Loading...
HomeMy WebLinkAboutT-4214015CV N C2 a Z 0 z w 0 X z 0 z w Of 1 z Q O Z X a Z 0 z w Of J Q Z CO P-4 a z 0 z w ry 3 0 X a z 0 z w X a z 0 z w o' J X 3 z 0 z w CO 3 z 0 z w J X a z 0 z w Of I w X 0 ry a_ 3 0 X 0 z w w J x a 0 ry m N CV a z 0 z w z 0 Q X a z c� J Q X 0 N O N ry w 0 ry 0 m 0 o U w Y 0 (z J � � A O a m col oEF- N Q � U w F- v w w m 00 ,0o� _ o N X CO � � a N 0 0 0 (�o X m 0 W 0 o a- x 2Ei �J SE PARR RD � G , �V tt'AA`` �OvJ #12-3TC, 248, #8G LOCATION MAP 2-#1 2-#8, #8G SEE ELECTRICAL WIRING SCHEMATIC ON 1 E1.05 4-#1 PSE PROVIDED SECONDARY JB PER PSE PSE PROVIDED SECONDARYJB PER PSE PSE PROVIDED UNDGR XFMR VAULT , VAULT #316486-166213 ELECTRICAL WIRING SCHEMATIC EX. F POLE PER P MATCH LINE - SEE SHEET 1 E1.05 GENERAL NOTES 1. PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION. 2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND UTILITIES AND/OR TREE ROOTS ARE PRESENT. 3. INSTALL SPARE CONNECTIONS FOR FUTURE METRO FIBER OPTIC COMMUNICATION TO THE STATION. 4. SEE 1S1.23 FOR STATION PLANS AND AMENITIES DETAILS. CONSTRUCTION NOTES 1O TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. 2O BORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES AS IN NEEDED. RESTORE AREA BY BORING OPERATIONS BACK TO r PRECONSTRUCTION CONDITION. r O O O3 PROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL r SERVICE PEDESTAL. SEE 1 E2.01 FOR MOUNTING AND FOUNDATION N DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS C� SHOWN BY "F" ON THE PLANS. 4O PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10-04. LABEL JUNCTION BOX "METRO". OSERVICE POINT. COORDINATE WITH PSE ELECTRICAL SERVICE REPRESENTATIVE FOR CONNECTION TO THE SECONDARY SERVICE JUNCTION BOX (SR# TO BE ISSUED AT A LATER DATE). SERVICE POLE 16487-166212 0' 10, 20' DEVELOPMENT ENGINEERING SCALE: 1" - 10' ' Michael Sippo 09/11 /2024 T-421All 5 AD -READY SUBMITTAL DESIGNED: APPROVED: METRO TRANSIT CAPITAL DIVISION DATE. JUNE 2024 ----. (425) 453-5000 yING Z� A. KING G. FRANCO RAP I D R I D E I LINE � � `�r� 1 100 112TH AVE NE, SUITE 500 � � 4,°F was �Gi � DRAWN: La King County ,jacobsBELLEVUE, WA 98004 fT S. XIA CHECKED: PROJECT N0: R E N TO N SEGMENT DRAWING N0: �p 4METRO 1E1.06 `O ��'GISTEgI X.ZHANG E00566E18 ELECTRICAL SITE PLAN concord I I LA No. REVISION BY APP'D DATE ���`S,:N==;� � CHECKED: CONTRACT NO: ENGINEERING I D# 59391 SHEET 2g9 OF 473 6/12/2024 K. CHANG YUEN CXXXXXXXX WIRING SCHEE RUN NO. Z CONDUIT SIZE SHELTER LIGHTS TECH PYLON GROUN 1 2" RGS METRO SERVICE 2 2" RGS METRO ELEC. #12-3TC 248 #8G 3 3/4" RGS METRO ELEC. #12-3TC 4 1" RGS METRO ELEC. 248 #8G 5 1.5" PVC METRO ITS. 6 2" PVC METRO ITS. 7 PER PSE 8 2" RGS METRO SERVICE