Loading...
HomeMy WebLinkAboutR-4214181■ 0 Q z C9 X X 0 N N O z 0 0 z w 0 X Z 0 Z w ry Z Z Q 2 U Z U) Z 0 H Z W 3: 0 X 3 a Z O z w rK >' a_ z J Q X cfl U 0 O oFT �X J o O N O � N U ry W rl p ,� m 000 a(-D� � � Y ti m oEE� ECGE CO Lo Ego N O CO CD~ o N U N W � � W a � 2 C9 0 o X . � w v) �I w LU 0-0 w Q U a X No. 105TH 26+26.18, 32.70' LT BOS 385.98 105TH 26+26.17, 30.63' LT FG 385.44 105TH 26+24.30, 25.90' LT BOS 385.87 BOS 385.52 FG 385.33 FG 384.98 PT 105TH 26+19.71, 23.69' LT BOS 385.35 R=7.0' FG 384.81 105TH 26+19.17, 23.67' LT BOS 385.37 105TH 26+16.71, 23.67' LT FG 384.83 BOS 385.45 PC FG 384.91 y y y y y y y „ �V- yyy - D '_ p D p p D p a n n p D� S7 S6 D 105TH 26+28.39, 12.44' RT 2 RAMP 3 105TH 26+63.21, 33.50' LT BOS 386.56 PC 105TH 26+72.71, 24.00' LT BOS 386.98 PC � y y .v y y y y y v .v y a D -D n p D D D 105TH 26+60.82, 18.35' LT 2 RAMP 2 27+00 SE 180TH S_T (105TH-LINE) pD OOOOOO D a n p V D D D n D n D D p° a D D �y y y y I I I I I I I I I I I I I _S8 P OA U) m POINT A (STA) _00000 S4 o n S5 - 0000000o0 000000000000 0000 00>,0000 105TH 26+24.76, 14.29' LT RAMP 1 26+00 Y D n � .v .v y POINT B (STA) Q = OA m POINT A 01 m z (STA) Li Of J tz LEFT WING S1 - RIGHT WING RAM P (AT BACK WIDTH (AT BACK OF CURB) (AT FLOWLINE) OF CURB) PARALLEL CURB RAMP EXAMPLE NTS AD -READY SUBMITTAL REVISION 4' X 4' MIN S7 LANDING 2% do - MAX 00 S6_ V)_ 0_)l N I� 000000000000 000000000000 000000000000 000000000000 000000000000 S1_ RAM P WIDTH POINT B (STA) / S5 RIGHT WING (AT BACK OF CURB)(AT FLOWLWE)OF CURB) PERPENDICULAR CURB RAMP EXAMPLE BY I APP'D I DATE LEFT WING (AT BACK NTS co(425) 453-5000 1100 112TH AVE NE, SUITE 500 BELLEVUE, WA 98004 P❑ CURB RAMP TABLE CURB RAMP GENERAL NOTES 1. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET. 2. ALL ELEVATIONS SHOWN ARE FINISHED GRADE ELEVATIONS. 3. UNLESS OTHERWISE NOTED, SPOT ELEVATIONS LOCATED AT FACE OF CURB ARE FLOWLINE ELEVATIONS. 4. NEGATIVE SLOPE INDICATES FLOW IN OPPOSITE DIRECTION OF ARROWS SHOWN ON EXAMPLES. 5. FOR MEDIAN DETAILS, SEE GRADING PLANS. 6. REFER TO SIGNAL PLANS FOR PLACEMENT OF PEDESTRIAN PUSH BUTTONS AND SIGNAL EQUIPMENT. CURB RAMP NOTES 10 PARALLEL CURB RAMP PER WSDOT STD PLAN F-40.12 20 PERPENDICULAR CURB RAMP PER WSDOT STD PLAN F-40.15 OSINGLE DIRECTION CURB RAMP PER WSDOT STD PLAN F-40.16 ODETECTABLE WARNING SURFACE PER WSDOT STD PLAN F-45.10 CURB RAMP LEGEND HMA (FULL DEPTH AND OVERLAY) n D P CEMENT CONCRETE W W LANDSCAPING 0000000a0000 DETECTABLE WARNING SURFACE CEMENT CONCRETE CROSSWALK - - RIGHT OF WAY (EXISTING) RIGHT OF WAY (PROPOSED) CURB RAMP RAMP TYPE RAMP LEFT RAMP RIGHT LENGTH POINT A (STA) POINT B (STA) S1 % S2% S3% S4% S5% S6% S7% S8% S9% S10% WING WIDTH WING (MIN) PARALLEL A 1 8.10' 12.62' 8.59' 5.97' 105TH 26+24.76 105TH 26+32.24 -1.50 1.00 1.00 1.10 5.55 -1.06 1.87 8.07 1.00 1.00 PERPENDICULAR A 2 4.83' 5.02' 7.68' 5.32' 105TH 26+60.82 105TH 26+64.49 -1.30 7.82 7.92 8.61 7.34 -1.40 -1.33 1.83 1.75 N/A PERPENDICULAR A 3 9.00, 5.00' 6.01' 6.00' 105TH 26+28.39 105TH 26+23.39 1.70 7.38 7.63 8.84 5.26 1.40 1.42 1.52 1.49 N/A N 0' 10, 20' DEVELOPMENT ENGINEERING SCALE: 1" = 10' Michael Sippo 09/11 /2024 0 FR-421 4181 DESIGNED: APPROVED: METRO TRANSIT CAPITAL DIVISION DATE: A. VILLAR G. FRANCO JUNE 2024 DRAWN: RAPIDRIDE I LINE C. WILCOX LKing County CHECKED: PROJECT N0: R E N TO N SEGMENT DRAWING N0: K. CRAIG E00566E18 METRO CURB RAMP PLAN 1 C6.16 CHECKED: CONTRACT NO: S E 180TH ST SHEET N0 OF 181 473 K.CHANG YUEN CXXXXXXXX N M O O O 9 N IL