Loading...
HomeMy WebLinkAboutR-42141680 N O W Imm _. O C9 N N C2 z O z W ry z z Q U z x z O z W n' RMA P. 0 ry 0 ry 0 m N N C2 z O z W ry z O Q X Z O F z w fy 0 x 0 z W CD W J x z 0 J Q x M U O 0 ca x J o N O O CO N U Of I W 0 o L 00O 0 a0E-- cc 0 ti m Eon -(D Ego N O M O ~ o N U a N W W a�= x F- L w w 0 C� U a x 2E CURB RAMP TABLE CURB RAMP RAMP TYPE RAMP LEFT RAMP RIGHT LENGTH POINT A (STA) POINT B (STA) S1010 S2010 S3% S4% S5% S6% S7% S8% S9% S10% WING WIDTH WING (MIN) PARALLEL A 1 9.82' 6.61' 7.83' 8.00' GRA 24+50.24 GRA 24+56.53 0.44 1.50 1.50 5.41 4.81 0.51 6.75 5.96 1.50 1.50 PARALLEL A 2 7.83' 6.61' 7.66' 7.25' GRA 24+72.16 GRA 24+75.01 0.44 1.50 1.50 5.69 6.00 0.67 7.08 7.41 1.50 1.50 PARALLEL A 3 7.08' 5.97' 8.60' 6.00' GRA 25+61.63 GRA 25+64.95 -1.75 1.81 1.51 4.47 6.53 -1.88 4.49 7.21 1.25 1.09 PARALLEL A 4 1 5.56' 1 5.97' 1 10.23' 1 6.00' 1 GRA 25+80.09 GRA 25+85.50 -1.75 1 1.71 1 1.32 1 5.65 1 6.22 1 -1.47 1 4.94 1 7.40 1 0.65 1.39 S7_ S6 S8 OA 1cf) cn POINT A (STA) S4 000000000000 000000000000 �o�o�o�0 0 0 10000002020001 /S5 LEFT WING si RIGHT WING RAMP AT BACK WIDTH(AT BACK OF CURB) (AT FLOWLINE)OF CURB) POINT 8 (STA) CURB RAMP GENERAL NOTES 1. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET. 2. ALL ELEVATIONS SHOWN ARE FINISHED GRADE ELEVATIONS. 3. UNLESS OTHERWISE NOTED, SPOT ELEVATIONS LOCATED AT FACE OF CURB ARE FLOWLINE ELEVATIONS. 4. NEGATIVE SLOPE INDICATES FLOW IN OPPOSITE DIRECTION OF ARROWS SHOWN ON EXAMPLES. 5. FOR MEDIAN DETAILS, SEE GRADING PLANS. 6. REFER TO SIGNAL PLANS FOR PLACEMENT OF PEDESTRIAN PUSH BUTTONS AND SIGNAL EQUIPMENT. CURB RAMP NOTES 0 PARALLEL CURB RAMP PER WSDOT STD PLAN F-40.12 20 PERPENDICULAR CURB RAMP PER WSDOT STD PLAN F-40.15 OSINGLE DIRECTION CURB RAMP PER WSDOT STD PLAN F-40.16 40 DETECTABLE WARNING SURFACE PER WSDOT STD PLAN F-45.10 CURB RAMP LEGEND HMA (FULL DEPTH AND OVERLAY) a y ° a CEMENT CONCRETE W W LANDSCAPING o�o00 ooo DETECTABLE WARNING SURFACE CEMENT CONCRETE CROSSWALK - - RIGHT OF WAY (EXISTING) RIGHT OF WAY (PROPOSED) PARALLEL CURB RAMP EXAMPLE SCALE: 1"=10' DEVELOPMENT ENGINEERING NTS Michael Sippo 09/11/2024 R-4214168 DESIGNED: APPROVED: METRO TRANSIT CAPITAL DIVISION DATE: AD -READY SUBMITTAL ' JUNE 2024 �. A. VILLAR G. FRANCO RAP I D RI D E I LINE (425) 453-5000 �� ®g w DRAWN: 1 100 1 12TH AVE NE, SUITE 500 Q .JacobsBELLEVUE, WA 98004 ®x� C. WILCOX King County CHECKED: PROJECT N0: LQR E N TO N SEGMENT DRAWING N0: ®.c 54834 � B. HORN E00566E18 METRO CURB RAMP PLAN 1 C6.03 ssj®NALCHECKED: CONTRACT N0: No. REVISION BY APP'D DATE 6/13/24 S GRADY WAY & TALBOT RD S SHEET N0: OF K.CHANG YUEN CXXXXXXXX 168 473 N M r O O O 9 r N IL O N O O N N a J