Loading...
HomeMy WebLinkAboutT-4214014CV N 00 M" a Z O F- z w Of a z O z w ry 0 X z O z w rr X z O Z w o� J X a z O z w X z� 3 z O z w J X a z O z w Of I Ly X 3 O ry 3 O X 0 z w w J X 0 ry m Cn N CV z O z w z O Cl? X z c� J Q X 0 N O N ry w 0 ry O LO 0 o U w Y 0 (zo J (6 � A Oi a m Cn oEF- U F- LU w a)00 _ C— D N X �� j�: 0 o O O m LU ~ W O oa-x2Ei CO �J y� SE CARR RD ✓V Q� tt�A� 7 LOCATION MAP SD SD METRO TECH PYLON STATION 60321 (IB) TIER 1 4 El% T L J 2-#8, #8G 3 2 1 1 3 4 METRO RAPIDRIDE ELEC 4 SHELTER ELEC—�- � 1 ° ITS 5 1 1 r - 1 `♦ ' I r ♦ . I I rr I ♦ I — - I i ♦ I I�' `♦I I I I SE CARR RD III I I I I 1 I I 1 2 I II I i \ I 44+00 I I 45+00 — _ I I II MATCH LINE - SEE SHEET 1 E1.06 WIRING SCHEDULE RUN NO. CONDUIT SIZE SHELTER LIGHTS TECH GROUND SERVICE PULL TAPE REMARKS Ax PYLON 1 2" RGS METRO SERVICE 241 2 2" RGS METRO ELEC. #12-3TC 248 #8G 3 3/4" RGS METRO ELEC. #12-3TC LABEL CONDUCTORS WITH "SHELTER LIGHTS" 4 1" RGS METRO ELEC. 248 #8G LABEL CONDUCTORS WITH "TECH PYLON" 5 1.5" PVC METRO ITS. 1 SPARE 6 2" PVC METRO ITS. 1 SPARE #12-3TC, 248, #8G #12-3TC 2-#1 IF __ i I I 4-#1 SEE ELECTRICAL WIRING SCHEMATIC ON 1 E1.06 VAULT #316486-166213 ELECTRICAL WIRING SCHEMATIC GENERAL NOTES 1. PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION. 2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND UTILITIES AND/OR TREE ROOTS ARE PRESENT. 3. INSTALL SPARE CONNECTIONS FOR FUTURE METRO FIBER OPTIC COMMUNICATION TO THE STATION. 4. SEE 1S1.24 FOR STATION PLANS AND AMENITIES DETAILS. CONSTRUCTION NOTES 1O TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. O2 BORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES AS NEEDED. RESTORE AREA BY BORING OPERATIONS BACK TO PRECONSTRUCTION CONDITION. O3 PROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL SERVICE PEDESTAL. SEE 1 E2.01 FOR MOUNTING AND FOUNDATION DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS SHOWN BY "F" ON THE PLANS. 4O PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10-04. LABEL JUNCTION BOX "METRO". EX. PSE SERVICE POLE POLE #316487-166212 PER PSE IB STATION PANEL: # VOLTAGE RATING: 120 VOLTS, 1 PHASE, 2 WIRE BUS RATING: 100 AMPS MAIN BREAKER: 60 AMPS FEED: BOTTOM FAULT CURRENT: 9,300 AMPS INTERRUPTING CAPACITY: 22,000 AMPS CIRCUIT DESCRIPTION VA CKT BRKR TECH PYLON 203 1 1/20 SHELTER LIGHTS 154 2 1/20 SPACE 3 SPACE 4 SPACE 5 SPACE 6 GFCI 180 7 1/20 CONNECTED LOAD = (203+154+180) = 537 VA = 4.475 AMPS AVERAGE CONTINUOUS LOAD = ((203+154)*1.25+180) = 626 VA = 5.219 AMPS AVERAGE DESIGNED: APPROVED: AD -READY SUBMITTAL 7 Z A KING G FRANCO (425) 453-5000Y was �r•� DRAWN: 1 100 112TH AVE NE, SUITE 500 �w °F h'j�cGl ,jacobsBELLEVUE, WA 98004 f 3 S. XIA CHECKED: PROJECT N0: "V ��, 4C434 �9 o G1STEg X.ZHANG E00566E18 concord No. REVISION BY APP'D DATE ���`S,:N=:;� � CHECKED: CONTRACT NO: LAE N G I N E E R I N G 6/12/2024 K. CHANG YUEN CXXXXXXXX L14 King County METRO 0' 10, 20' DEVELOPMENT ENGINEERING SCALE: 1" = 10' Michael Sippo 09/11 /2024 T-421414 METRO TRANSIT CAPITAL DIVISION DATE: RAPIDRIDE I LINE JUNE2024 RENTON SEGMENT DRAWING NO: ELECTRICAL SITE PLAN 1 E1.05 D# 60321 SHEET NO: OF 298 473