Loading...
HomeMy WebLinkAboutR-4214153U) X a Z O w r J N X a Z o � Wry Q W I J W X z O z W ry ry 0 X a z O z w ry J W U ry Q RMA J Q z 0 X X O C9 CV N 00 a z O z w n' 3I O X z O z W ry I z O X a 0 c m 00 m CV N z O z w 0 X 3 a O ry a_ 3I O X a Z O z w o o >I U � X 0 cz a J Z J 2i Q a X o o � U XO o U o CC) J N U w o co LO CY)o Lo 3: o U I o Y X pj C-) O 6 p N 0 a= o z w LU 0 0 X w v> �I � LL w Q U a X 2i GRA 25+98.42, 40.47' LT TAL-B 10+35.23 76.05' LT FG 32.61 GRADING GENERAL NOTES BEGIN CURB AND GUTTER MATCH EX\ BOS 32.45 BOS 35.70 TAL-B 13+68.54, 73.92' LT FG 35.79 1. ALL CURB HEIGHTS TO BE 6" UNLESS OTHERWISE NOTED. END CURB AND GUTTER I � END CURB AND GUTTER MATCH EX MATCH EX MATCH EX BOS 32.58� BOS 32.08 FG 35.58 MATCH CURB 2. SEE ROW, SURVEY CONTROL & ALIGNMENT PLANS FOR ROW EX FL 29.71 I FL 32.05 FL 34.96 FL 35.92 INFORMATION. TOC 30.22 I I TOC 32.54 BOS 33.14 BOS 33.20 BOS 34.14 BOS 35.10 TOC 35.46 I I MATCH EX FG 31.96 BOS 32.25 FG 33.08 FG 34.02 FG 34.98� TOC 36.32 �\ 3. SEE PAVING PLANS FOR EXACT LOCATION OF PROPOSED CIVIL IMPROVEMENTS. BOS 30.25 \ o -1.0% \ \�� FG 32.13 FL 33.40 FL 34.37 BOS 36.17 BOS 36.39 MATCH EX r o 1 0 a FL 31.35 FL 31.52 FL 32.46 C 4. GRADING ELEVATIONS PROVIDED AT KEY DESIGN POINTS AND 50 FOOT - � TOC 31.85 TOC 32.02 TOC 32.96 TOC 33.90 HOC 34.87 915460-0010� MATCH EX \ STATION INTERVALS. 1C .03 ' `14 _------- IS (IS FL 35.11 BOS 36.44 5. SEE LANDSCAPING PLANS FOR PLANTING LAYOUT. FG 30.35 FG 31.88 �" - TOC 35.66 - - } P 6. SEE STRUCTURAL PLANS FOR LIMIT AND TYPE OF RETAINING WALL. MATCH EX MATCH EX 1 6.04 \ P a - 7. SEE STATION PLANS FOR LIMIT OF STATION AREA AND PEDESTRIAN 1 C6.03 P Pa o a a `��. p . a FG 35.81 _ GUARDRAIL. 9 Q 4 / a ° ° a ° ° MATCH EX 8. SEE STATION PLANS FOR GRADING AT STATIONS INCLUDING LOCATION ILq EX � o� � T � �, � }--�T� 1 � OF FOUNDATIONS FOR SHELTERS AND TECH PYLONS. ETCH J � I P P P P P q ° O 9. SEE PAVING PLANS FOR LIMIT OF CONCRETE BUS PAD. CD ❑ _ T \ o o P 1 C6.05 10. SEE DRIVEWAY PLANS FOR DRIVEWAY GRADING AND LIMITS OF ® y 2 I T _ T N T T T "' T T- FG 35.76 T O � � T T M / � T � � T T T T � � T T T P 5 � T � CONFORMS.DRIVEWAY 11. SEE CURB RAMP P ANS FOR CURB RAMP GRADING. ° T T 1 C6.04 3, _ T T V T - T I - 12. NEGATIVE SLOPE VALUES ARE SHOWN IN THE DOWNHILL DIRECTION. FG 31.67 TAL-B 10+82.42, 42.00' LT FG 33.63 8� + MATCH EX FL �o o FG 32.06 FG 32.89 MATCH EX FG 34.36 0, FG 34.89 `T r W GRADING LEGEND GRA 25 56.53, 81.21 LT FG 30.14 �� MATCH EX MATCH EX MATCH E\ Sri MATCH EX FG 34.92 BEGIN CURB AND GUTTER MATCH EX / 12+00 TALBOT RD S MATCH EX I HMA FULL DEPTH FG 28.91 MATCH EX I �- 11 +00 � 3_+Qp ETCH EX FL 28.61 10 00 _ FG 34.73 0 TOC 28.66 \ FG 29.36 FG 31.26 (TAL-B-LINE) _ _ MATCH EX r MATCH EX FG 31.40 FG 31.51 MATCH EX �� n FG 31.74 _ _ Mi HMA OVERLAY GRA 24+77.10, 77.93' LT MATCH EX MATCH EX \ MATCH EX FG 32.30 _ END CURB AND GUTTER FG 29.98 MATCH EX C,G o CEMENT CONCRETE MATCH EX MATCH EX G N G FL28.11 _ FG31.90 o Q� MATCH EX M NlTOC 28.52 0 \ S SD SD S� SID - FG 32.27_ so o S� Sp SD SD SD `G G 00 CEMENT CONCRETE CROSSWALK FG 29.07 �w N _ W G G G MATCH EX G M_ G_ G FG 28.53 MATCH EX o SEE SHEET W TOC 32.41 TOC 32.50 MATCH EX TOC 32.45 TOC 32.46 G G W W W LANDSCAPING co° a ° ,a � MATCH EX TOC 32.63 � MATCH EX 1C10.04A W ° w q FG 31.76 MATCH EX l MATCH EX G \ \ FOR MEDIAN a ° _ _ _ MATCH EX Q Pi DETAIL 4 - - - - - - = - _ TOC 32.62 0 0000000o DETECTABLE WARNING SURFACE FG 29.74 , W - - W W _ o000000000 BOS 28.61 a a W _ _ _ - _ MATCH EX 1ATCH EX MATCH EX a FG 31.78 -' �- - - J � ° 1 f; � .� �. � � � � � � � Q RETAINING WALL =__BOS 32.76 ---- _ _ I y y y y y T - --�Q I / / 3 Qo -70 FL 31.34 U MATCH EX 35-1 3, �- TOC 31.84 BOS 32.62 BOS 32.63 BOS 32.81 - w PEDESTRIAN GUARDRAIL y y y LLI a /� BOS 32.86 _Z z a �/ a a MATCH EX MATCH EX MATCH EX I MATCH 4 4 TAL-B 11+70.88, 49.09' RT J FENCE y ° FL 28.35 0 Q a / Q a v a 4 BOS 31.95 END CURB AND GUTTER \ _MAO32.88 TCH EX y -1.5 /o TOC 28.78 Q ° BOS 31.85 MATCH EX \ v .03 � ,,, I � C� _ � I ° a � � � 4 � FL 31.69 � � RIGHT OF WAY (PROPOSED) BOS 28.90 y I Q y y � , � � � 1 y � � � TOC 32.24 a 4 BOS 31.89 \ yw (n _ EXISTING SLOPE � � 4 � �--� BOS 32.56 X.X% \ a 1 C6.04 MATCH EX FL 28.36 ° 19230 PROPOSED SLOPE TOC 28.86 y ( y 4� 4 4 \�0 / 5-9423 X.X% BOS 29.01 FG 29.08 ( ,� S/ Q..a� gQ4 a MATCH EX \ BOS 29.01 _ -3.4% o % -2.3% -2.1 % y ° MATCH LINE GRA 24+0 - 0 SEE SHEET 1 C10.03 CURB RETURN SCHEDULE RETURN # PC - STA, OFFSET PT - STA, OFFSET RADIUS LENGTH DELTA PC 1/4 1/2 3/4 PT 1 GRA 24+41.68, 42.26' LT GRA 24+77.10, 77.93' LT 35.00' 55.52' 90053'38" 28.35 28.29 28.23 28.17 28.11 2 GRA 25+56.53, 81.21' LT GRA 25+98.42, 40.47' LT 40.00' 64.81' 92050'07" 28.47 28.87 29.19 29.47 29.71 3 GRA 23+79.50, 50.50' RT TAL-B 11+52.57, 49.05' RT 105.00' 160.96' 87049'56" 30.91 30.02 30.13 31.23 31.34 4 TAL-B 10+35.23, 76.05' LT TAL-B 10+70.21, 42.00' LT 35.00' 54.03' 88027'07" 32.05 31.88 31.70 31.52 31.35 wTAL-B 13+36.66, 42.00' LT TAL-B 13+67.42, 68.47' LT 35.00' 45.60' 74038'26" 35.17 35.36 35.55 35.74 35.93 0' 20' 40' SCALE: 1" = 20' DEVELOPMENT ENGINEERING Michael Sippo 09/11/2024 R-4214153 DESIGNED: APPROVED: METRO TRANSIT CAPITAL DIVISION DATE: AD -READY SUBMITTAL ' JUNE 2024 �$. �N%ra'Nlk" A. VILLAR G. FRANCO (425 1 53-50002TH AVE NE, SUITE 500 ��4.� waDRAWN: .RAPIDRIDE I LINE BELLEVUE, WA 98004 � C. WILCOX King County CHECKED: PROJECT N0: LQ R E N TO N SEGMENT DRAWING N0: pis �$B. HORN E00566E18 MET GRADING PLAN 1C10.04 ®�`��'�� 6/13/24 CHECKED: CONTRACT N0: No. REVISION BY APP'D DATE TAL-B 10+00 TO TAL-B 14+00 SHEET N0: OF K. CHANG YUEN CXXXXXXXX 153 473