HomeMy WebLinkAboutT-42140110
z
J
w
U
Q
Or
x
70
z N
0
z
w
Of
z 1
z
Q
U
Z
x
z
0
z
w
ry
0
X
z
0
z
w
ry
0
J
x
z
0
z
w
x
z
0
z
w
n,
x
z
0
z
w
J
Q
z
x
0
CV
N
zi)
z
0
z
w
Of I
w
P.
0
ry
a_
3
0
x
0
ry
cf)'
m
N
N
z
0
F-
z
w
ry
z
0
F-
F-
x
0
z
w
0
w
J
x
0
a_
0
F-
0
CV
O
ry
w
w o
ry
0 m
o Q
_jo�
J (6
CU
� 00
E a'
LU
moo
COo�
CD N U
0 o w
o S w
x
LLI cis
0 ~ W LU
CD
a-Q
ox2Ei
d
S GRADY WAY
w,
44 248, #8G
PER PSE
I
0
PSE PROVIDED #12-3TC, 248, #8G
SECONDARY JB #12-3TC
PSE PROVIDED UNDGR XFMR VAULT
VAULT #317537-165998
ELECTRICAL WIRING SCHEMATIC
LOCATION MAP
U
I
S G RADY WAY 4___11111
STATION 55936 (OB) (GRA-LINE)
TIER 1P P P P - P P P P � 1 4 1
F
-----
i
P ' P _j P _ \
-J
J�
4 QY
1
3(13l
5 p
ELEC
\ PSE PROVIDED METRO RAPIDRIDE
— — - — SECONDARY JB SHELTER METRO TECH PYLON \
PSE PROVIDED UNDGR XFMR VAULTO
VAULT #317537-165998
OB STATION
PANEL: #
VOLTAGE RATING: 120 VOLTS, 1 PHASE, 2 WIRE
BUS RATING: 100 AMPS
MAIN BREAKER: 60 AMPS
FEED: BOTTOM
FAULT CURRENT: 9,300 AMPS
INTERRUPTING CAPACITY: 22,000 AMPS
CIRCUIT DESCRIPTION
VA
CKT
BRKR
TECH PYLON
203
1
1/20
SHELTER LIGHTS
154
2
1/20
SPACE
3
SPACE
4
SPACE
5
SPACE
6
GFCI
180
7
1/20
CONNECTED LOAD = (203+154+180) = 537 VA = 4.475 AMPS AVERAGE
CONTINUOUS LOAD = ((203+154)*1.25+180) = 626 VA =
5.219 AMPS AVERAGE
AD -READY SUBMITTAL
I �
I
I I °
A
I
J
A �
1 C
k j� ITS
w
•
INIR KAM
1 _
I
- lz\i/-
WIRING SCHEDULE
RUN NO.
ZLCONDUIT
SIZE
SHELTER LIGHTS
TECH PYLON
GROUND
SERVICE
PULL TAPE
REMARKS
1
2" RGS METRO SERVICE
244
2
2" RGS METRO ELEC.
#12-3TC
248
#8G
3
3/4" RGS METRO ELEC.
#12-3TC
LABEL CONDUCTORS WITH "SHELTER
LIGHTS"
4
1" RGS METRO ELEC.
248
#8G
LABEL CONDUCTORS WITH "TECH
PYLON"
5
1.5" PVC METRO ITS.
1
SPARE
6
2" PVC METRO ITS.
1
SPARE
7
PER PSE
PER PSE
PROVIDED BY PSE
DESIGNED:
yZNG , �� A. KING
(425) 453-5000 WAS DRAWN:
cob1 100 112TH AVE NE, SUITE 500 �w °F 6, Gl
BELLEVUE, WA 98004 - ti1
- S XIA
No. REVISION BY APP'D DATE concord
ENGINEERING
f y
j
CHECKED:
j !I
Q 4C434 9 ,
�01STS �j
X. ZHANG
ty "
Gti 1
`SIGNAL :1�
CHECKED:
6/12/2024
K. CHANG YUEN
APPROVED:
G.FRANCO
PROJECT NO:
E00566E18
CONTRACT NO:
CXXXXXXXX
LIM King County
METRO
GENERAL NOTES
1. PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT
TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE
CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION.
2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR
CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND
UTILITIES AND/OR TREE ROOTS ARE PRESENT.
3. INSTALL SPARE CONNECTIONS FOR FUTURE METRO FIBER OPTIC
COMMUNICATION TO THE STATION.
4. SEE 1 S1.10 FOR STATION PLANS AND AMENITIES DETAILS.
CONSTRUCTION NOTES
OTRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH
AND CONDUIT TO AVOID UTILITIES.
OPROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL
SERVICE PEDESTAL. SEE 1 E2.01 FOR MOUNTING AND FOUNDATION
DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS
SHOWN BY 7" ON THE PLANS.
OPROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT
STANDARD PLAN J-40.10-04. LABEL JUNCTION BOX "METRO".
OSERVICE POINT. COORDINATE WITH PSE ELECTRICAL SERVICE
REPRESENTATIVE FOR CONNECTION TO THE SECONDARY
SERVICE JUNCTION BOX (SR# TO BE ISSUED AT A LATER DATE).
0' 10, 20'
DEVELOPMENT ENGINEERING SCALE: 1" = 10'
Michael Sippo 09/11 /2024 T-421411
METRO TRANSIT CAPITAL DIVISION DATE:
RAPIDRIDE I LINE JUNE2024
RENTON SEGMENT DRAWING NO:
ELECTRICAL SITE PLAN 1 E1.02
D# 55936 SHEET NO: OF
295 473