Loading...
HomeMy WebLinkAboutT-42140090 z J W U Q X 70 0 z W J X z 0 z W z' z Q U Z X z 0 z W 0 x z 0 z W ry 0 J X z 0 z W X z 0 z W n, X z 0 z W J Q z c� X 0 CV N z 0 z W Of I W P. 0 ry 0 X 0 ry cf)' m N N z 0 F- z W ry z 0 F- F- X 0 z W W J 0 a_ 0 FT X 0 CV O N O p' W W p ry 0 O Y m (z �2 J (6 CU � m E wog boo COo� CD N U C� CD LU p O W O W (D 0 X m 0 W oa-x2Ei s'�ti 5 �v J � Cd S GRADY WAY U) 0 00 J Q F-- LOCATION MAP IB STATION PANEL: # VOLTAGE RATING: 120 VOLTS, 1 PHASE, 2 WIRE BUS RATING: 100 AMPS MAIN BREAKER: 60 AMPS FEED: BOTTOM FAULT CURRENT: 9,300 AMPS INTERRUPTING CAPACITY: 22,000 AMPS CIRCUIT DESCRIPTION VA CKT BRKR TECH PYLON 203 1 1/20 SHELTER LIGHTS 154 2 1/20 SPACE 3 SPACE 4 SPACE 5 SPACE 6 GFCI 180 7 1/20 CONNECTED LOAD = (203+154+180) = 537 VA = 4.475 AMPS AVERAGE CONTINUOUS LOAD = ((203+154)*1.25+180) = 626 VA = 5.219 AMPS AVERAGE METRO RAPIDRIDE SHELTER WIRING SCHEDULE RUN NO. X CONDUIT SIZE SHELTER LIGHTS TECH PYLON GROUND SERVICE PULL TAPE REMARKS 1 2" RGS METRO SERVICE 244 2 2" RGS METRO ELEC. #12-3TC 248 #8G 3 3/4" RGS METRO ELEC. #12-3TC LABEL CONDUCTORS WITH "SHELTER LIGHTS" 4 1" RGS METRO ELEC. 248 #8G LABEL CONDUCTORS WITH "TECH PYLON" 5 1.5" PVC METRO ITS. 1 SPARE 6 2" PVC METRO ITS. 1 SPARE J V KAU T #12-3TC, 248, #8G #12-3TC LJ 2-#8, #8G EX. PSE UNDGR XFMR VAULT EX. UNDGR PWR v EX. PSE SECONDARY JB 2-#4 ELECTRICAL WIRING SCHEMATIC GENERAL NOTES 1. PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION. 2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND UTILITIES AND/OR TREE ROOTS ARE PRESENT. 3. INSTALL SPARE CONNECTIONS FOR FUTURE METRO FIBER OPTIC COMMUNICATION TO THE STATION. 4. SEE 1 S1.09 FOR STATION PLANS AND AMENITIES DETAILS. CONSTRUCTION NOTES OTRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. 3O PROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL SERVICE PEDESTAL. SEE 1 E2.01 FOR MOUNTING AND FOUNDATION DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS SHOWN BY 7" ON THE PLANS. OPROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10-04. LABEL JUNCTION BOX "METRO". OSERVICE POINT. COORDINATE WITH PSE ELECTRICAL SERVICE REPRESENTATIVE FOR CONNECTION TO THE SECONDARY SERVICE JUNCTION BOX (SR# TO BE ISSUED AT A LATER DATE) 0' 10, 20' DEVELOPMENT ENGINEERING SCALE: 1" = 10' Michael Sippo 09/11 /2024 •' T-421409 DESIGNED: APPROVED: METRO TRANSIT CAPITAL DIVISION DATE. JUNE 2024 AD -READY SUBMITTAL ----. yING ZRAPIDRIDE I LINE � A. KING G. FRANCO (425) 453-5000 WAS DRAWN: 1 100 112TH AVE NE, SUITE 500 � � �w °F �j�� Gi � � King County PacobsBELLEVUE, WA 98004 fT S. XIA CHECKED: PROJECT NO: R E N TO N SEGMENT DRAWING NO: �p 4METRO 1 E1.01 `O ��'GISTEg�'9 �' X.ZHANG E00566E18 ELECTRICAL SITE PLAN concord No. REVISION BY APP'D DATE ���`S,:N=:;� � CHECKED: CONTRACT NO:NO: ENGINEERING 6/12/2024 I D# 59841 SHEET 293 OF 473 K. CHANG YUEN icxxxxxxxx 00 N To O O r N U N M r O O O 9 r N a