HomeMy WebLinkAboutT-4214015CV
N
C2
a
Z
0
z
w
0
X
z
0
z
w
Of 1
z
Q
O
Z
X
a
Z
0
z
w
Of
J
Q
Z
CO
P-4
a
z
0
z
w
ry
3
0
X
a
z
0
z
w
X
a
z
0
z
w
o'
J
X
3
z
0
z
w
CO
3
z
0
z
w
J
X
a
z
0
z
w
Of I
w
X
0
ry
a_
3
0
X
0
z
w
w
J
x
a
0
ry
m
N
CV
a
z
0
z
w
z
0
Q
X
a
z
c�
J
Q
X
0
N
O
N
ry
w
0
ry
0
m
0
o U
w Y
0
(z
J � �
A O
a m col
oEF-
N Q �
U
w F-
v w
w
m
00
,0o�
_
o N X
CO � �
a N
0 0 0
(�o
X
m 0 W 0
o a- x 2Ei
�J
SE PARR RD
� G ,
�V
tt'AA``
�OvJ
#12-3TC, 248, #8G
LOCATION MAP
2-#1
2-#8, #8G
SEE ELECTRICAL WIRING
SCHEMATIC ON 1 E1.05
4-#1
PSE PROVIDED
SECONDARY JB PER PSE
PSE PROVIDED
SECONDARYJB
PER PSE
PSE PROVIDED UNDGR XFMR VAULT ,
VAULT #316486-166213
ELECTRICAL WIRING SCHEMATIC
EX. F
POLE
PER P
MATCH LINE - SEE SHEET 1 E1.05
GENERAL NOTES
1. PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT
TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE
CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION.
2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR
CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND
UTILITIES AND/OR TREE ROOTS ARE PRESENT.
3. INSTALL SPARE CONNECTIONS FOR FUTURE METRO FIBER OPTIC
COMMUNICATION TO THE STATION.
4. SEE 1S1.23 FOR STATION PLANS AND AMENITIES DETAILS.
CONSTRUCTION NOTES
1O TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH
AND CONDUIT TO AVOID UTILITIES.
2O BORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES AS IN
NEEDED. RESTORE AREA BY BORING OPERATIONS BACK TO r
PRECONSTRUCTION CONDITION. r
O
O
O3 PROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL r
SERVICE PEDESTAL. SEE 1 E2.01 FOR MOUNTING AND FOUNDATION N
DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS C�
SHOWN BY "F" ON THE PLANS.
4O PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT
STANDARD PLAN J-40.10-04. LABEL JUNCTION BOX "METRO".
OSERVICE POINT. COORDINATE WITH PSE ELECTRICAL SERVICE
REPRESENTATIVE FOR CONNECTION TO THE SECONDARY SERVICE
JUNCTION BOX (SR# TO BE ISSUED AT A LATER DATE).
SERVICE POLE
16487-166212
0' 10, 20'
DEVELOPMENT ENGINEERING SCALE: 1" - 10'
' Michael Sippo 09/11 /2024 T-421All 5
AD -READY SUBMITTAL
DESIGNED: APPROVED: METRO TRANSIT CAPITAL DIVISION DATE. JUNE 2024
----.
(425) 453-5000
yING Z� A. KING G. FRANCO RAP I D R I D E I LINE
� � `�r�
1 100 112TH AVE NE, SUITE 500 � � 4,°F was �Gi � DRAWN: La King County ,jacobsBELLEVUE, WA 98004 fT S. XIA
CHECKED: PROJECT N0: R E N TO N SEGMENT DRAWING N0:
�p 4METRO 1E1.06
`O ��'GISTEgI X.ZHANG E00566E18 ELECTRICAL SITE PLAN
concord
I I LA No. REVISION BY APP'D DATE ���`S,:N==;� � CHECKED: CONTRACT NO:
ENGINEERING I D# 59391 SHEET 2g9 OF 473
6/12/2024
K. CHANG YUEN CXXXXXXXX
WIRING SCHEE
RUN NO.
Z
CONDUIT SIZE
SHELTER LIGHTS
TECH
PYLON
GROUN
1
2" RGS METRO SERVICE
2
2" RGS METRO ELEC.
#12-3TC
248
#8G
3
3/4" RGS METRO ELEC.
#12-3TC
4
1" RGS METRO ELEC.
248
#8G
5
1.5" PVC METRO ITS.
6
2" PVC METRO ITS.
7
PER PSE
8
2" RGS METRO SERVICE