HomeMy WebLinkAboutT-4214014CV
N
00
M"
a
Z
O
F-
z
w
Of
a
z
O
z
w
ry
0
X
z
O
z
w
rr
X
z
O
Z
w
o�
J
X
a
z
O
z
w
X
z�
3
z
O
z
w
J
X
a
z
O
z
w
Of I
Ly
X
3
O
ry
3
O
X
0
z
w
w
J
X
0
ry
m
Cn
N
CV
z
O
z
w
z
O
Cl?
X
z
c�
J
Q
X
0
N
O
N
ry
w
0
ry
O
LO
0
o U
w Y
0
(zo
J (6 �
A Oi
a m Cn
oEF-
U
F-
LU
w
a)00
_
C—
D N X
�� j�:
0 o O
O
m LU
~ W O
oa-x2Ei
CO
�J
y�
SE
CARR RD
✓V
Q�
tt�A�
7
LOCATION MAP
SD
SD
METRO TECH PYLON
STATION 60321 (IB)
TIER 1
4
El%
T
L J
2-#8, #8G
3 2 1
1 3
4
METRO RAPIDRIDE ELEC 4
SHELTER ELEC—�- �
1 ° ITS
5
1 1
r - 1
`♦ ' I r
♦ . I I
rr
I ♦ I — -
I i ♦ I
I�' `♦I I I I
SE CARR RD
III
I I
I I 1
I
I
1 2
I
II
I
i \
I
44+00 I I
45+00
— _
I
I
II
MATCH LINE - SEE SHEET 1 E1.06
WIRING SCHEDULE
RUN NO.
CONDUIT SIZE
SHELTER LIGHTS
TECH
GROUND
SERVICE
PULL TAPE
REMARKS
Ax
PYLON
1
2" RGS METRO SERVICE
241
2
2" RGS METRO ELEC.
#12-3TC
248
#8G
3
3/4" RGS METRO ELEC.
#12-3TC
LABEL CONDUCTORS WITH
"SHELTER LIGHTS"
4
1" RGS METRO ELEC.
248
#8G
LABEL CONDUCTORS WITH "TECH
PYLON"
5
1.5" PVC METRO ITS.
1
SPARE
6
2" PVC METRO ITS.
1
SPARE
#12-3TC, 248, #8G
#12-3TC
2-#1
IF
__ i
I
I
4-#1
SEE ELECTRICAL WIRING
SCHEMATIC ON 1 E1.06
VAULT #316486-166213
ELECTRICAL WIRING SCHEMATIC
GENERAL NOTES
1. PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT
TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE
CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION.
2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR
CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND
UTILITIES AND/OR TREE ROOTS ARE PRESENT.
3. INSTALL SPARE CONNECTIONS FOR FUTURE METRO FIBER OPTIC
COMMUNICATION TO THE STATION.
4. SEE 1S1.24 FOR STATION PLANS AND AMENITIES DETAILS.
CONSTRUCTION NOTES
1O TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH
AND CONDUIT TO AVOID UTILITIES.
O2 BORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES AS
NEEDED. RESTORE AREA BY BORING OPERATIONS BACK TO
PRECONSTRUCTION CONDITION.
O3 PROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL
SERVICE PEDESTAL. SEE 1 E2.01 FOR MOUNTING AND FOUNDATION
DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS
SHOWN BY "F" ON THE PLANS.
4O PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT
STANDARD PLAN J-40.10-04. LABEL JUNCTION BOX "METRO".
EX. PSE SERVICE POLE
POLE #316487-166212
PER PSE
IB STATION
PANEL: #
VOLTAGE RATING: 120 VOLTS, 1 PHASE, 2 WIRE
BUS RATING: 100 AMPS
MAIN BREAKER: 60 AMPS
FEED: BOTTOM
FAULT CURRENT: 9,300 AMPS
INTERRUPTING CAPACITY: 22,000 AMPS
CIRCUIT DESCRIPTION
VA
CKT
BRKR
TECH PYLON
203
1
1/20
SHELTER LIGHTS
154
2
1/20
SPACE
3
SPACE
4
SPACE
5
SPACE
6
GFCI
180
7
1/20
CONNECTED LOAD = (203+154+180) = 537 VA = 4.475 AMPS AVERAGE
CONTINUOUS LOAD = ((203+154)*1.25+180) = 626 VA =
5.219 AMPS AVERAGE
DESIGNED: APPROVED:
AD -READY SUBMITTAL 7 Z A KING G FRANCO
(425) 453-5000Y was �r•� DRAWN:
1 100 112TH AVE NE, SUITE 500 �w °F h'j�cGl
,jacobsBELLEVUE, WA 98004 f 3 S. XIA
CHECKED: PROJECT N0:
"V ��, 4C434 �9
o G1STEg X.ZHANG E00566E18
concord
No. REVISION BY APP'D DATE ���`S,:N=:;� � CHECKED: CONTRACT NO:
LAE N G I N E E R I N G 6/12/2024
K. CHANG YUEN CXXXXXXXX
L14 King County
METRO
0' 10, 20'
DEVELOPMENT ENGINEERING
SCALE: 1" = 10'
Michael Sippo 09/11 /2024 T-421414
METRO TRANSIT CAPITAL DIVISION DATE:
RAPIDRIDE I LINE JUNE2024
RENTON SEGMENT DRAWING NO:
ELECTRICAL SITE PLAN 1 E1.05
D# 60321 SHEET NO: OF
298 473