HomeMy WebLinkAboutR-4214190r
N
0
0
W
Imm
Q
0
ry
0
0
0
co
J
o 0)
XO o
77 C,U o
pp J N
Cl) 3: ElfI
o U LL.I
0 m
LO
I_
LO N
3: Cl) U
Y
X pj
C-) O 6
p N 0
a o z
� w
LU
0 0 X .
w &5 v>
LL
0-0 w Q
U a X
CITY OF RENTON DRAINAGE NOTES:
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT
8.
ALL UTILITY TRENCH BACKFILL AND ROADWAY
14.
BUILDINGS AND OTHER STRUCTURES SHALL BE
ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING
SUBGRADE SHALL BE COMPACTED TO 95% MAXIMUM
PLACED IN ACCORDANCE WITH TABLE 4.1 EASEMENT
SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY
DRY DENSITY PER SECTION 2-03.3(14)D - COMPACTION
WIDTHS AND BUILDING SETBACKS LINES OF THE
REFERRED TO AS THE CITY, THE APPLICANT, AND THE
AND MOISTURE CONTROL TESTS OF THE WSDOT
RENTON SWDM.
APPLICANT'S CONTRACTOR.
STANDARD SPECIFICATIONS. IN PERMEABLE PAVEMENT
AND OTHER INFILTRATION AREAS, ALL TRENCH
15.
LIDS OF MANHOLES/CATCH BASINS WITHIN PUBLIC
2. THE APPLICANT SHALL BE RESPONSIBLE FOR
BACKFILL SHALL BE FIRM AND UNYIELDING BUT IN NO
RIGHT-OF-WAY SHALL NOT BE ADJUSTED TO FINAL
SECURING ALL NECESSARY CITY, STATE, AND FEDERAL
CASE SHALL BE COMPACTED TO MORE THAN 92% OF
GRADE UNTIL AFTER PAVING. ALL MANHOLE/CATCH
PERMITS PRIOR TO CONSTRUCTION.
MAXIMUM DRY DENSITY.
BASIN RIMS SHALL BE ADJUSTED TO BE FLUSH WITH
3. ALL STORM DRAINAGE IMPROVEMENTS SHALL BE
FINAL FINISHED GRADES, UNLESS OTHERWISE SHOWN.
DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH
9.
OPEN CUTTING OF EXISTING ROADWAYS FOR STORM
THE LATEST EDITION OF THE CITY OF RENTON
DRAINAGE WORK IS NOT ALLOWED UNLESS
16.
ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY RIGHT
SURFACE WATER DESIGN MANUAL (RENTON SWDM),
SPECIFICALLY APPROVED BY THE CITY AND NOTED ON
OF WAY SHALL BE SUFFICIENT LENGTH TO PROVIDE A
RENTON MUNICIPAL CODE (RMC), AND THE STANDARD
THESE APPROVED PLANS. ANY OPEN CUT SHALL BE
MINIMUM 3:1 SLOPE FROM THE EDGE OF THE
SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL
RESTORED IN ACCORDANCE WITH THE CITY TRENCH
DRIVEWAY TO THE BOTTOM OF THE DITCH.
CONSTRUCTION PREPARED BY WSDOT AND THE
RESTORATION STANDARDS.
AMERICAN PUBLIC WORKS ASSOCIATION (APWA). IT
17.
ROCK FOR EROSION PROTECTION OF ROADSIDE
SHALL BE THE SOLE RESPONSIBILITY OF THE
10.
ALL PIPE AND STRUCTURES SHALL BE STAKED FOR
DITCHES, WHERE REQUIRED, SHALL BE OF SOUND
APPLICANT TO CORRECT ANY ERROR, OMISSION OR
SURVEY LINE AND GRADE PRIOR TO THE START OF
QUARRY ROCK PLACED TO A MINIMUM DEPTH OF ONE (1)
VARIATION FROM THE ABOVE REQUIREMENTS FOUND
CONSTRUCTION. WHERE SHOWN ON THE PLANS OR
FOOT AND SHALL MEET THE FOLLOWING
IN THE PLANS. ALL CORRECTIONS SHALL BE AT NO
WHERE DIRECTED BY THE CITY, THE EXISTING
SPECIFICATIONS:
ADDITIONAL COST TO THE CITY.
MANHOLES, CATCH BASINS, OR INLETS SHALL BE
A. 4-8 INCH ROCK / 40 - 70% PASSING.
ADJUSTED TO THE GRADE AS STAKED.
4. APPROVAL OF THE ROAD, GRADING, PARKING,
B. 2-4 INCH ROCK / 30 - 40% PASSING; AND
BUILDING, AND DRAINAGE PLAN DOES NOT
11.
ALL FLOW CONTROL FACILITIES SHALL BE INSTALLED
CONSTITUTE AS APPROVAL OF ANY OTHER
AND IN OPERATION PRIOR TO, OR IN CONJUNCTION
C. LESS THAN 2 INCH ROCK / 10 - 20% PASSING
CONSTRUCTION (E.G. WATER, SEWER, GAS,
WITH, ANY CONSTRUCTION ACTIVITY UNLESS
ELECTRICAL, ETC.). PLANS FOR STRUCTURES SUCH AS
APPROVED BY THE CITY.
18.
FOOTING DRAINAGE SYSTEMS AND ROOF DOWNSPOUT
BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A
SYSTEMS SHALL NOT BE INTERCONNECTED AND SHALL
SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR
12.
ALL PIPE AND APPURTENANCES SHALL BE LAID ON A
SEPARATELY CONVEY COLLECTED FLOWS TO THE
TO CONSTRUCTION. THE SURFACE WATER DRAINAGE
PROPERLY PREPARED FOUNDATION IN ACCORDANCE
CONVEYANCE SYSTEM OR FLOW CONTROL FACILITY ON
SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE
WITH THE CURRENT STATE OF WASHINGTON
THE SITE, UNLESS APPROVED BY THE CITY. FOOTING
APPROVED PLANS. ANY DEVIATION FROM THE
STANDARD SPECIFICATION FOR ROAD AND BRIDGE
DRAINS SHALL NOT BE CONNECTED TO ON -SITE BMPs.
APPROVED PLANS WILL REQUIRE COORDINATION
CONSTRUCTION. THIS SHALL INCLUDE NECESSARY
FOLLOWED BY WRITTEN APPROVAL FROM THE CITY.
LEVELING OF THE TRENCH BOTTOM OR THE TOP OF
19.
THE END OF EACH STORM DRAIN STUB SHALL BE
CAPPED. A CLEANOUT TOPPED WITH A BOLT - LOCKING
5. A COPY OF THE APPROVED PLANS SHALL BE ON THE
THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT
LID MARKED "STORM" OR "DRAIN" SHALL BE LOCATED AT
JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
AND COMPACTION OF REQUIRED BEDDING MATERIAL
THE PROPERTY LINE OR AT THE POINT OF CONNECTION
TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF
OF A PRIVATE STORM DRAINAGE CONVEYANCE SYSTEM
THE PIPE WILL BE SUPPORTED ON A UNIFORMLY
PER THE CITY STANDARD PLAN 227.00.
6. THE LOCATION OF ALL EXISTING UTILITIES SHOWN
DENSE, UNYIELDING BASE. ALL PIPE BEDDING AND
HEREON HAVE BEEN ESTABLISHED BY FIELD SURVEY
BACKFILL SHALL BE AS SHOWN ON THE CITY
20.
ALL STORM SYSTEM EXTENSIONS SHALL BE STAKED OR
OR OBTAINED FROM AVAILABLE RECORDS AND SHALL
STANDARD PLAN 220.00, 220.10, AND 220.20.
LINE AND GRADE BY A SURVEYOR LICENSED IN
THEREFORE BE CONSIDERED APPROXIMATE ONLY AND
NOT NECESSARILY COMPLETE. IT IS THE SOLE
WASHINGTON STATE, AND CUT SHEETS SHALL BE
13.
ALL DRAINAGE STRUCTURES SUCH AS CATCH BASINS
PROVIDED TO THE CITY PRIOR TO CONSTRUCTION.
RESPONSIBILITY OF THE APPLICANT AND THE
AND MANHOLES SHALL BE FITTED WITH DUCTILE IRON,
APPLICANT'S CONTRACTOR TO INDEPENDENTLY
BOLT -LOCKING LIDS PER THE CITY STANDARD PLAN
21.
ALL NEWLY- INSTALLED AND NEWLY- REHABILITATED
VERIFY THE ACCURACY ALL UTILITY LOCATIONS
204.10, 204.20, 204.30, 204.40, 204.50.
(PUBLIC AND PRIVATE) STORM CONVEYANCE SYSTEMS
SHOWN, AND TO FURTHERR DISCOVER AND AVOID ANY
STRUCTURES SHALL HAVE:
SHALL BE INSPECTED BY MEANS OF REMOTE CCTV
OTHER UTILITIES NOT SHOWN HEREON THAT MAY BE
A. RECTANGULAR OR ROUND, SOLID LIDS
ACCORDING TO THE CITY STANDARD PLAN 266.00. CCTV
AFFECTED BY THE IMPLEMENTATION OF THIS PLAN.
WHEN NOT COLLECTING RUNOFF, AND
INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO
THE APPLICANT SHALL RECORD ON THE AS -BUILT
OUTSIDE OF THE ROADWAY.
THE CITY PRIOR TO RECEIVING APPROVAL TO INSTALL
DRAWINGS ALL UNDOCUMENTED UTILITIES
PROJECT CURBS, GUTTERS AND/OR PAVEMENT.
DISCOVERED AND ANY CHANGES TO THE APPROVED
PLANS. THE APPLICANT SHALL IMMEDIATELY NOTIFY
B. ROUND, SOLID LIDS WHEN NOT
COLLECTING RUNOFF, AND LOCATED WITHIN
22.
ALL STORM SYSTEMS AND CONNECTIONS TO EXISTING
THE ENGINEER OF RECORD IF A CONFLICT EXISTS.
THE ROADWAY, BUT OUTSIDE OF THE
MAINS SHALL BE TESTED IN ACCORDANCE WITH SECTION
7. VERTICAL DATUM SHALL BE NAVD 88 AND HORIZONTAL
CURB/GUTTER LINE.
7-04.3(1) OF THE WSDOT STANDARD SPECIFICATIONS
DATUM SHALL BE NAD 83 (WA STATE PLANE, NORTH),
AND IN THE PRESENCE OF A REPRESENTATIVE OF THE
UNLESS OTHERWISE APPROVED BY THE CITY.
C. ROUND, SOLID LIDS DISPLAYING THE CITY
CITY. STORM DRAIN STUBS SHALL BE TESTED FOR
LOGO WHEN WITHIN THE PUBLIC
ACCEPTANCE AT THE SAME TIME THE MAIN STORM IS
RIGHT-OF-WAY OR IN AN EASEMENT TO THE
TESTED.
CITY. PRIVATE STRUCTURE LIDS OUTSIDE
PUBLIC RIGHT-OF-WAY AND EASEMENTS TO
23.
FOR ALL DISTURBED PERVIOUS AREAS (COMPACTED,
THE CITY SHALL NOT DISPLAY THE CITY LOGO.
GRADED, LANDSCAPED, ETC.) OF THE DEVELOPMENT
SITE, TO MAINTAIN THE MOISTURE CAPACITY OF THE
SOIL EITHER STOCKPILE AND REDISTRIBUTE THE
EXISTING DUFF LAYER AND NATIVE TOPSOIL OR AMEND
THE SOIL WITH COMPOST IN ACCORDANCE WITH
STANDARD PLAN 264.00.
24. ISSUANCE OF THE BUILDING OR CONSTRUCTION
PERMITS BY THE CITY DOES NOT RELIEVE THE
APPLICANT OF THE CONTINUING LEGAL OBLIGATION
AND/OR LIABILITY CONNECTED WITH STORMWATER
DISPOSAL. THE CITY DOES NOT ACCEPT ANY
OBLIGATION FOR THE PROPER FUNCTIONING AND
MAINTENANCE OF THE STORM SYSTEM PROVIDED
DURING CONSTRUCTION.
25. ADEQUATE SAFEGUARDS, SAFETY DEVICES,
PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER
ACTIONS NEEDED TO PROTECT THE LIFE, HEALTH, AND
SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY
IN CONNECTION WITH THE PERFORMANCE OF WORK
SHALL BE PROVIDED. ANY WORK WITHIN THE
TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT
NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC
CONTROL PLAN APPROVED BY THE CITY. ALL SECTIONS
OF THE WSDOT STANDARD SPECIFICATIONS 1-10
TEMPORARY TRAFFIC CONTROL SHALL APPLY.
26. PROJECTS LOCATED WITHIN THE CITY'S AQUIFER
PROTECTION AREA (APA) SHALL COMPLY WITH SPECIAL
REQUIREMENT #6 OF THE RENTON SWDM AND
AQUIFER PROTECTION REGULATIONS (RMC 4-3-050).
27. PLACEMENT OF SURFACE APPURTENANCES (CATCH
BASIN/ MANHOLE LIDS, CLEANOUTS, INLETS, ETC.) IN
THE STREET TRAVEL LANE WHEEL PATH,
INTERSECTIONS OF STREET TRAVEL LANES, BIKE
LANES, SIDEWALKS, AND CROSSWALKS SHALL BE
AVOIDED WHENEVER POSSIBLE. ANY SURFACE
APPURTENANCE PLACED IN A SIDEWALK OR
CROSSWALK SHALL BE FITTED WITH A NOW SLIP OR
NOW SKID LID PER ADA REQUIREMENTS.
28. CLEARLY LABEL PUBLIC AND PRIVATE SYSTEMS ON
THE PLANS. PRIVATE SYSTEMS SHALL BE MAINTAINED
BY THE APPLICANT.
29. MINIMUM COVER OVER STORM DRAINAGE PIPE SHALL
CONFORM TO TABLE 4.2.1.A2 (SHOWN BELOW) OF THE
RENTON SWDM.
30. CONSTRUCTED PERMEABLE PAVEMENT SHALL BE
PERMEABLE ENOUGH TO ABSORB WATER AT A
MINIMUM RATE OF 20 INCHES PER HOUR IMMEDIATELY
AFTER THE PAVEMENT SURFACE HAS BEEN WETTED
CONTINUOUSLY FOR AT LEAST 10 MINUTES.
COMPLIANCE WITH THIS MINIMUM RATE SHALL BE
CHECKED PRIOR TO CONSTRUCTION APPROVAL OF
THE PAVEMENT. COMPLIANCE MAY BE CHECKED USING
A SIMPLE BUCKET TEST IN WHICH 5 GALLONS OF
WATER IS POURED ONTO THE PAVEMENT SURFACE ALL
AT ONCE. IF ONLY A MINOR AMOUNT OF WATER PONDS
OR RUNS OFF THE SURFACE, THEN THE PAVEMENT IS
CONSIDERED TO MEET THE MINIMUM RATE OF
ABSORPTION. AT LEAST ONE TEST SHALL BE
CONDUCTED PER 1,000 SQUARE FEET OF PERMEABLE
PAVEMENT. IF THIS TEST IS NOT CONCLUSIVE, THEN
ANOTHER TEST PER ASTM C1701 SHALL BE
CONDUCTED. FOR LARGE AREAS (E.G., PARKING
AREAS), TESTING OBSERVATION MAY BE
ACCOMPLISHED WHILE WALKING BEHIND A SLOWLY
MOVING WATER TRUCK DISCHARGING WATER AT A
RATE SIMILAR TO THE BUCKET TEST. PERMEABLE
PAVERS SHALL BE TESTED USING ASTM C1781.
ADDITIONAL NOTES FOR PRE -CONSTRUCTION
1. PIPE AND MATERIALS SHALL BE AS INDICATED ON
APPROVED PLANS AND STANDARD NOTES.
2. WHEN INSTALLING STORM DRAIN IN NEW ROADWAYS,
PROPOSED ROAD PRISM SHALL BE CONSTRUCTED TO
SUBGRADE PRIOR TO ANY UTILITY INSTALLATION.
3. CONTRACTOR MUST NOTIFY PROJECT MANAGER AND
PUBLIC WORKS INSPECTOR OF ANY VERTICAL
CONFLICT PRIOR TO PROCEEDING WITH
CONSTRUCTION. ANY PROPOSED CHANGES SHALL BE
SUBMITTED TO CITY AS DESCRIBED IN MAJOR FILED
CHANGES NOTE. SEE CITY OF RENTON DRAINAGE
NOTE 6.
4. CATCH BASINS SHALL BE GROUTED SMOOTHLY.
5. STORM SYSTEM SHALL BE FLUSHED AND CLEANED
PRIOR TO FINAL APPROVAL. THIS INCLUDE
DOWNSTREAM SYSTEM FOR A MINIMUM OF TWO
STRUCTURES OR 500 FEET, WHICHEVER IS GREATER.
ALLOWABLE PIPE MATERIALS AND MINIMUM COVER
PIPE TYPE
MINIMUM
COVER (FT)
CORRUGATED STEEL PIPE
2.0
SPIRAL RIB STEEL PIPE
2.0
REINFORCED CONCRETE PIPE
1.0
CORRUGATED OR SPIRAL RIB ALUMINUM PIPE
2.0
DUCTILE IRON
1.0
LINE CORRUGATED POLYETHYLENE PIPE (LCPE)
2.0
CORRUGATED POLYETHYLENE PIPE (CPE) - TRIPLE WALL
2.0
POLYVINYL CHLORIDE PIPE (PVC)
3.0
SOLID WALL HIGH DENSITY POLYETHYLENE PIPE (HDPE)
2.0
DEVELOPMENT ENGINEERING `
-r
Michael Sippo 09/11/2024
F-R-4214190-]
AD -READY SUBMITTAL
DESIGNED: APPROVED: METRO TRANSIT CAPITAL DIVISION DATE:
7
1�1Ji B. kj W. HICKEY G. FRANCO RAP I D RI D E I LINE DUNE 2024
(425) 453-5000 .yti of � hl �DRAWN: �
1100 112TH AVE NE, SUITE 500 �'� �`� �'� � King County
A cobBELLEVUE, WA 98004 �� H. JOHNSON
CHECKED: PROJECT NO: RENTON SEGMENT DRAWING NO:
�° 200
01STY,"' �J.ETULAIN E00566E18 METRO DRAINAGE 1 DR.OA
No. REVISION BY APP'D DATE
SI01V012/24
AL S CHECKED: CONTRACT NO: GENERAL NOTES SHEET NO: OF
6/K. CHANG YUEN CXXXXXXXX 212 473