HomeMy WebLinkAboutT-4214013J
Q
Z
X
-SD -
i
L1J 90+00 - —
>
0
m w
W
bi
0
Cn
T T —
W
J
0 T T
Q
� a
w
EX. PSE UNDGR XFMR VAULT
VAULT #316419-165914
LOCATION MAP
PER PSE
v
SEE ELECTRICAL WIRING
SCHEMATIC ON 1E1.03
2-#4
PSE PROVIDED
SECONDARY JB #12-3TC, 248, #8G
ELECTRICAL WIRING SCHEMATIC
TALBOT RD S
91+00 (TAL-B-LINE) - - o
—w w E__� J
w w /LJ�LJ�
W
C W
o ILL]
7 v)
T T T T T
SD su
S D � -)IF
LLI
su
EX. PSE UNDGR XFMR VAULT 5
VAULT #316419-165914
T
w
— SD z
J
T T T T T U
\ C) � Q
3S
MATCH LINE - SEE SHEET 1 E1.03
I C/)
U
ILL] J
J Z 7
Q W
T —
�_�_■
EWA!
SS
S Z7
SS
DU
PSE PROVIDED -
SECONDARY JB
w
l
I
I
w
I 1 1 6 1
I
I
TALBOT RD S
&mR
(TAL-B-LINE)
EE
I
1 3 5 1
METRO RAPIDRIDE
SHELTER
AD -READY SUBMITTAL 7
(425) 453-5000
jacobs
1100 112TH AVE NE, SUITE 500
BELLEVUE, WA 98004
No. REVISION BY APP'D DATE concord
ENGINEERING
DESIGNED:
, • - - ,
YZNG
A. KING
��
pF WAS�rj�`�V�
DRAWN:
41
Go3
S. XIA
j
j !I
CHECKED:
4>_ 4C434 � , ,
.0, OISTEg
X. ZHANG
S`SIONAL 1�
•',
CHECKED:
w w v 6/12/2024
K. CHANG YUEN
2-#8, #8G
12-3TC
GENERAL NOTES
1. PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT
TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE
CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION.
2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR
CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND
UTILITIES AND/OR TREE ROOTS ARE PRESENT.
3. INSTALL SPARE CONNECTIONS FOR FUTURE METRO FIBER OPTIC
COMMUNICATION TO THE STATION.
4. SEE 1S1.20 FOR STATION PLANS AND AMENITIES DETAILS.
CONSTRUCTION NOTES
10 TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH
AND CONDUIT TO AVOID UTILITIES.
O3 PROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL
SERVICE PEDESTAL. SEE 1 E2.01 FOR MOUNTING AND FOUNDATION
DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS
SHOWN BY "F" ON THE PLANS.
4O PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT
STANDARD PLAN J-40.10-04. LABEL JUNCTION BOX "METRO".
SERVICE POINT. COORDINATE WITH PSE ELECTRICAL SERVICE
T
REPRESENTATIVE FOR CONNECTION TO THE SECONDARY SERVICE
JUNCTION BOX (SR# TO BE ISSUED AT A LATER DATE).
WIRING SCHEDULE
RUN NO.
ZL
CONDUIT SIZE
SHELTER LIGHTS
TECH PYLON
GROUND
SERVICE
PULL TAPE
REMARKS
1
2" RGS METRO SERVICE
244
2
2" RGS METRO ELEC.
#12-3TC
248
#8G
RGS METRO ELEC.
#12-3TC
LABEL CONDUCTORS WITH "SHELTER
LIGHTS"
4
1" RGS METRO ELEC.
2-#8
#8G
LABEL CONDUCTORS WITH "TECH
PYLON"
5
1.5" PVC METRO ITS.
1
SPARE
6
2" PVC METRO ITS.
1
SPARE
7
PER PSE
PER PSE
PROVIDED BY PSE
STATION 60361 (IB)
TIER 1
.J
METRO TECH PYLON
I
APPROVED:
G.FRANCO
PROJECT NO:
E00566E18
CONTRACT NO:
CXXXXXXXX
IB STATION
PANEL: #
VOLTAGE RATING: 120 VOLTS, 1 PHASE, 2 WIRE
BUS RATING: 100 AMPS
MAIN BREAKER: 60 AMPS
FEED: BOTTOM
FAULT CURRENT: 9,300 AMPS
INTERRUPTING CAPACITY: 22,000 AMPS
CIRCUIT DESCRIPTION
VA
CKT
BRKR
TECH PYLON
203
1
1/20
SHELTER LIGHTS
154
2
1/20
SPACE
3
SPACE
4
SPACE
5
SPACE
6
GFCI
1 180
7
1/20
CONNECTED LOAD = (203+154+180) = 537 VA = 4.475 AMPS AVERAGE
CONTINUOUS LOAD = ((203+154)*1.25+180) = 626 VA =
5.219 AMPS AVERAGE
114
King County
METRO
DEVELOPMENT ENGINEERING
Michael Sippo 09/11/2024 '
METRO TRANSIT CAPITAL DIVISION
RAPIDRIDE I LINE
RENTON SEGMENT
ELECTRICAL SITE PLAN
I D# 60361
0' 10, 20'
SCALE: 1" = 10'
T-421413
DATE:
JUNE 2024
DRAWING NO:
1E1.04
SHEET NO: OF
297 473