Loading...
HomeMy WebLinkAboutR-4214203GENERAL NOTES N O 0 W H 0) z O z w o' J x 3 z O z w J X z O z w X z O z w rr w U Q ry _. 0 N N 00 ry CO m N N z O z w ry z O z w ry 0 X a z O z w ry rK x En Z O F- z w I Z O F- F- C9 x a z O z w ry 3I O X En O ry O i ry X 3 3 'O n z J 3 Q x 0 > N > i O > N - � I >-w 3 m 0 O � m 3 CD 0 = M � c; s U p Y N >o-a i 0 0 NLU Cz Z 3 LU 3 J i � X w ui H LL LU w� Q i 0- xx FA �ti °C rs� gyp, � ` � / 'C � \ AS • k �"? � TpA C �i p�ti � � 'liy 2,0Z,.,s�°G�s� J AD -READY SUBMITTAL No. I REVISION L •A, .O 9os �C BY I APRD I DATE 6 \�6, p0 61- 0,9 F Q /L > 0-, .0 � pAAGS, T i w i Q� c/) J J I w NO PROPOSED DRAINAGE IMPROVEMENTS ON THIS SHEET ON (425) 453-5000 1100 112TH AVE NE, SUITE 500 ,oacobsBELLEVUE, WA 98004 DESIGNED: J. GREEN DRAWN: , z H.JOHNSON CHECKED: W� J. ETULAIN s CHECKED: 06112124 K. CHANG YUEN �6.9 pS6 •,� A C' APPROVED: G. FRANCO PROJECT NO: E00566E18 CONTRACT NO: CxxxxxxXx ' I l00 CO N N 1 I I 36+00 \ I oo S6, C), C A CZ1 `0 0' 20' 40' 1 1 !0 SCALE: 1" = 40' King County METRO 1. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET. 2. ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLES LOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALK SHALL BE FITTED WITH A NON -SLIP OR NON-SKID COVER PER PROJECT SPECIFICATIONS. STORM DRAINAGE NOTES 0 ADJUST INLET OR CATCH BASIN TO GRADE O2 ADJUST MANHOLE TO GRADE O3 ADJUST STORM DRAIN MANHOLE WITH V RISER 40 REMOVE INLET OR CATCH BASIN O5 REMOVE STORM DRAIN PIPE 0 REPLACE GRATE WITH SOLID LOCKING METAL COVER PER CITY OF RENTON PWD STD PLAN 204.10 OCONNECTION TO EXISTING DRAINAGE STRUCTURE O8 INSTALL CATCH BASIN TYPE 1 PER CITY OF RENTON PWD STD PLAN 200.00 Og INSTALL CATCH BASIN TYPE 2 PER CITY OF RENTON PWD STD PLAN 201.00 GINSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STD PLAN 400.2 11 INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OF RENTON PWD STD PLAN 203.00 12 INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTON PWD STD PLAN 204.40 13 INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTON PWD STD PLAN 204.10 GINSTALL 6'x8' MODULAR WETLAND WATER QUALITY UNIT 15 INSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNIT 16 INSTALL FLOW CONTROL STRUCTURE PER CITY OF RENTON PWD STD 237.00 17 CONNECTION TO EXISTING PIPE 18 INSTALL STATION SHELTER DOWNSPOUT THROUGH CURB DRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02 GINSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING, PER DETAIL 1, DRAWING NO. 1DRD.03 20 INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OF RENTON PWD STD 240.10 21 PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OF EXISTING STORM DRAINAGE PIPE 22 INSTALL CONCRETE INLET PER CITY OF RENTON PWD STD PLAN 200.30 23 INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN 400.1 FDEVELOPIMENT ENGINEERING Sippo 09/11/2024 (DI F—R-4214203 METRO TRANSIT CAPITAL DIVISION DATE: RAPIDRIDE I LINE JUNE2024 RENTON SEGMENT DRAWING NO: DRAINAGE PLAN 1 DR.12 CAR 32+00 TO CAR 36+50 SHEET NO: OF 225 473 O N O O 0 N N Q J