HomeMy WebLinkAboutT-42140120
z
J
w
U
Q
_.
z
O
z Nw
OfIqJ
z
O
z
w
ry
P4
O
O
ry
3:
O
x
0
ry
cf)'
m
N
N
z
O
F-
z
w
ry
z
O
F-
Q
x
0
z
w
0
w
J
x
0
a_
O
F-
0
CV
0
N
M I
O r'
w o
0 ry
o =o
_jo�
J (6
CU
�m
E
O
w 4N ca
moo
COo�
CD N U
M � H
0 o w
o S w
(D
x
0 ~ W LU
CD
oa-x2Ei
0H�
— p
— P
— p
_ p
ss
ss
I
TAI RnT Rn S
LOCATION MAP
PER PSE
i
i
EX. PSE UNDGR XFMR VAULT
VAULT #316419-165914
0
W
U STATION 59949 (OB)
QTIER 1
U_
0 ~ PSE PROVIDED
Lj z
OHP- SECONDARYJB
— OHP
W LU 4 — - --
J z ITS
P P P
ss ss ss ss
G G G G G
G G G G
0
s
METRO TECH PYLON
=I
PSE PROVIDED
SECONDARYJB
SEE LIGHTING PLAN
1 L1.11 2 #12-3TC, 2-#8, #8G
-#8, #8G #12-3TC
' F
I
2-#4
I
PER PSE
SEE ELECTRICAL WIRING
SCHEMATIC ON 1E1.04
I \%j ED
SECONDARYJB
ELECTRICAL WIRING SCHEMATIC
METRO RAPIDRIDE —
SHELTER
1 5 .
OHP - OHP
� 7
w
f 1
� I! C 1
MATCH LINE — SEE SHEET 1E1.04
WIRING SCHEDULE
RUN NO.
X
CONDUIT SIZE
SHELTER LIGHTS
TECH PYLON
GROUND
SERVICE
PULL TAPE
REMARKS
1
2" RGS METRO SERVICE
244
2
2" RGS METRO ELEC.
#12-3TC
248
#8G
3
3/4" RGS METRO ELEC.
#12-3TC
LABEL CONDUCTORS WITH "SHELTER
LIGHTS"
4
1" RGS METRO ELEC.
248
#8G
LABEL CONDUCTORS WITH "TECH
PYLON"
5
1.5" PVC METRO ITS.
1
SPARE
6
2" PVC METRO ITS.
1
SPARE
7
PER PSE
PER PSE
PROVIDED BY PSE
1
2
(D
ELEC _ OHP
S
;�'J � RD-S
S
ss
sS —
G
G
G
G
G
OB STATION
PANEL: #
VOLTAGE RATING: 120 VOLTS, 1 PHASE, 2 WIRE
BUS RATING: 100 AMPS
MAIN BREAKER: 60 AMPS
FEED: BOTTOM
FAULT CURRENT: 9,300 AMPS
INTERRUPTING CAPACITY: 22,000 AMPS
CIRCUIT DESCRIPTION
VA
CKT
BRKR
TECH PYLON
203
1
1/20
SHELTER LIGHTS
154
2
1/20
SPACE
3
SPACE
4
SPACE
5
SPACE
6
GFCI
180
7
1/20
CONNECTED LOAD = (203+154+180) = 537 VA = 4.475 AMPS AVERAGE
CONTINUOUS LOAD = ((203+154)*1.25+180) =626 VA =
5.219 AMPS AVERAGE
DESIGNED: APPROVED:
AD -READY SUBMITTAL 7 LNG Z A. KING G. FRANCO
(425) 453-5000 Y
°F was �`�r•� DRAWN:
1 100 112TH AVE NE, SUITE 500 41 6, Gl
,jacobsBELLEVUE, WA 98004 f 3 S. XIA
CHECKED: PROJECT N0:
��, 4C434 �9
o G1STEg X.ZHANG E00566E18
concord��
No. REVISION BY APP'D DATE ���`S,:N=:;� � CHECKED: CONTRACT NO:
AAE N G I N E E R INGL 6/12/2024
K. CHANG YUEN CXXXXXXXX
King County
METRO
GENERAL NOTES
1. PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT
TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE
CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION.
2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR
CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND
UTILITIES AND/OR TREE ROOTS ARE PRESENT.
3. INSTALL SPARE CONNECTIONS FOR FUTURE METRO FIBER OPTIC
COMMUNICATION TO THE STATION.
4. SEE 1 S1.19 FOR STATION PLANS AND AMENITIES DETAILS.
CONSTRUCTION NOTES
OTRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH
AND CONDUIT TO AVOID UTILITIES.
3O PROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL
SERVICE PEDESTAL. SEE 1 E2.01 FOR MOUNTING AND FOUNDATION
DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS
SHOWN BY 7" ON THE PLANS.
OPROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT
STANDARD PLAN J-40.10-04. LABEL JUNCTION BOX "METRO".
0' 10, 20'
DEVELOPMENT ENGINEERING SCALE: 1" = 10'
Michael Sippo 09/11/2024 %�01 F—T-421412
� METRO TRANSIT CAPITAL DIVISION DATE:
RAPIDRIDE I LINE JUNE2024
RENTON SEGMENT DRAWING NO:
ELECTRICAL SITE PLAN 1 E1.03
D# 59949 SHEET NO: OF
296 473