Loading...
HomeMy WebLinkAboutT-4214013J Q Z X -SD - i L1J 90+00 - — > 0 m w W bi 0 Cn T T — W J 0 T T Q � a w EX. PSE UNDGR XFMR VAULT VAULT #316419-165914 LOCATION MAP PER PSE v SEE ELECTRICAL WIRING SCHEMATIC ON 1E1.03 2-#4 PSE PROVIDED SECONDARY JB #12-3TC, 248, #8G ELECTRICAL WIRING SCHEMATIC TALBOT RD S 91+00 (TAL-B-LINE) - - o —w w E__� J w w /LJ�LJ� W C W o ILL] 7 v) T T T T T SD su S D � -)IF LLI su EX. PSE UNDGR XFMR VAULT 5 VAULT #316419-165914 T w — SD z J T T T T T U \ C) � Q 3S MATCH LINE - SEE SHEET 1 E1.03 I C/) U ILL] J J Z 7 Q W T — �_�_■ EWA! SS S Z7 SS DU PSE PROVIDED - SECONDARY JB w l I I w I 1 1 6 1 I I TALBOT RD S &mR (TAL-B-LINE) EE I 1 3 5 1 METRO RAPIDRIDE SHELTER AD -READY SUBMITTAL 7 (425) 453-5000 jacobs 1100 112TH AVE NE, SUITE 500 BELLEVUE, WA 98004 No. REVISION BY APP'D DATE concord ENGINEERING DESIGNED: , • - - , YZNG A. KING �� pF WAS�rj�`�V� DRAWN: 41 Go3 S. XIA j j !I CHECKED: 4>_ 4C434 � , , .0, OISTEg X. ZHANG S`SIONAL 1� •', CHECKED: w w v 6/12/2024 K. CHANG YUEN 2-#8, #8G 12-3TC GENERAL NOTES 1. PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION. 2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND UTILITIES AND/OR TREE ROOTS ARE PRESENT. 3. INSTALL SPARE CONNECTIONS FOR FUTURE METRO FIBER OPTIC COMMUNICATION TO THE STATION. 4. SEE 1S1.20 FOR STATION PLANS AND AMENITIES DETAILS. CONSTRUCTION NOTES 10 TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. O3 PROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL SERVICE PEDESTAL. SEE 1 E2.01 FOR MOUNTING AND FOUNDATION DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS SHOWN BY "F" ON THE PLANS. 4O PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10-04. LABEL JUNCTION BOX "METRO". SERVICE POINT. COORDINATE WITH PSE ELECTRICAL SERVICE T REPRESENTATIVE FOR CONNECTION TO THE SECONDARY SERVICE JUNCTION BOX (SR# TO BE ISSUED AT A LATER DATE). WIRING SCHEDULE RUN NO. ZL CONDUIT SIZE SHELTER LIGHTS TECH PYLON GROUND SERVICE PULL TAPE REMARKS 1 2" RGS METRO SERVICE 244 2 2" RGS METRO ELEC. #12-3TC 248 #8G RGS METRO ELEC. #12-3TC LABEL CONDUCTORS WITH "SHELTER LIGHTS" 4 1" RGS METRO ELEC. 2-#8 #8G LABEL CONDUCTORS WITH "TECH PYLON" 5 1.5" PVC METRO ITS. 1 SPARE 6 2" PVC METRO ITS. 1 SPARE 7 PER PSE PER PSE PROVIDED BY PSE STATION 60361 (IB) TIER 1 .J METRO TECH PYLON I APPROVED: G.FRANCO PROJECT NO: E00566E18 CONTRACT NO: CXXXXXXXX IB STATION PANEL: # VOLTAGE RATING: 120 VOLTS, 1 PHASE, 2 WIRE BUS RATING: 100 AMPS MAIN BREAKER: 60 AMPS FEED: BOTTOM FAULT CURRENT: 9,300 AMPS INTERRUPTING CAPACITY: 22,000 AMPS CIRCUIT DESCRIPTION VA CKT BRKR TECH PYLON 203 1 1/20 SHELTER LIGHTS 154 2 1/20 SPACE 3 SPACE 4 SPACE 5 SPACE 6 GFCI 1 180 7 1/20 CONNECTED LOAD = (203+154+180) = 537 VA = 4.475 AMPS AVERAGE CONTINUOUS LOAD = ((203+154)*1.25+180) = 626 VA = 5.219 AMPS AVERAGE 114 King County METRO DEVELOPMENT ENGINEERING Michael Sippo 09/11/2024 ' METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT ELECTRICAL SITE PLAN I D# 60361 0' 10, 20' SCALE: 1" = 10' T-421413 DATE: JUNE 2024 DRAWING NO: 1E1.04 SHEET NO: OF 297 473