Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
R-4214095
SITE PREP GENERAL NOTES N O 0 W H z O z w ry z z Q U Z X z O z w ry r) 0 X z O z w w ry w C9 X a� O LL z J w U ry Q d X z O z w ry z O U u1 H O w w FT X _. O a 3 O X 0 N N 0 z w 0 w J X m O U H u1 u1 _ X 7p 09 o C? �M U N N 7 � 0 � W J — Z � U O Q X �0� U 00 J N o0NI Imo �Ei �cqm Coo 04 x � Y N o N 3 o �00 =o Y ��7 0 0 X 3iLU�w w Q c9 U d X dH0 TAL-21 28+34.89, 35.00' RT 1. SEE SHEET 1C4.00 FOR SITE PREPARATION GENERAL NOTES. SITE PREP NOTES 0 PRESERVE AND PROTECT FEATURE AS NOTED 0 REMOVE FEATURE AS NOTED OPRESERVE AND PROTECT EXISTING TREE 0 REMOVAL OF FEATURE BY OTHERS (METRO) 05 REMOVE OR RELOCATE FEATURE BY OTHERS 06 RELOCATE FEATURES BY OTHERS (METRO) ORELOCATE FEATURES BY CONTRACTOR \,:J 'k I HL-Z I Z / t / Z.0ZJ, .50.00 K I E31�3No3 CROSSWALK 2 0 3 TAL-21 25+86.32, 30.00' RT 2 CURB & GUTTER r M= E 2 (FENCE �� -�Q TAL-21 27+77.09, 20.29' RT 20 �NialIne 3 I °°-0Q %1 \ 1 RRFB ��j5 w Q 1 ROCK WALL �5 �„ 0 LA �2 CURB & GUTTER 2 TAL-21 25+70.62, 30.00' RT o a I \ _ TAL-21 25+76.67, 42.32' RT \ \ TAL-21 25+65.90, 43.39' RT I \ TAL-21 25+56.44, 48.04' RT 0Y I 0 wU \ Oj ©Q I C' I 0' 20' 40' DEVELOPMENT ENGINEERING Michael Sippo 09/11/2024 SCALE: 1" = 20' R-421495 DESIGNED: APPROVED: METRO TRANSIT CAPITAL DIVISION DATE: AD -READY SUBMITTAL ' JUNE 2024 A. VILLAR G. FRANCO cob1100 112TH5AVE NE, SUITE 500 ��ei � ��s��.�� DRAWN: LQ RAP I D RI D E I LINE BELLEVUE, WA 98004 A®� C. WILCOX King County CHECKED: PROJECT N0: R E N TO N SEGMENT DRAWING N0: pgo J.LIM E00566E18 METRO SITE PREPARATION PLAN 1 C4.08 `��'�� 6/12/24 CHECKED: CONTRACT N0: No. REVISION BY APP�D DATE TAL-21 24+00 TO TAL-21 29+00 SHEETNO: OF K.CHANG YUEN lCxXxxxxxx 1 95 473