Loading...
HomeMy WebLinkAboutR-4214107r N O 0 W I Q 0 U LL.I 0 0 cc J O O 0) W 0 Q 00 J w M §E U o(_5 LLJ o m X "�� �CU70 Lo '!d: N O N O � N o x w 0 Co N 0 CD0 a) o p c � U 0 0 Y wCO wCD w Q U a X 2i STANDARD ESC PLAN NOTES: 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR. 2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY'S COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT. 3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS. 4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK -OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE. 6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON -SITE DUMPING OR EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS. 7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON- SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT. 8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY. 9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR STORMWATER FACILITIES. 11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. 12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM. 13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1STAND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY. 14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OR ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. 16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION. 17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT- LADEN WATER INTO THE DOWNSTREAM SYSTEM. 18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON -SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION. 20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW. 21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT- LADEN WATER FROM LEAVING PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON- SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1 ST. 22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS OF WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS OF WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. ADDITIONAL NOTES FOR PRE -CONSTRUCTION: SITE PREP AND TESC LEGEND 1. APPROVED TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) AND STORMWATER POLLUTION PREVENTION AND SPILL CONTROL (SWPPS) MEASURES REMOVE ASPHALT PAVEMENT ARE TO BE INSTALL AS FIRST ORDER OF BUSINESS AND MAINTAINED AT ALL TIMES PER APPROVED DRAWINGS OR AT DIRECTION OF CONSTRUCTION STORMWATER REMOVE CEMENT CONCRETE PAVEMENT SUPERVISOR, OR THE PROJECT CERTIFIED EROSION AND THE SEDIMENT CONTROL LEAD (CECCL) AND THE PUBLIC WORKS INSPECTOR. REMOVE CEMENT CONCRETE SIDEWALK 2. THE APPROVED CONSTRUCTION STORM POLLUTION PREVENTION PLAN (CSWPP) SHALL BE LOCATED ON SITE AT ALL TIMES. +++++++++++++ CLEARING AND GRUBBING 3. WEEKLY REPORTS OUTLINING STATUS AND CONDITION OF EROSION CONTROL PLAN, WITH ANY ................. . RECOMMENDATIONS OF CHANGE OR REVISION TO PLANE BITUMINOUS PAVEMENT, 2 INCHES MAINTENANCE SCHEDULES OR INSTALLATION, ARE REQUIRED TO BE SUBMITTED BY PROJECT ENGINEER OF RECORD OR CECSL TO PROJECT MANAGER AND PUBLIC WORKS INSPECTOR. WEEKLY REPORTS SHALL // - // ' // - // ' // " REMOVAL ITEM INCLUDE PROJECT'S NPDES PERMIT NUMBER(IF APPLICABLE). SEE STANDARD ESC NOTE 15. N 4. IF DEWATERING FOR SITE IS REQUIRED, ALL SITE RIGHT-OF-WAY (EXISTING) CONSTRUCTION STORMWATER DISCHARGE SHALL BE 0 LESS THAN 25 NTU'S IF DISCHARGED INTO WATER OF THE STATE. ANY PIPE CONVEYANCE SYSTEM THAT RIGHT-OF-WAY (PROPOSED) EVENTUALLY DISCHARGES TO A BODY OF WATER IS 0O N CONSTRUED AS DISCHARGING IN WATER OF THE U STATE. • • TEMPORARY CONSTRUCTION EASEMENT 5. IF DEWATERING IS PROPOSED TO THE CITY SEWER THEN A PERMIT FROM THE CITY AND KING COUNTY WILL BE REQUIRED. IF DEWATERING IS PROPOSED TO ❑ INLET PROTECTION - EXISTING CB A SEWER SYSTEM BELONGING TO ANOTHER SEWER DISTRICT, CONTACT THAT DISTRICT FOR APPROVAL. N CONTRACTOR IS STRONGLY ENCOURAGED TO OBTAIN ALL REQUIRED SEWER DISCHARGE PERMITS IN INLET PROTECTION - PROPOSED CB M ADVANCE OF ANY ANTICIPATED NEED TO DISCHARGE TO A SEWER. O 6. DUST CONTROL SHALL BE IMPLEMENTED AS DIRECTED SILT FENCE O 0 BY THE PUBLIC WORKS INSPECTOR. r 7. PROPER REMOVAL OF ALL TESC MEASURES IS COMPOST SOCK N ce REQUIRED PRIOR TO PERMIT CLOSEOUT, UNLESS OTHERWISE APPROVED BY THE PUBLIC WORKS a INSPECTOR OR PROJECT MANAGER. 8. Only one (1) signal may be constructed at a time, not multiple locations constructed all at once. Contractor should identify construction sequence, especially at newly constructed signalized intersections.The entire intersection cannot be down the entire process. 9. Access to all Pedestrian vicinities (including wheelchair ramps, push buttons, and walkways) should remain at all times during construction and off hours at signalized intersections 10. Temporary signal heads have to be placed in line with temporary marked crosswalks. Temporary push buttons have to be APS and ADA accessible. In addition, the contractor needs to identity all locations that may or will have temporary signals. 11. Traffic Control Plan submittal's shall follow WSDOT Specifications 1-05.3, 1-10.2(2), and City of Renton Traffic Control Guidelines. In addition to these specifications, the contractor must identify AM and PM Peak hours, night work/noise variance requirements/procedure, WSDOT Closures, other city project closures/construction conflicts, special events. 12. Procurement (signal poles, video detection, cabinets) lead time should be identified before construction and suspensions planned accordingly. Condition of Approval #7: Notes added. Add notes to project specifications. :] DEVELOPMENT ENGINEERING Michael Sippo 09/11 /2024:0R-4214107 AD-READY SUBMITTAL DESIGNED: APPROVED: METRO TRANSIT CAPITAL DIVISION DATE: (425) 453-5000 ti1� DRAWN: G. FRANCO RAP I D RI D E I LINE �uNE 2024 7 W. 1100 112TH AVE NE, SUITE 500 '�~'�`� -cob LQ King County BELLEVUE, WA 98004 67 H.JOHNSON APi CHECKED: PROJECT NO: RENTON SEGMENT DRAWING NO: 33200 SS OISTE4� ��5J. ETULAIN E00566E18 METRO TESC 1 EC.OA I0NAL F'� CHECKED: CONTRACT N0: SHEET N0: OF No. REVISION BY APP'D DATE 06/12/24 GENERAL NOTES AND LEGEND NO: 473 K. CHANG YUEN CXXXXXXXX 107