HomeMy WebLinkAboutT-42140090
z
J
W
U
Q
X
70
0
z
W
J
X
z
0
z
W
z'
z
Q
U
Z
X
z
0
z
W
0
x
z
0
z
W
ry
0
J
X
z
0
z
W
X
z
0
z
W
n,
X
z
0
z
W
J
Q
z
c�
X
0
CV
N
z
0
z
W
Of I
W
P.
0
ry
0
X
0
ry
cf)'
m
N
N
z
0
F-
z
W
ry
z
0
F-
F-
X
0
z
W
W
J
0
a_
0
FT
X
0
CV
O
N
O p'
W
W p
ry
0
O Y m
(z
�2
J (6
CU
� m
E
wog
boo
COo�
CD N U
C� CD LU
p O W
O W
(D
0 X
m 0 W
oa-x2Ei
s'�ti 5
�v
J �
Cd
S GRADY WAY
U)
0
00
J
Q
F--
LOCATION MAP
IB STATION
PANEL: #
VOLTAGE RATING: 120 VOLTS, 1 PHASE, 2 WIRE
BUS RATING: 100 AMPS
MAIN BREAKER: 60 AMPS
FEED: BOTTOM
FAULT CURRENT: 9,300 AMPS
INTERRUPTING CAPACITY: 22,000 AMPS
CIRCUIT DESCRIPTION
VA
CKT
BRKR
TECH PYLON
203
1
1/20
SHELTER LIGHTS
154
2
1/20
SPACE
3
SPACE
4
SPACE
5
SPACE
6
GFCI
180
7
1/20
CONNECTED LOAD = (203+154+180) = 537 VA = 4.475 AMPS AVERAGE
CONTINUOUS LOAD = ((203+154)*1.25+180) = 626 VA =
5.219 AMPS AVERAGE
METRO RAPIDRIDE
SHELTER
WIRING SCHEDULE
RUN NO.
X
CONDUIT SIZE
SHELTER LIGHTS
TECH PYLON
GROUND
SERVICE
PULL TAPE
REMARKS
1
2" RGS METRO SERVICE
244
2
2" RGS METRO ELEC.
#12-3TC
248
#8G
3
3/4" RGS METRO ELEC.
#12-3TC
LABEL CONDUCTORS WITH "SHELTER
LIGHTS"
4
1" RGS METRO ELEC.
248
#8G
LABEL CONDUCTORS WITH "TECH
PYLON"
5
1.5" PVC METRO ITS.
1
SPARE
6
2" PVC METRO ITS.
1
SPARE
J V KAU T
#12-3TC, 248, #8G
#12-3TC
LJ
2-#8, #8G
EX. PSE UNDGR XFMR VAULT
EX. UNDGR PWR
v
EX. PSE SECONDARY JB
2-#4
ELECTRICAL WIRING SCHEMATIC
GENERAL NOTES
1. PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT
TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE
CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION.
2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR
CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND
UTILITIES AND/OR TREE ROOTS ARE PRESENT.
3. INSTALL SPARE CONNECTIONS FOR FUTURE METRO FIBER OPTIC
COMMUNICATION TO THE STATION.
4. SEE 1 S1.09 FOR STATION PLANS AND AMENITIES DETAILS.
CONSTRUCTION NOTES
OTRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH
AND CONDUIT TO AVOID UTILITIES.
3O PROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL
SERVICE PEDESTAL. SEE 1 E2.01 FOR MOUNTING AND FOUNDATION
DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS
SHOWN BY 7" ON THE PLANS.
OPROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT
STANDARD PLAN J-40.10-04. LABEL JUNCTION BOX "METRO".
OSERVICE POINT. COORDINATE WITH PSE ELECTRICAL SERVICE
REPRESENTATIVE FOR CONNECTION TO THE SECONDARY
SERVICE JUNCTION BOX (SR# TO BE ISSUED AT A LATER DATE)
0' 10, 20'
DEVELOPMENT ENGINEERING SCALE: 1" = 10'
Michael Sippo 09/11 /2024 •'
T-421409
DESIGNED: APPROVED: METRO TRANSIT CAPITAL DIVISION DATE. JUNE 2024
AD -READY SUBMITTAL ----.
yING ZRAPIDRIDE I LINE
� A. KING G. FRANCO
(425) 453-5000 WAS DRAWN:
1 100 112TH AVE NE, SUITE 500 � � �w °F �j�� Gi � � King County
PacobsBELLEVUE, WA 98004 fT S. XIA
CHECKED: PROJECT NO: R E N TO N SEGMENT DRAWING NO:
�p 4METRO 1 E1.01
`O ��'GISTEg�'9 �' X.ZHANG E00566E18 ELECTRICAL SITE PLAN
concord
No. REVISION BY APP'D DATE ���`S,:N=:;� � CHECKED: CONTRACT NO:NO:
ENGINEERING 6/12/2024 I D# 59841 SHEET 293 OF 473
K. CHANG YUEN icxxxxxxxx
00
N
To
O
O
r
N
U
N
M
r
O
O
O
9
r
N
a