Loading...
HomeMy WebLinkAboutT-42140120 z J w U Q _. z O z Nw OfIqJ z O z w ry P4 O O ry 3: O x 0 ry cf)' m N N z O F- z w ry z O F- Q x 0 z w 0 w J x 0 a_ O F- 0 CV 0 N M I O r' w o 0 ry o =o _jo� J (6 CU �m E O w 4N ca moo COo� CD N U M � H 0 o w o S w (D x 0 ~ W LU CD oa-x2Ei 0H� — p — P — p _ p ss ss I TAI RnT Rn S LOCATION MAP PER PSE i i EX. PSE UNDGR XFMR VAULT VAULT #316419-165914 0 W U STATION 59949 (OB) QTIER 1 U_ 0 ~ PSE PROVIDED Lj z OHP- SECONDARYJB — OHP W LU 4 — - -- J z ITS P P P ss ss ss ss G G G G G G G G G 0 s METRO TECH PYLON =I PSE PROVIDED SECONDARYJB SEE LIGHTING PLAN 1 L1.11 2 #12-3TC, 2-#8, #8G -#8, #8G #12-3TC ' F I 2-#4 I PER PSE SEE ELECTRICAL WIRING SCHEMATIC ON 1E1.04 I \%j ED SECONDARYJB ELECTRICAL WIRING SCHEMATIC METRO RAPIDRIDE — SHELTER 1 5 . OHP - OHP � 7 w f 1 � I! C 1 MATCH LINE — SEE SHEET 1E1.04 WIRING SCHEDULE RUN NO. X CONDUIT SIZE SHELTER LIGHTS TECH PYLON GROUND SERVICE PULL TAPE REMARKS 1 2" RGS METRO SERVICE 244 2 2" RGS METRO ELEC. #12-3TC 248 #8G 3 3/4" RGS METRO ELEC. #12-3TC LABEL CONDUCTORS WITH "SHELTER LIGHTS" 4 1" RGS METRO ELEC. 248 #8G LABEL CONDUCTORS WITH "TECH PYLON" 5 1.5" PVC METRO ITS. 1 SPARE 6 2" PVC METRO ITS. 1 SPARE 7 PER PSE PER PSE PROVIDED BY PSE 1 2 (D ELEC _ OHP S ;�'J � RD-S S ss sS — G G G G G OB STATION PANEL: # VOLTAGE RATING: 120 VOLTS, 1 PHASE, 2 WIRE BUS RATING: 100 AMPS MAIN BREAKER: 60 AMPS FEED: BOTTOM FAULT CURRENT: 9,300 AMPS INTERRUPTING CAPACITY: 22,000 AMPS CIRCUIT DESCRIPTION VA CKT BRKR TECH PYLON 203 1 1/20 SHELTER LIGHTS 154 2 1/20 SPACE 3 SPACE 4 SPACE 5 SPACE 6 GFCI 180 7 1/20 CONNECTED LOAD = (203+154+180) = 537 VA = 4.475 AMPS AVERAGE CONTINUOUS LOAD = ((203+154)*1.25+180) =626 VA = 5.219 AMPS AVERAGE DESIGNED: APPROVED: AD -READY SUBMITTAL 7 LNG Z A. KING G. FRANCO (425) 453-5000 Y °F was �`�r•� DRAWN: 1 100 112TH AVE NE, SUITE 500 41 6, Gl ,jacobsBELLEVUE, WA 98004 f 3 S. XIA CHECKED: PROJECT N0: ��, 4C434 �9 o G1STEg X.ZHANG E00566E18 concord�� No. REVISION BY APP'D DATE ���`S,:N=:;� � CHECKED: CONTRACT NO: AAE N G I N E E R INGL 6/12/2024 K. CHANG YUEN CXXXXXXXX King County METRO GENERAL NOTES 1. PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION. 2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND UTILITIES AND/OR TREE ROOTS ARE PRESENT. 3. INSTALL SPARE CONNECTIONS FOR FUTURE METRO FIBER OPTIC COMMUNICATION TO THE STATION. 4. SEE 1 S1.19 FOR STATION PLANS AND AMENITIES DETAILS. CONSTRUCTION NOTES OTRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. 3O PROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL SERVICE PEDESTAL. SEE 1 E2.01 FOR MOUNTING AND FOUNDATION DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS SHOWN BY 7" ON THE PLANS. OPROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10-04. LABEL JUNCTION BOX "METRO". 0' 10, 20' DEVELOPMENT ENGINEERING SCALE: 1" = 10' Michael Sippo 09/11/2024 %�01 F—T-421412 � METRO TRANSIT CAPITAL DIVISION DATE: RAPIDRIDE I LINE JUNE2024 RENTON SEGMENT DRAWING NO: ELECTRICAL SITE PLAN 1 E1.03 D# 59949 SHEET NO: OF 296 473