Loading...
HomeMy WebLinkAboutR-4214174■ 0 0) z O z w elf U17) X z O z w Of J w X z O z w Of J Q Z X a) z O z w _. O N N co z O z w ry r' 0 X Z O z w ry z' z Q U Z C0 _. ►94 O ry a O X ry U00 m (V N z O z w ry z' O Q X 0 z w 0 w J X z J Q _• O O 0- 0 U �T X a c J O O NI O � w 0 cO m U c J om7 Cc �LO Cl) CU 00 LO"fd:CD ��> " o O M O ~I o N U �czw w 0 X � � w 0_0 w O Q U a X Q= O c2 �-- POINT A m w (STA) o' J tz LEFT WING (AT BACK 4' X 4' MIN S7 LANDING 2% MAX ao rn S601 1U) col 000000000000 0000000000000 00000000000oo 0000000000000 S1_ RAMP WIDTH D_ z O � � � POINT B 0') (STA) m �z S5 U RIGHT WING (AT BACK OF CURB) (AT FLOWLINE) OF CURB) S7_ S6_ _S8 OA 0 cn POINT A (STA) S4 _ O 0 _ S5 000000000000 0.0000000000 C)0u0u0u0u0u0 DODo,o,o,o,o LEFT WING SRAM RIGHT WING RAMP AT BACK WIDTH AT BACK OF CURB) (AT FLOWLINE)OF CURB) POINT B (STA) OTRDS -21-LINE) CURB RAMP TABLE CURB RAMP GENERAL NOTES 1. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET. 2. ALL ELEVATIONS SHOWN ARE FINISHED GRADE ELEVATIONS. 3. UNLESS OTHERWISE NOTED, SPOT ELEVATIONS LOCATED AT FACE OF CURB ARE FLOWLINE ELEVATIONS. 4. NEGATIVE SLOPE INDICATES FLOW IN OPPOSITE DIRECTION OF ARROWS SHOWN ON EXAMPLES. 5. FOR MEDIAN DETAILS, SEE GRADING PLANS. 6. REFER TO SIGNAL PLANS FOR PLACEMENT OF PEDESTRIAN PUSH BUTTONS AND SIGNAL EQUIPMENT. CURB RAMP NOTES 0 PARALLEL CURB RAMP PER WSDOT STD PLAN F-40.12 0 PERPENDICULAR CURB RAMP PER WSDOT STD PLAN F-40.15 30 SINGLE DIRECTION CURB RAMP PER WSDOT STD PLAN F-40.16 40 DETECTABLE WARNING SURFACE PER WSDOT STD PLAN F-45.10 CURB RAMP LEGEND HMA (FULL DEPTH AND OVERLAY) p P CEMENT CONCRETE W W LANDSCAPING 00 . 1D. o DETECTABLE WARNING SURFACE 000 CEMENT CONCRETE CROSSWALK - - - RIGHT OF WAY (EXISTING) RIGHT OF WAY (PROPOSED) CURB RAMP RAMP TYPE RAMP LEFT RAMP RIGHT LENGTH POINT A (STA) POINT B (STA) S1 % S20% S3% S4% S5% S6% S7% S8% S9% S10% WING WIDTH WING (MIN) PARALLEL A 1 10.33' 6.16' 7.32' 7.00' TAL-21 25+56.24 TAL-21 25+61.49 1.70 1.25 1.49 6.49 2.50 1.72 7.59 2.72 1.01 1.25 PERPENDICULAR A 2 7.41' 5.03' 5.49' 4.92 TAL-21 25+63.34 TAL-21 25+60.65 1.50 0.81 1.02 7.12 1.09 1.30 1.80 -1.00 -1.50 N/A 0' 10, 20' PERPENDICULAR CURB RAMP EXAMPLE PARALLEL CURB RAMP EXAMPLE FDEVELOPMENT ENGINEERING NTS NTS Sippo 09/11 /2024 SCALE: 1" = 10' FR _-4 2 14 17-4 DESIGNED: APPROVED: METRO TRANSIT CAPITAL DIVISION DATE: AD -READY SUBMITTAL ' JUNE2024 s. A. VILLAR G. FRANCO RAP I D RI D E I LINE (425) 453-5000 �Qi 0 DRAWN: 1100 112TH AVE NE, SUITE 500 King County .JacobsBELLEVUE, WA 98004 ®x C. WILCOX CHECKED: PROJECT NO: R E N TO N SEGMENT DRAWING NO: 0•'�eQis8r>$9� K. CRAIG E00566E18 METRO CURB RAMP PLAN 1 C6.09 No. REVISION BY APP'D DATE �sI®NAL � 6/13/24 CHECKED: CONTRACT NO: TALBOT RD S & S 23RD ST SHEET NO: OF K.CHANG YUEN CXXXXXXXX 174 473