Loading...
HomeMy WebLinkAboutR-4214002ABBREVIATIONS: ABBREVIATIONS (CONTINUED): GENERAL NOTES: COR CONDITIONS OF APPROVAL: o a� Coo ti J Z � _ W cV w 00 U o CO X 70 co � Uo C) �_ CD cal c� NI rr N 0 ��ry o N O o92 0,5 m W a > 0 Y U 0 0 e LU (n �I LL L7 w a U 0- X 2E AFO AERIAL FIBER OPTIC AP ANGLE POINT BOC BACK OF CURB BOS BACK OF SIDEWALK BOT BOTTOM BOW BOTTOM OF WALL BTWN BETWEEN CB CATCH BASIN CIP CAST IN PLACE CJ CONSTRUCTION JOINT COA CITY OF AUBURN COK CITY OF KENT CONC CONCRETE CONT CONTINOUS COR CITY OF RENTON CL CENTERLINE CID CENTER POINT CSBC CRUSHED SURFACING BASE COURSE CSTC CRUSHED SURFACING TOP COURSE DIA DIAMETER DWG DRAWING E EASTING EJ EXPANSION JOINT ELEV, EL ELEVATION EX EXISTING FF FRONT OF FACE FG FINISH GRADE FL FLOW LINE HMA HOT MIX ASPHALT IB INBOUND IE INVERT ELEVATION KCM KING COUNTY METRO L LENGTH LT LEFT MAX MAXIMUM MH MANHOLE MIN MINIMUM N NORTHING NO. NUMBER NTS NOT TO SCALE NST NOT STEEPER THAN OB OUTBOUND OC ON CENTER OHP OVERHEAD POWER OHT OVERHEAD TELEPHONE/ TELECOM PC POINT OF CURVATURE No. I REVISION PCC POINT OF COMPOUND CURVATURE POB POINT OF BEGINNING POE POINT OF END PRC POINT OF REVERSE CURVE PROP PROPOSED PSE PUGET SOUND ENERGY PT POINT PI POINT OF INTERSECTION PVC POINT OF VERTICAL CURVE PVC POLYVINYL CHLORIDE PVI POINT OF VERTICAL INTERSECTION PVT POINT OF VERTICAL TANGENT RT RIGHT RTIS REAL TIME INFORMATION SYSTEM ROW RIGHT OF WAY SD STORM DRAIN SF SQUARE FOOT/FEET SHLDR SHOULDER SPA SPACING STA STATION SR STATE ROUTE STD STANDARD SYM SYMMETRICAL TC, TOC TOP OF CURB TCE TEMPORARY CONSTRUCTION EASEMENT TESC TEMPORARY EROSION AND SEDIMENT CONTROL TOW TOP OF WALL TSP TRANSIT SIGNAL PRIORITY TYP TYPICAL UD UNDERDRAIN UNO UNLESS NOTED OTHERWISE UTIL UTILITY W/ WITH WSDOT WASHINGTON STATE DEPARTMENT OF TRANSPORTATION BY I APP'D I DATE APPLICABILITY THE REQUIREMENTS IN THESE NOTES, AS WELL AS IN THE CONTRACT SPECIFICATIONS, SUPPLEMENT THE REQUIREMENTS OF THE AGENCY OR AGENCIES HAVING JURISDICTION OVER THE WORK IN THIS CONTRACT. IN THE CASE OF CONFLICT, THE MOST STRINGENT REQUIREMENTS SHALL APPLY. IN CASE THAT ONE OR MORE ELEMENTS OF THE WORK ARE NOT COVERED BY REQUIREMENTS OF AN AGENCY, OR AGENCIES, THE REQUIREMENTS IN THESE NOTES SHALL APPLY. GENERAL NOTES - (KING COUNTY METRO) 1. ALL WORK METHODS AND MATERIALS SHALL BE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND THE LATEST EDITION OF THE SPECIFICATIONS AND THE APPLICABLE DEVELOPMENT GUIDELINES AND DESIGN AND CONSTRUCTION STANDARDS FROM THE AGENCY HAVING JURISDICTION OVER THE SITES OF WORK. 2. CONTACT EACH AGENCY'S PUBLIC WORKS DEPARTMENT AND SCHEDULE AND ATTEND A PRECONSTRUCTION MEETING AT LEAST ONE WEEK BEFORE BEGINNING CONSTRUCTION. ATTENDANTS TO INCLUDE EACH AGENCY'S APPOINTED REPRESENTATIVE(S) AND THE PROJECT REPRESENTATIVE. 3. ASSUME FULL RESPONSIBILITY FOR WORKER SAFETY, AND DAMAGE TO STRUCTURES AND IMPROVEMENTS RESULTING FROM CONSTRUCTION OPERATIONS. 4. MAINTAIN THE FOLLOWING THROUGHOUT THE EXECUTION OF THIS PROJECT, AND AT A LOCATION KNOWN AND ACCEPTABLE TO THE PROJECT REPRESENTATIVE AND THE JURISDICTIONAL REPRESENTATIVES ASSIGNED TO THE PROJECT: A. ALL APPLICABLE PERMITS, AND CONDITIONING THEREIN. B. THE APPROVED PLANS. C. A CURRENT COPY OF THE DEVELOPMENT GUIDELINES AND DESIGN AND CONSTRUCTION STANDARDS FROM EACH AGENCY HAVING JURISDICTION OVER THE SITES OF WORK. D. TRAFFIC CONTROL AND STREET MAINTENANCE PLANS APPROVED BY THE AGENCY OR AGENCIES HAVING JURISDICTION OVER THE SITES OF WORK. E. A CURRENT SET OF RECORD (AS CONSTRUCTED) DRAWINGS. F. COPIES OF THE HEALTH, SAFETY AND ACCIDENT PREVENTION PLANS. 5. WORK SHALL CONFORM TO THE APPROVED DRAWINGS AND THE CONTRACT SPECIFICATIONS. CHANGES TO THESE DOCUMENTS REQUIRE PRE -APPROVAL FROM THE PROJECT REPRESENTATIVE AND THE AGENCY HAVING JURISDICTION OVER THE SITES OF WORK. 6. PROVIDE THE PROJECT REPRESENTATIVE WITH A SET OF RECORD DRAWINGS THAT MEET THE CONTRACT REQUIREMENTS PRIOR TO THE PROJECT FINAL APPROVAL. 7. PRIOR TO CONSTRUCTION OF METRO FOOTINGS AND FACILITIES, PLEASE CONTACT METRO INSPECTORS AND CONSTRUCTION AT BUSSTOPINSPECTIONS@KINGCOUNTY.GOV OR BY PHONE AT 206-263-2381. PLEASE NOTE THAT METRO REQUIRES NOTICE OF AT LEAST THREE WEEKS IN ADVANCE TO SCHEDULE AN INSPECTION. ALL METRO FOOTINGS MUST BE INSPECTED AND APPROVED BY METRO INSPECTORS BEFORE ANY CONCRETE IS POURED. WORK SCHEDULE NOTES 1. DAYS AND HOURS OF WORK SHALL CONFORM TO THE CONDITIONS IN THE PERMITS ISSUED BY THE AGENCY HAVING JURISDICTIONS OVER SITES OF WORK. ON (425) 453-5000 1100 112TH AVE NE, SUITE 500 cobBELLEVUE, WA 98004 DESIGNED: APPROVED: A. VILLAR G. FRANCO DRAWN: C. WILCOX CHECKED: PROJECT NO: A.STOTT E00566E18 CHECKED: CONTRACT NO: l K. CHANG YUEN CXXXXXXXX 1. ISSUANCE OF CIVIL CONSTRUCTION PERMIT C2 1 00 1 1 28 IS FOR THE PURPOSES OF PROJECT BID AND CONTRACTOR PROCUREMENT. CONSTRUCTION SHALL NOT OCCUR UNTIL THE CITY PROJECT MANAGER ISSUES A NOTICE TO PROCEED. 2. A PRE -CONSTRUCTION MEETING SHALL BE HELD WITH THE APPLICANT, PROJECT CONTRACTOR, CITY REPRESENTATIVES AND INSPECTION STAFF PRIOR TO NOTICE TO PROCEED. 3. ALL PROJECT CONSTRUCTION AND INSPECTION FEES SHALL BE PAID PRIOR TO SCHEDULING OF PRE -CONSTRUCTION MEETING AND ISSUANCE OF THE NOTICE TO PROCEED. 4. ALL PROJECT ENTITLEMENTS SUCH AS CONSTRUCTION EASEMENTS AND ROW ACQUISITIONS SHALL BE IN PLACE AND COPIES PROVIDED TO THE CITY PRIOR TO ISSUANCE OF THE NOTICE TO PROCEED. 5. PROJECT PUBLIC AGENCY SERVICE AGREEMENT SHALL BE IN PLACE AND EXECUTED PRIOR TO NOTICE TO PROCEED. 6. ALL OUTSIDE AGENCY PERMITS OR APPROVALS SUCH AS PERMITS FROM SOOS CREEK WATER AND SEWER DISTRICT, DEPARTMENT OF ECOLOGY OR WASHINGTON STATE DEPARTMENT OF TRANSPORTATION SHALL BE IN PLACE AND PROVIDED TO THE CITY PRIOR TO NOTICE TO PROCEED. 7. SHEET 1 EC.OA (PAGE 107): ADD ADDITIONAL NOTES FOR PRE -CONSTRUCTION. NOTES TO BE ADDED TO SPECIFICATIONS. 8. SHEETS 1 L 1 .02, 1 L 1 .04A, 1 L 1 .13, ITS 1 .02B, ITS 1 .07B (PAGES 348, 351 , 360, 383, 400): ITERIS APEX VECTOR (4-WAY) VIDEO DETECTION SYSTEM IS REQUIRED FOR ALL VIDEO DETECTION ON THE PROJECT IN LIEU OF GRIDSMART VIDEO DETECTION CAMERAS. UPDATE PROJECT SPECIFICATIONS. 9. SHEET 1 L2.05 (PAGE 370): CONTRACTOR TO REQUEST STREETLIGHT POLE ID TAG NUMBERS FROM COR TRANSPORTATION MAINTENANCE AFTER ALL STREET LIGHTS ARE INSTALLED AND FURNISH/INSTALL STREETLIGHT ID TAGS PER CITY OF RENTON STANDARD PLANS 12 1. 10. SHEET 1 L2.05 (PAGE 370): A COLUMN ON THE POLE & FIXTURE SCHEDULE IS REQUIRED FOR ADDING LAT/LONG BY CONTRACTOR ON AS -BUILT PLANS. 1 1. SHEET 1 TS 1.00 (PAGE 376): ADD ADDITIONAL NOTES. NOTES TO BE ADDED TO SPECIFICATIONS. 12. SHEET 1 TS 1.0 1 B (PAGE 378): VECTOR VANTAGE FOR VIDEO DETECTION. 13. SHEET 1 TS 1.0713 (PAGE 400): PROVIDE ADDITIONAL SCOOT SYSTEM INFORMATION TO CITY TRANSPORTATION DEPARTMENT FOR REVIEW PRIOR TO NOTICE TO PROCEED. 14. SHEET I C8.02 (PAGE 422): INSTALL STOP BAR TO SOUTHERN EDGE OF WBTL. 15. SHEETS I C8.10, 1 C8.1 1, 1 C8.1 5 (PAGES 434, 436, 44): REMOVE STOP BARS AT RRFB CROSSINGS ON CITY STREETS. KEEP STOP BARS AT RRFB CROSSINGS ON WSDOT HIGHWAYS. Lal King County METRO DEVELOPMENT ENGINEERING Michael Sippo 09/11/2024 T-421402 FS-42140-21 0-4-21400 R-421402 METRO TRANSIT CAPITAL DIVISION DATE: RAPIDRIDE I LINE JUNE2024 GENERAL NOTES AND ABBREVIATIONS DRAWING NO: 1 G0.01 SHEET NO: OF 2 473 O N O O O 9 N N Q J