Loading...
HomeMy WebLinkAboutR-4214195GENERAL NOTES N O 0 W H z O z LU fy 0 J x En 3 z O z LU w U Q ry X En 3 z O z w J X En 3 0 z LU cD w J X z O z LU ry O ry M• 0 N N 0 ry m N N 22 z O z LU ry x z O z LU r' 0 x z O z LU ry z O Q _• O a O x z O F- z w _ X > En i a - z 3 0 3 Lu J � n � 3 0 x 0 )Lz ) � J Q ? pp X 3 0 %I y? O CO N O N J O Of N 0 O N O )- Cd m i 3 >, 0 _co s O i p Y 1F- U) w ~ LUL Z _j < i 0- x 2Ei �w Q Quo MATCH LINE GRA 24+00 - SEE SHEET 1 DR.03 -31 C 12'1D I S D � y� ��, C/EOBE — — 7/0 Q — — — — 3/O _ �`�, �o SDCB (1-18), TYPE 2-48 ��oQ / �\ Q 5b �� p / ^gib— TAL-B 10+43.62, 91.02 RT 9 �P`Z �� � Q0 O �h� RIM EL = 30.87 w `° °`° / o� „\`' °�� 8)_ IE = 28.60 (12 SE) IN/' ~% 0 IE = 28.60 (6" SW) IN • /v '17 IE = 28.10 (12" N) IN -Z IE = 28.10 (12" NE) OUT v\ - 1. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET. 2. ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLES LOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALK SHALL BE FITTED WITH A NON -SLIP OR NON-SKID COVER PER PROJECT SPECIFICATIONS. STORM DRAINAGE NOTES 0 ADJUST INLET OR CATCH BASIN TO GRADE O2 ADJUST MANHOLE TO GRADE O3 ADJUST STORM DRAIN MANHOLE WITH V RISER O4 REMOVE INLET OR CATCH BASIN 05 REMOVE STORM DRAIN PIPE 06 REPLACE GRATE WITH SOLID LOCKING METAL COVER PER CITY OF RENTON PWD STD PLAN 204.10 07 CONNECTION TO EXISTING DRAINAGE STRUCTURE O8 INSTALL CATCH BASIN TYPE 1 PER CITY OF RENTON PWD STD PLAN 200.00 Og INSTALL CATCH BASIN TYPE 2 PER CITY OF RENTON PWD STD PLAN 201.00 10 INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STD PLAN 400.2 00 N rm O O N V 11 INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OF RENTON PWD STD PLAN 203.00 N r 12 INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTON PWD STD PLAN 204.40 O O 13 INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTON O PWD STD PLAN 204.10 r N 14 INSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNIT a 15 INSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNIT 16 INSTALL FLOW CONTROL STRUCTURE PER CITY OF RENTON PWD STD 237.00 0 17 CONNECTION TO EXISTING PIPE to N 18 INSTALL STATION SHELTER DOWNSPOUT THROUGH CURB O DRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02 O O 19 INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING, 4 N PER DETAIL 1, DRAWING NO. 1DRD.03 N a 20 INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OF RENTON PWD STD 240.10 J 21 PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OF EXISTING STORM DRAINAGE PIPE 22 INSTALL CONCRETE INLET PER CITY OF RENTON PWD STD PLAN 200.30 23 INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN 400.1 0' 20' 40' FDEVELOPMENT ENGINEERING �' IL SCALE: 1" = 40' Sippo 09/11 /2024 R-4214195 DESIGNED: APPROVED: METRO TRANSIT CAPITAL DIVISION DATE: AD -READY SUBMITTAL 7 _ B. � J. GREEN G. FRANCO JUNE 2024 acobs1100 i 2TH5AVE NE, SUITE 500 �of DRAWN: � . RAP 1 D RI D E I LINE BELLEVUE, WA 98004 h o King County z H.JOHNSON CHECKED: PROJECT NO: RENTON SEGMENT DRAWING NO: s°���° w J.ETULAIN E00566E18 METRO DRAINAGE PLAN 1 DR.04 No. REVISION BY APP'D DATE SIONAL ��� 06/12/24 CHECKED: CONTRACT NO: GRA 24+00 TO TAL—B 1 4+00 SHEET NO: OF K. CHANG YUEN CXXXXXXXX 1 217 473