEGENDS AND NOTES SHEET FOR WIRING METHODS, MATERIALS, AND REQUIREMENTS. 2.ALL NEW CIRCUIT BREAKERS SHALL BE OF THE SAME MANUFACTURER. 3.CONTRACTOR SHALL UPDATE ALL MODIFIED PANEL DIRECTORIES OR CREATE A NEW TYPED DIRECTORY, IF ONE DOES NOT EXIST, IDENTIFYING EACH CIRCUIT AND INSTALLED CIRCUIT LOADS, MOUNTED IN GLASS OR PLASTIC INSIDE DOOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR UPDATING DIRECTORIES TO INDICATE ALL NEW CIRCUITS AND ACTUAL AREA SERVED WHICH IS NOT NECESSARILY THE DESCRIPTION INDICATED ON THE BID DOCUMENTS. USE A COMPUTER OR TYPEWRITER TO CREATE DIRECTORY; HANDWRITTEN DIRECTORIES ARE NOT ACCEPTABLE. 4.AVAILABLE FAULT AT SERVICE POINT SHALL BE CONSIDERED AT 42,000 RMS SYM. 3LOAD SUMMARY 1 PROVIDE NEW CIRCUIT BREAKER IN EXISTING DISTRIBUTION PANEL BOARD. TYPE TO MATCH EXISTING. AIC RATING TO BE GREATER THAN AVAILABLE FAULT CURRENT. UPDATE PANELBOARD DIRECTORY PER GENERAL NOTE REQUIREMENTS. REUSE EXISTING SWITCH FEEDING REMOVED DUCT HEATER FOR NEW PANEL M2 FEED. PROVIDE NEW 400A FUSES IN EXISTING FEDERAL PACIFIC QMCB SWITCH; TYPE AND AIC RATING OF FUSE TO MATCH EXISTING AND SHALL BE COMPATIBLE WITH EXISTING SWITCH. REPLACE EXISTING PANELBOARD WITH NEW 400A PANEL. EXISTING PANEL L2 EXISTING 1 1 1 EXISTING PANEL P-2 EXISTING 1 AF C : AI C : PANEL M2 29 , 8 2 0 42 , 0 0 0 L= V.D.= 30' 0.31% 400-Y 20-Y SETSTYPELABEL PHASE GROUND CONDUIT 1 3 # 12 3/4" 30-Y 1 3 # 10 3/4" 1 3 # 8 1" 1 3 # 6 1 3 # 6 1 3 # 4 1 3 # 3 1 3 # 2 1 3 # 1 1 3 # 1 1 1 1 1 1 1 3 # 250 KCM 1 2 2 40-Y 50-Y 60-Y 70-Y 80-Y 90-Y 100-Y 125-Y 150-Y 175-Y 200-Y 225-Y 250-Y 300-Y 350-Y 400-Y 450-Y 500-Y 600-Y 700-Y 800-Y 1000-Y 1200-Y 1600-Y 2000-Y 2500-Y 3000-Y 4000-Y 1600A-4W 4000A-4W 1000A-4W 700A-4W 600A-4W 500A-4W 450A-4W 20A-4W 3000A-4W 2000A-4W 2500A-4W 800A-4W 1200A-4W 400A-4W 350A-4W 300A-4W 250A-4W 225A-4W 200A-4W 175A-4W 150A-4W 125A-4W 100A-4W 80A-4W 60A-4W 50A-4W 30A-4W 40A-4W 70A-4W 90A-4W 2 2 2 3 3 3 4 5 6 8 10 3 # 1/0 3 # 2/0 3 # 3/0 3 # 4/0 3 # 350 KCM 3 # 500 KCM 3 # 250 KCM 3 # 350 KCM 3 # 500 KCM 3 # 300 KCM 3 # 500 KCM 3 # 600 KCM 3 # 600 KCM 3 # 600 KCM 3 # 600 KCM 3 # 600 KCM 3 # 600 KCM 3 # 4/0 1" 1" 1" 1-1/4" 1-1/4" 1-1/2" 1-1/2" 2" 1 # 4/0 1#500KCM 1 # 2/0 1 # 1/0 1 # 1/0 1 # 2 1 # 2 1 # 12 1#500KCM 1#250KCM 1#350KCM 1 # 1/0 1 # 3/0 1 # 2 1 # 2 1 # 4 1 # 4 1 # 4 1 # 6 1 # 6 1 # 6 1 # 6 1 # 8 1 # 8 1 # 10 1 # 10 1 # 10 1 # 10 1 # 8 1 # 8 4" 4" 4" 4" 4" 3" 3" 4" 4" 4" 3" 4" 4" 3" 2 1/2" 2 1/2" 2" 2" NEUTRAL 1 # 12 1 # 10 1 # 10 1 # 6 1 # 6 1 # 4 1 # 3 1 # 2 1 # 1 1 # 1 1 # 250 KCM 1 # 1/0 1 # 2/0 1 # 3/0 1 # 4/0 1 # 350 KCM 1 # 500 KCM 1 # 4/0 1 # 250 KCM 1 # 350 KCM 1 # 500 KCM 1 # 300 KCM 1 # 500 KCM 1 # 600 KCM 1 # 600 KCM 1 # 600 KCM 1 # 600 KCM 1 # 600 KCM 1 # 600 KCM 600V FEEDER SCHEDULE 3Ø 4W NOTE: ALL CONDUCTOR SIZES ARE BASED ON TYPE THHN COPPER CONDUCTOR UNLESS OTHERWISE NOTED. THE AMPACITY OF CONDUCTORS SHALL BE BASED ON THE TERMINALS NOT TO EXCEED 60°C FOR CONDUCTOR SIZE #14 THROUGH #1 AWG OR 75°C FOR CONDUCTOR SIZE OVER #1 AWG AS PER NEC 110.14(C). 3"3 # 3/0 1 # 3/0 4FEEDER SCHEDULE 2 2 3 3 EXISTING 1 SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T CONSTRUCTION DOCUMENTS 02.27.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , & E X T E R I O R S I D I N G R E P L A C E M E N T DESIGN WEST ENGINEERING MECHANICAL ELECTRICAL ENERGY CONSULTANTS Edmonds, WA 98020 123 2nd Ave. S., Suite 220 Phone: 909.890.3700 Fax: 909.890.3770 Email: cadd@designwesteng.com EW LM 25-149 R: \ _ P R O J E C T \ 2 0 2 5 \ 2 5 - 1 4 9 R E N T O N S E N I O R C E N T E R \ _ C A D \ 2 5 - 1 4 9 E - S L D - 20 2 6 - 0 2 - 2 7 - HA N D R A E H E N T H O R N ADDENDUM 31 SINGLE LINE DIAGRAM AND PANEL SCHEDULES E-002 1 1 1 1 SIGNED:02/27/2026 SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T CONSTRUCTION DOCUMENTS 02.27.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , & E X T E R I O R S I D I N G R E P L A C E M E N T DESIGN WEST ENGINEERING MECHANICAL ELECTRICAL ENERGY CONSULTANTS Edmonds, WA 98020 123 2nd Ave. S., Suite 220 Phone: 909.890.3700 Fax: 909.890.3770 Email: cadd@designwesteng.com EW LM 25-149 R: \ _ P R O J E C T \ 2 0 2 5 \ 2 5 - 1 4 9 R E N T O N S E N I O R C E N T E R \ _ C A D \ 2 5 - 1 4 9 E - S L D - 20 2 6 - 0 2 - 2 7 - HA N D R A E H E N T H O R N ADDENDUM 31 PANEL SCHEDULES E-003 1 1 1 1 1 1 1 1 SIGNED:02/27/2026 (R) HV-6 (R) MAU-1 (R) EF-7 (R) EDH-9 (R) HV-1 (R) EDH-1 (R) HV-2 (R) EDH-3 (R) EDH-2 (R) HV-3 (R) EDH-5 (R) EDH-4 (R) PNL 'M' (E) PNL 'P' (E) PNL 'D' (E) PNL 'L' (E) PNL 'X' (E) PNL 'L' (E) PNL 'L2' 1 2 3 4 (R) M-7,9,11 (R) M-2,4,6 (R) M-13,15,17 (R) M-14,16,18 (R) M-20,22,24 (R) M-1,3,5 (R) MS-3 (R) M-25,27,29 (R) M-23 (R) K2-20,22,24 (R) K2-21 (R) EF-X5 (E) PNL 'K1' (E) PNL 'K2' (BELOW) SUNROOM COFFEE BAROFFICECONF. HEALTH/ COUNSELING CLOSETTLT. Room MEN'S RESTROOM WOMEN'S RESTROOM RISER ROOM JANITOR FITNESS ROOM CRAFTS ROOM SUPPLY ELECTRICAL STAIR ENTERTAINMENT ROOM ELEV. RM.ELEV. Room WORK AREA RECEPTION BANQUET HALL KITCHEN Room Room FRIDGE FREEZER COMP. PANTRY (R) EF-8 (R) EF-9 (R) EF-6 (R) P-31 7 6 6 (R) M-8,10,12 (E) MAIN SWITCHBOARD 'MS' 8 EXISTING LIGHT FIXTURE, CAMERA, CONDUIT OR ELECTRICAL DEVICE TO BE REMOVED FOR NEW SIDEING AND REINSTALLED, TYP. 1.REFER TO ELECTRICAL LEGENDS AND NOTES SHEET FOR ADDITIONAL DEMOLITION NOTES. 2.CONTRACTOR IS TO USE EXTREME CAUTION WHEN STARTING THE DEMOLITION WORK, THERE ARE MULTIPLE SERVICES FEEDING THIS WORK AREA. CONTRACTOR SHALL MAKE THEIR DUE DILIGENCE IN SOURCE TRACING ALL EXISTING EQUIPMENT, DISCONNECTS AND CIRCUITS ENTERING AND LEAVING THIS AREA. CONTRACTOR SHALL LABEL ALL CONDUITS WITH THEIR SOURCE LOCATION IF CONDUITS ARE TO REMAIN. ANY CIRCUITS BEING REMOVED SHALL HAVE ITS SOURCE CORRECTLY LABELED AS 'SPARE' AND SAFE-OFF CIRCUIT BREAKER. ANY CIRCUITS THAT REMAIN ARE TO BE REDLINED AND ADDED TO AS-BUILTS. 3.CONTRACTOR SHALL TEMPORARILY REMOVE ALL EXTERIOR LIGHT FIXTURES, RECEPTACLES, CAMERAS, CONDUIT, ETC. FOR REMOVAL AND INSTALLATION OF NEW SIDING AND ROOF MATERIALS. SALVAGE AND REINSTALL ALL REUSABLE DEVICES AND EQUIPMENT IN THEIR ORIGINAL LOCATIONS UPON COMPLETION OF THE NEW SIDING INSTALLATION. ALL ELECTRICAL CIRCUITS SHALL BE SAFED OFF DURING CONSTRUCTION. 1 EXISTING CABINET FAN IS TO BE DEMOLISHED. REMOVED EXISTING DISCONNECT, CONDUIT AND WIRING BACK TO SOURCE. EXISTING DUCT HEATER IS TO BE DEMOLISHED. REMOVED EXISTING DISCONNECT, CONDUIT AND WIRING BACK TO SOURCE. EXISTING MAKE UP AIR UNIT IS TO BE DEMOLISHED. REMOVED EXISTING DISCONNECT, CONDUIT AND WIRING BACK TO SOURCE. EXISTING WALL MOUNTED EXHAUST FAN IS TO BE DEMOLISHED. REMOVED EXISTING DISCONNECT, CONDUIT AND WIRING BACK TO SOURCE. EXISTING CEILING MOUNTED EXHAUST FAN IS TO BE DEMOLISHED. REMOVED EXISTING DISCONNECT, CONDUIT AND WIRING BACK TO SOURCE. EXISTING CEILING MOUNTED EXHAUST FAN IS TO BE DEMOLISHED. REMOVED EXISTING DISCONNECT, PRESERVE AND PROTECT EXISTING CONDUIT AND WIRING AND PREPARE RECONNECTION TO NEW EXHAUST FAN. EXISTING CEILING MOUNTED EXHAUST FAN IS TO BE DEMOLISHED. REMOVED EXISTING DISCONNECT,CONDUIT AND WIRING BACK TO NEXT DEVICE IN SERVICE. EXISTING PANELBOARD TO BE DEMOLISHED AND REPLACED WITH NEW PANELBOARD. SALVAGE EXISTING FEEDER AND BRANCH CIRCUIT CONDUCTORS AND CONDUIT FOR REUSE. 2 3 4 5 6 7 8 SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T CONSTRUCTION DOCUMENTS 02.27.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , & E X T E R I O R S I D I N G R E P L A C E M E N T DESIGN WEST ENGINEERING MECHANICAL ELECTRICAL ENERGY CONSULTANTS Edmonds, WA 98020 123 2nd Ave. S., Suite 220 Phone: 909.890.3700 Fax: 909.890.3770 Email: cadd@designwesteng.com EW LM 25-149 R: \ _ P R O J E C T \ 2 0 2 5 \ 2 5 - 1 4 9 R E N T O N S E N I O R C E N T E R \ _ C A D \ 2 5 - 1 4 9 E - 1 S P W R P L N - 20 2 6 - 0 2 - 2 7 - HA N D R A E H E N T H O R N ADDENDUM 31 GENERAL NOTES 1ELECTRICAL DEMOLITION PLAN - FIRST FLOOR SCALE: 1/8" = 1'-0" DEMOLITION NOTES ELECTRICAL DEMOLITION PLAN - FIRST FLOOR ED-101 1 1 1 1 1 1 1 SIGNED:02/27/2026 1 1 A A 5 5 6 6 7 7 10 10 11 11 12 12 13 13 14 14 15 15 16 16 20 20 21 21 22 22 23 23 24 24 B B C C D D E E F F G G J J L L Q Q (R) HV-5 (R) EDH-8 (R) EF-4 (R) EF-5 (R) FCU-1 (R) HV-4 (R)EDH-6 (R)EDH-7 (E) PNL 'P-2' (R) M-38,40,42 (R) M-21 (R)M-19 (R)M-26,28,30 (R)M-32,34,36 (R) L2-9 (R) L2-9 (R) BILLIARD ROOM GAME ROOM GAME ROOM ELEV. MEN'S RESTROOM WOMEN'S RESTROOM CLASSROOM TLT. TLT. ASSEMBLY ROOM BALCONY BALCONY 1 1 2 1.REFER TO ELECTRICAL LEGENDS AND NOTES SHEET FOR ADDITIONAL DEMOLITION NOTES. 2.CONTRACTOR IS TO USE EXTREME CAUTION WHEN STARTING THE DEMOLITION WORK, THERE ARE MULTIPLE SERVICES FEEDING THIS WORK AREA. CONTRACTOR SHALL MAKE THEIR DUE DILIGENCE IN SOURCE TRACING ALL EXISTING EQUIPMENT, DISCONNECTS AND CIRCUITS ENTERING AND LEAVING THIS AREA. CONTRACTOR SHALL LABEL ALL CONDUITS WITH THEIR SOURCE LOCATION IF CONDUITS ARE TO REMAIN. ANY CIRCUITS BEING REMOVED SHALL HAVE ITS SOURCE CORRECTLY LABELED AS 'SPARE' AND SAFE-OFF CIRCUIT BREAKER. ANY CIRCUITS THAT REMAIN ARE TO BE REDLINED AND ADDED TO AS-BUILTS. 3.CONTRACTOR SHALL TEMPORARILY REMOVE ALL EXTERIOR LIGHT FIXTURES, RECEPTACLES, CAMERAS, CONDUIT, ETC. FOR REMOVAL AND INSTALLATION OF NEW SIDING AND ROOF MATERIALS. SALVAGE AND REINSTALL ALL REUSABLE DEVICES AND EQUIPMENT IN THEIR ORIGINAL LOCATIONS UPON COMPLETION OF THE NEW SIDING INSTALLATION. ALL ELECTRICAL CIRCUITS SHALL BE SAFED OFF DURING CONSTRUCTION. 1 EXISTING CEILING MOUNTED EXHAUST FAN IS TO BE DEMOLISHED. REMOVED EXISTING DISCONNECT, PRESERVE AND PROTECT EXISTING CONDUIT AND WIRING AND PREPARE RECONNECTION TO NEW EXHAUST FAN. EXISTING WALL MOUNTED FAN COIL UNIT IS TO BE DEMOLISHED. RESERVE AND PROTECT EXISTING CONDUIT AND WIRING AND PREPARE RECONNECTION TO NEW FAN COIL UNIT. 2 SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T CONSTRUCTION DOCUMENTS 02.27.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , & E X T E R I O R S I D I N G R E P L A C E M E N T DESIGN WEST ENGINEERING MECHANICAL ELECTRICAL ENERGY CONSULTANTS Edmonds, WA 98020 123 2nd Ave. S., Suite 220 Phone: 909.890.3700 Fax: 909.890.3770 Email: cadd@designwesteng.com EW LM 25-149 R: \ _ P R O J E C T \ 2 0 2 5 \ 2 5 - 1 4 9 R E N T O N S E N I O R C E N T E R \ _ C A D \ 2 5 - 1 4 9 E - 1 S P W R P L N - 20 2 6 - 0 2 - 2 7 - HA N D R A E H E N T H O R N ADDENDUM 31 GENERAL NOTES 1ELECTRICAL DEMOLITION PLAN - SECOND FLOOR SCALE: 1/8" = 1'-0" DEMOLITION NOTES ELECTRICAL DEMOLITION PLAN - SECOND FLOOR ED-102 1 SIGNED:02/27/2026 HV 6 MAU 1 EF 7 PNL 'M' (E) PNL 'P' (E) PNL 'K1' (E) PNL 'L' (E) PNL 'X' (E) PNL 'L' (E) PNL 'L2' (E) PNL 'D' EDH 9 FCU 10 M-19,20,21 AS: 30A AF: 15A EDH 3 EDH 2 M-20,22,24 30AS 20AF 30AS 30AF M-2,4,6 30AS 30AF FCU 11 M-7,9,11 HV 2 30AS 20AF 1 M-13,15,17 M-8,10,12 M-8,10,12 EDH 5 EDH 4 HV 3 AS: 30A AF: 20A M-1,3,5 HV 1 EDH 1 (E) PNL 'K2' (BELOW) AS:30A AF: 30A AS:30A AF: 30A AS: 30A AF: 20A K2-20,22,24 K2-21 2 AS: 400 AF: 225 AS: 30 AF: 20 1 ERV 3 ERV 6 ERV 4 ERV 1 ERV 2 ERV 5 2 2 2 2 2 2 M-25 M-25 M-27 M-27 M-27 M-27 3 3 4 4 SUNROOM COFFEE BAROFFICECONF.HEALTH/ COUNSELING CLOSETTLT. Room MEN'S RESTROOM WOMEN'S RESTROOM RISER ROOM JANITOR FITNESS ROOM CRAFTS ROOM SUPPLY ELECTRICAL STAIR ENTERTAINMENT ROOMELEV. RM.ELEV. Room WORK AREA RECEPTION BANQUET HALL KITCHEN Room Room FRIDGE FREEZER COMP. PANTRY EF 8 EF 9 (E) MAIN SWITCHBOARD 'MS' M-2,4,6 2 2 5 6 6 PNL 'M2' 7 7 7 M2-25,27,29 8 1.REFER TO MECHANICAL PLANS FOR THE EXACT LOCATION OF HVAC EQUIPMENT AND ADDITIONAL WIRING REQUIREMENTS. 2.PROVIDE DUCT DETECTOR POWER AND CONNECTIONS AS INDICATED ON MECHANICAL DRAWINGS. 3.PROVED FLEXIBLE SEAL TYPE CONDUIT FOR CONNECTION TO ALL HVAC EQUIPMENT. 4.PROVIDE HEAVY DUTY DISCONNECT SWITCHES WITH DUAL ELEMENT FUSES TO MATCH MOTOR H.P. RATING. 5.ALL ELECTRICAL EQUIPMENT SHALL BE IDENTIFIED WITH NAMEPLATES, REFER. TO SPECIFICATIONS. IN ADDITION, EACH DISCONNECT MUST BE MARKED TO IDENTIFY ITS PURPOSE AND INCLUDE IDENTIFICATION OF CIRCUIT SOURCE THAT SUPPLIES DISCONNECTING MEANS. (110.22) 6.CONTRACTOR SHALL PREPARE AND SUBMIT SHOP DRAWINGS DOCUMENTING ALL EXISTING AND NEW ELECTRICAL CONTROLS FOR HVAC SYSTEMS INSTALLED UNDER THIS CONTRACT. SUBMITTALS SHALL DEMONSTRATE THAT PROPOSED CONTROLS ACHIEVE THE SEQUENCES OF OPERATION AND CONTROL REQUIREMENTS INDICATED ON THE MECHANICAL DRAWINGS AND SCHEDULES. SHOP DRAWINGS SHALL INCLUDE COMPLETE POINT-TO-POINT WIRING DIAGRAMS. CONTROL SCHEMATICS, AND EQUIPMENT DATA SHEETS FOR ALL ASSOCIATED CONTROL DEVICES. IN ADDITION, CONTRACTOR SHALL PROVIDE COMPLETE WIRING DIAGRAMS FOR THE KITCHEN HVAC SYSTEM, INCLUDING ALL REQUIRED ELECTRICAL INTERLOCKS BETWEEN THE NEW HVAC EQUIPMENT, EXISTING KITCHEN SWITCH CONTROLS, AND THE EXISTING HOOD ANSUL FIRE SUPPRESSION SYSTEM. WIRING DIAGRAMS SHALL CLEARLY IDENTIFY ALL EXISTING FIELD CONDITIONS AND NEW WORK, AND SHALL CONFIRM THAT UPON ANSUL SYSTEM ACTIVATION, ALL REQUIRED HVAC EQUIPMENT SHUTDOWN SEQUENCES ARE ACHIEVED IN ACCORDANCE WITH NFPA 96 AND THE EQUIPMENT MANUFACTURERS REQUIREMENTS. 1 THIS CIRCUIT IS SHOWN IN MORE THAN ONE LOCATION. PROVIDE HOMERUN BACK TO COMMON JUNCTION BOX AT OR NEAR PANEL. DO NOT DOUBLE LUG ON BREAKER OR SPLICE IN PANEL BOARD ENCLOSURE. PROVIDE AND INSTALL 1P NEMA 1 MOTOR RATED SNAP SWITCH. PROVIDE AND INSTALL 2P NEMA 1 MOTOR RATED SNAP SWITCH. INDOOR UNIT POWERED BY OUTDOOR UNIT. PROVIDE WITH INTERLOCK WITH OPERATION OF KITCHEN HOOD EXHAUST FAN EF-2. PROVIDE LOW VOLTAGE CONTROL WIRING FROM OUTDOOR UNIT TO INDOOR UNIT. UNIT CONTROLLED VIA 12VDC SIGNAL WIRE TO EMS SYSTEM. CONDUIT FROM PANEL 'M' UP TO HVAC UNITS UP TO HVAC UNITS ON ROOF. REFER TO E-003 PANEL SCHEDULES. 2 3 4 5 6 7 8 SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T CONSTRUCTION DOCUMENTS 02.27.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , & E X T E R I O R S I D I N G R E P L A C E M E N T DESIGN WEST ENGINEERING MECHANICAL ELECTRICAL ENERGY CONSULTANTS Edmonds, WA 98020 123 2nd Ave. S., Suite 220 Phone: 909.890.3700 Fax: 909.890.3770 Email: cadd@designwesteng.com EW LM 25-149 R: \ _ P R O J E C T \ 2 0 2 5 \ 2 5 - 1 4 9 R E N T O N S E N I O R C E N T E R \ _ C A D \ 2 5 - 1 4 9 E - 1 S P W R P L N - 20 2 6 - 0 2 - 2 7 - HA N D R A E H E N T H O R N ADDENDUM 31 CONSTRUCTION NOTES GENERAL NOTES 1ELECTRICAL REMODEL PLAN - FIRST FLOOR SCALE: 1/8" = 1'-0" CONSTRUCTION NOTES GENERAL NOTES ELECTRICAL REMODEL PLAN - FIRST FLOOR E-101 1 1 1 1 1 1 SIGNED:02/27/2026 1 1 A A 5 5 6 6 7 7 10 10 11 11 12 12 13 13 14 14 15 15 16 16 20 20 21 21 22 22 23 23 24 24 B B C C D D E E F F G G J J L L Q Q FCU 9 EF 4 EF 5 HV 5 HV 4 M-19,21,23 AS: 30A AF: 15A AS: 30A AF: 15A M-19,21,23 1 M-14,16,18 M-14,16,18 EDH 6 EDH 7 AS: 30A AF: 15A AS: 30A AF: 15A M-20,22,24 EDH 8 AS: 30A AF: 20A L2-9 L2-9 1 3 2 4 4 BILLIARD ROOM GAME ROOM GAME ROOM ELEV. MEN'S RESTROOM WOMEN'S RESTROOM CLASSROOM TLT. TLT. ASSEMBLY ROOM BALCONY BALCONY (E) PNL 'P-2' 5 6 6 7 1.REFER TO MECHANICAL PLANS FOR THE EXACT LOCATION OF HVAC EQUIPMENT AND ADDITIONAL WIRING REQUIREMENTS. 2.PROVIDE DUCT DETECTOR POWER AND CONNECTIONS AS INDICATED ON MECHANICAL DRAWINGS. 3.PROVED FLEXIBLE SEAL TYPE CONDUIT FOR CONNECTION TO ALL HVAC EQUIPMENT. 4.PROVIDE HEAVY DUTY DISCONNECT SWITCHES WITH DUAL ELEMENT FUSES TO MATCH MOTOR H.P. RATING. 5.ALL ELECTRICAL EQUIPMENT SHALL BE IDENTIFIED WITH NAMEPLATES, REFER. TO SPECIFICATIONS. IN ADDITION, EACH DISCONNECT MUST BE MARKED TO IDENTIFY ITS PURPOSE AND INCLUDE IDENTIFICATION OF CIRCUIT SOURCE THAT SUPPLIES DISCONNECTING MEANS. (110.22) 6.CONTRACTOR SHALL PREPARE AND SUBMIT SHOP DRAWINGS DOCUMENTING ALL EXISTING AND NEW ELECTRICAL CONTROLS FOR HVAC SYSTEMS INSTALLED UNDER THIS CONTRACT. SUBMITTALS SHALL DEMONSTRATE THAT PROPOSED CONTROLS ACHIEVE THE SEQUENCES OF OPERATION AND CONTROL REQUIREMENTS INDICATED ON THE MECHANICAL DRAWINGS AND SCHEDULES. SHOP DRAWINGS SHALL INCLUDE COMPLETE POINT-TO-POINT WIRING DIAGRAMS. CONTROL SCHEMATICS, AND EQUIPMENT DATA SHEETS FOR ALL ASSOCIATED CONTROL DEVICES. IN ADDITION, CONTRACTOR SHALL PROVIDE COMPLETE WIRING DIAGRAMS FOR THE KITCHEN HVAC SYSTEM, INCLUDING ALL REQUIRED ELECTRICAL INTERLOCKS BETWEEN THE NEW HVAC EQUIPMENT, EXISTING KITCHEN SWITCH CONTROLS, AND THE EXISTING HOOD ANSUL FIRE SUPPRESSION SYSTEM. WIRING DIAGRAMS SHALL CLEARLY IDENTIFY ALL EXISTING FIELD CONDITIONS AND NEW WORK, AND SHALL CONFIRM THAT UPON ANSUL SYSTEM ACTIVATION, ALL REQUIRED HVAC EQUIPMENT SHUTDOWN SEQUENCES ARE ACHIEVED IN ACCORDANCE WITH NFPA 96 AND THE EQUIPMENT MANUFACTURERS REQUIREMENTS. 1 THIS CIRCUIT IS SHOWN IN MORE THAN ONE LOCATION. PROVIDE HOMERUN BACK TO COMMON JUNCTION BOX AT OR NEAR PANEL. DO NOT DOUBLE LUG ON BREAKER OR SPLICE IN PANEL BOARD ENCLOSURE. PROVIDE AND INSTALL 2P NEMA 1 MOTOR RATED SNAP SWITCH. INDOOR UNIT POWERED BY OUTDOOR UNIT. PROVIDE AND INSTALL 1P NEMA 1 MOTOR RATED SNAP SWITCH. PROVIDE LOW VOLTAGE CONTROL WIRING FROM OUTDOOR UNIT TO INDOOR UNIT. UNIT CONTROLLED VIA 12VDC SIGNAL WIRE TO EMS SYSTEM. CONDUIT FOR NEW HVAC CIRCUITS DOWN TO PANEL 'M'. 2 3 4 5 6 7 SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T CONSTRUCTION DOCUMENTS 02.27.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , & E X T E R I O R S I D I N G R E P L A C E M E N T DESIGN WEST ENGINEERING MECHANICAL ELECTRICAL ENERGY CONSULTANTS Edmonds, WA 98020 123 2nd Ave. S., Suite 220 Phone: 909.890.3700 Fax: 909.890.3770 Email: cadd@designwesteng.com EW LM 25-149 R: \ _ P R O J E C T \ 2 0 2 5 \ 2 5 - 1 4 9 R E N T O N S E N I O R C E N T E R \ _ C A D \ 2 5 - 1 4 9 E - 1 S P W R P L N - 20 2 6 - 0 2 - 2 7 - HA N D R A E H E N T H O R N ADDENDUM 31 CONSTRUCTION NOTES GENERAL NOTES 1ELECTRICAL REMODEL PLAN - SECOND FLOOR SCALE: 1/8" = 1'-0" CONSTRUCTION NOTES GENERAL NOTES ELECTRICAL REMODEL PLAN - SECOND FLOOR E-102 1 1 1 SIGNED:02/27/2026 HP 4 EF 2 EF 3 HP 8 RTU 1 HP 1 HP 3 HP 2 HP 5HP 6 HP 7 RTU 2 HP 10 EF 1 HP 9 M-31,33,35 L2-7 M-37,39,40 WP WP 1 1 (NL) P-2-10,12 (E ) P - 3 8 P-38 P-38 HP 11 AS: 30 M-30,32 AS: 30 AS: 30 M-26,28 5 E-201 D-7,9,11 5 E-201 M-38,40,42 K1-18 1 1 A A 5 5 6 6 7 7 10 10 11 11 12 12 13 13 14 14 15 15 16 16 20 20 21 21 22 22 23 23 24 24 B B C C D D E E F F G G J J L L Q Q RH 1 (TYP) RH 2 (TYP) 1 1 A A 5 5 6 6 7 7 10 10 11 11 12 12 13 13 14 14 15 15 16 16 20 20 21 21 22 22 23 23 24 24 B B C C D D E E F F G G J J L L Q Q AS: 100F AS: 200 AS: 60 AS : 3 0 M2-6,8 M2-10,12,14 AS:30 3 AS: 30 AS: 60 4 M2-1,3 AS: 60 M2-13,15AS : 6 0 M2-5,7 AS : 6 0 M2-9,11 AS : 6 0 AS : 6 0 M2-17,19 M2-21,23 M2-2,4AS: 30 5 5 2 E-201 #2#2 1 E-201 1.ALL CONDUITS SHALL BE INSTALLED IN THE CEILING BELOW U.O.N. 2.REFER TO MECHANICAL AND PLUMBING PLANS FOR THE EXACT LOCATION OF HVAC EQUIPMENT AND ADDITIONAL WIRING REQUIREMENTS. 3.PROVIDE DUCT DETECTOR/S.F.D. POWER AND CONNECTIONS AS INDICATED ON MECHANICAL DRAWINGS. 4.PROVIDE FLEXIBLE SEAL TYPE CONDUIT FOR CONNECTION TO ALL HVAC EQUIPMENT. 5.MOUNT ALL DISCONNECT SWITCHES INDEPENDENT OF THE HVAC UNIT SEE 6.ALL EXTERIOR ELECTRICAL EQUIPMENT SHALL BE NEMA 3R. 7.ALL EXTERIOR RECEPTACLE OUTLETS SHALL BE GFCI TYPE. 8.PROVIDE HEAVY DUTY DISCONNECT SWITCHES WITH DUAL ELEMENT FUSES TO MATCH MOTOR H.P. RATING. 9.CONTRACTOR SHALL PREPARE AND SUBMIT SHOP DRAWINGS DOCUMENTING ALL EXISTING AND NEW ELECTRICAL CONTROLS FOR HVAC SYSTEMS INSTALLED UNDER THIS CONTRACT. SUBMITTALS SHALL DEMONSTRATE THAT PROPOSED CONTROLS ACHIEVE THE SEQUENCES OF OPERATION AND CONTROL REQUIREMENTS INDICATED ON THE MECHANICAL DRAWINGS AND SCHEDULES. SHOP DRAWINGS SHALL INCLUDE COMPLETE POINT-TO-POINT WIRING DIAGRAMS. CONTROL SCHEMATICS, AND EQUIPMENT DATA SHEETS FOR ALL ASSOCIATED CONTROL DEVICES. IN ADDITION, CONTRACTOR SHALL PROVIDE COMPLETE WIRING DIAGRAMS FOR THE KITCHEN HVAC SYSTEM, INCLUDING ALL REQUIRED ELECTRICAL INTERLOCKS BETWEEN THE NEW HVAC EQUIPMENT, EXISTING KITCHEN SWITCH CONTROLS, AND THE EXISTING HOOD ANSUL FIRE SUPPRESSION SYSTEM. WIRING DIAGRAMS SHALL CLEARLY IDENTIFY ALL EXISTING FIELD CONDITIONS AND NEW WORK, AND SHALL CONFIRM THAT UPON ANSUL SYSTEM ACTIVATION, ALL REQUIRED HVAC EQUIPMENT SHUTDOWN SEQUENCES ARE ACHIEVED IN ACCORDANCE WITH NFPA 96 AND THE EQUIPMENT MANUFACTURERS REQUIREMENTS. 1 PROVIDE AND INSTALL 1P NEMA 3R MOTOR RATED SNAP SWITCH. PROVIDE (1) 1" C. FOR EXISTING CABLING FOR ANTENNA DEVICE. ROUTE CONDUIT UP EXISTING WALL TO ANTENNA DEVICE AND MAKE RECONNECTION TO DEVICE WITH EXISTING CABLING. VERIFY CONDITION OF EXISTING CABLING PRIOR TO RECONNECTION. VERIFY DEVICE IS IN WORKING ORDER. CONTROLLED VIA A LOCAL WALL SWITCH LOCATED IN KITCHEN. TYPE I HOOD MAKE UP AIR FAN, MAU-1, SHALL BE INTERLOCKED WITH THE TYPE I HOOD EXHAUST FAN, EF-2. UNIT CONTROLLED WITH LOW VOLTAGE SOLID STATE SPEED CONTROL. 2 3 4 5 SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T CONSTRUCTION DOCUMENTS 02.27.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , & E X T E R I O R S I D I N G R E P L A C E M E N T DESIGN WEST ENGINEERING MECHANICAL ELECTRICAL ENERGY CONSULTANTS Edmonds, WA 98020 123 2nd Ave. S., Suite 220 Phone: 909.890.3700 Fax: 909.890.3770 Email: cadd@designwesteng.com EW LM 25-149 R: \ _ P R O J E C T \ 2 0 2 5 \ 2 5 - 1 4 9 R E N T O N S E N I O R C E N T E R \ _ C A D \ 2 5 - 1 4 9 E - 1 S P W R P L N - 20 2 6 - 0 2 - 2 7 - HA N D R A E H E N T H O R N ADDENDUM 31 CONSTRUCTION NOTES GENERAL NOTES 1ELECTRICAL REMODEL PLAN - ROOF SCALE: 1/8" = 1'-0" CONSTRUCTION NOTES GENERAL NOTES ELECTRICAL REMODEL PLAN - ROOF E-103 1 1 1 1 1 1 1 1 1 SIGNED:02/27/2026 1 2 3 4 5 6 - 7 8 -9 -10 -11 -12 MECHANICAL UNIT DISCONNECT 1 2 FLOOR 1 2 CONSTRUCTION NOTES: MECHANICAL UNIT. SEALTITE WEATHERPROOF FLEXIBLE CONDUIT CONNECTION. PROVIDE AND INSTALL WALL MOUNTED DISCONNECT ENCLOSURE TYPE AND SIZED PER PLAN. VERIFY REQUIREMENTS WITH MECHANICAL CONTRACTOR FOR UNIT LOCATION AND EXACT ELECTRICAL REQUIREMENTS PROVIDE EQUIPMENT PER ELECTRICAL SPECIFICATIONS INCOMING FEED 1' - 6 " M A X . ROOF RECEPTACLE MOUNTING UNISTRUT CHANNEL SUPPORT FRAME P9000 DUPLEX GFCI RECEPTACLE (WEATHERPROOF), IF APPLICABLE. REFER TO PLANS FOR LOCATIONS 3/4" CONDUIT THROUGH ROOF TO PANELBOARD. FLASHING AND SEALANT AS REQUIRED BY ARCHITECT ROOF DRAWINGS SEALANT 1/4" DIA. LAG SCREW W/ 2-1/2" EMBED TO 4X SLEEPER ON ROOF. FOR SLEEPER SEE DETAIL UNISTRUT TELESTRUCT POST BASE P012 ROOF CONDUIT PENETRATION EPOXY COMPUND - TYP. FURNISHED BY MEC'L CONTRACTOR THREE VANDAL - PROOF SET SCREWS - TYP. PERAMSEAL - TYP. 2X BLK'G X 6" LONG W/ GRINNELL TIN STRAP - FIG. 231 OR APPROVED EQUAL REFER TO MFGR. SPECS FOR MOUNTING FOR PLYWOOD ROOF OR CORE DRILL FOR CONCRETE ROOF CONDUIT UP THRU ROOF STEEL REINFORCING BOOT ATTACH TO ROOF SHEATING WITH (4) #10 FLAT HEAD WOOD SCREW STONEMAN #1110-4 FLASHING OR APPROVED EQUAL 7" 2 1 / 2 " 5" 8" SKIRT MECHANICAL UNIT DISCONNECT MECHANICAL UNIT SEALTITE WEATHERPROOF FLEXIBLE CONDUIT CONNECTION ROOF STRUCTURE AND FLASHING PER ARCHITECTURAL PLANS ORBIT PREFAB PEDESTAL & BASE PLATE VERIFY STRUCTURAL ATTACHMENT WITH STRUCTURAL ENGINEER CONSTRUCTION NOTES: 60 " M A X . 1 2 3 4 1 PROVIDE AND INSTALL WEATHERPROOF NEMA 3R DISCONNECT SIZED PER PLAN. VERIFY REQUIREMENTS WITH MECHANICAL CONTRACTOR FOR UNIT LOCATION AND EXACT ELECTRICAL REQUIREMENTS. PROVIDE EQUIPMENT PER ELECTRICAL SPECIFICATIONS. 4 2 5 (4) 1/2" DIA. X 5" LAG SCREWS 3 5 CONDUIT THRU ROOF 12"6" 3" MIN. 1% SLOPE 8" 22 GA SHEET METAL CAP (SOLDERED SEAMS) 20 GA. G.I. FLASHING BY ELEC. CONTR. RIGID INSULATION, CANTSTRIP AND ROOFING BY ROOFING CONTRACTOR 2X BASE PACK OPENING WITH INSULATION COMPLETELY SEAL ALL OPENINGS WITH MASTIC ELECTRICAL CONDUITS GENERAL NOTES: 1.REFER TO FLOOR PLAN FOR CONDUIT SIZE, LOCATION AND QUANTITY. CONDUIT MOUNTING AND RISER STRUCTURE UNISTRUT ROUTE AND SWEEP AS INDICATED ON FLOOR PLAN CONDUIT CLAMP ROUTE AND SWEEP AS INDICATED ON FLOOR PLAN CONDUIT CLAMP UNISTRUT SUPPORT PLASTIC BUSHING SHEET SHEET TITLE © COPYRIGHT 2025 - BCRA, INC. ALL RIGHTS RESERVED SEAL T 2 5 3 . 6 2 7 . 4 3 6 7 F 2 5 3 . 6 2 7 . 4 3 9 5 W W W . B C R A D E S I G N . C O M 21 0 6 P A C I F I C A V E N U E , S U I T E 3 0 0 , T A C O M A , W A 9 8 4 0 2 IF SHEET MEASURES LESS THAN 22"X34", IT IS A REDUCED PRINT. REDUCE SCALE ACCORDINGLY BCRA NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T CONSTRUCTION DOCUMENTS 02.27.2026 25040 DO N P E R S S O N R E N T O N S E N I O R AC T I V I T Y C E N T E R 21 1 B U R N E T T A V E N RE N T O N , W A 9 8 0 5 7 HV A C , R O O F , & E X T E R I O R S I D I N G R E P L A C E M E N T DESIGN WEST ENGINEERING MECHANICAL ELECTRICAL ENERGY CONSULTANTS Edmonds, WA 98020 123 2nd Ave. S., Suite 220 Phone: 909.890.3700 Fax: 909.890.3770 Email: cadd@designwesteng.com EW LM 25-149 R: \ _ P R O J E C T \ 2 0 2 5 \ 2 5 - 1 4 9 R E N T O N S E N I O R C E N T E R \ _ C A D \ 2 5 - 1 4 9 E - D E T A I L S - 20 2 6 - 0 2 - 2 7 - HA N D R A E H E N T H O R N ADDENDUM 31 ELECTRICAL DETAILS E-201 1 1 SIGNED:02/27/2026