Loading...
HomeMy WebLinkAboutT-4214018CV N C2 a Z O z w a Z O z w ry 3 O X z O z w rr X z O z w o' J X z O z w CO a z O z w J X a z O z w Of I W X 0 3 a O ry a_ 3 O X a 0 Z W (D W J X a 0 W ry m N CV a z O z w z O Q X a z c� J Q X 0 N O N Q_' W 0 ry O 00 0 o U w Y 0 a (a o J (6 � A Oi a m co of N Q � rn U L1J M W 7: ED a) _ 00 ,oC�) C- D N X �� j�: 0 o O o CL (�:O m0w� Q o a- xx 2Ei LLI u) LLl LLLLJ = II­__ 00 0 SE 180TH ST -- — — — — — — F #12-3TC, 248, #8G #12-3TC 248, #8G LOCATION MAP MATCH LINE - SEE SHEET 1 E1.07 1 1 SE 180TH ST I 6 I �GF - \ 6 1 3 1 — — — 5 ilR 4 /� ITS METRO RAPIDRIDE SHELTER 4 1 ELEC 2 1 3 STATION 60323 (OB) TIER 2 n: 1 SEE ELECTRICAL WIRING SCHEMATIC ON 1 E1.07 2-#4 ELECTRICAL WIRING SCHEMATIC S PSE PROVIDED SECONDARYJB 4 --X----04 1 ❑ METRO TECH PYLON ITS TEL =:!*-mq= 1.06-flam 0 =_ WIRING SCHEDULE RUN NO. �X CONDUIT SIZE SHELTER LIGHTS I TECH I PYLON GROUND SERVICE PULL TAPE REMARKS 1 2" RGS METRO SERVICE 244 2 2" RGS METRO ELEC. #12-3TC 248 #8G 3 3/4" RGS METRO ELEC. #12-3TC LABEL CONDUCTORS WITH "SHELTER LIGHTS" 4 1" RGS METRO ELEC. 248 #8G LABEL CONDUCTORS WITH "TECH PYLON" 5 1.5" PVC METRO ITS. 1 SPARE 6 2" PVC METRO ITS. 1 SPARE 7 PER PSE PER PSE PROVIDED BY PSE 0 PSE PROVIDED SECONDARY SECONDARY JB DESIGNED: APPROVED: AD -READY SUBMITTAL 7 INAL GZ A KING G FRANCO (425) 453-5000Y of was �`�r•� DRAWN: 1 100 112TH AVE NE, SUITE 500 •�. 41 kj�� ,oacobsBELLEVUE, WA 98004 91 $ 3 S. XIA CHECKED: PROJECT NO: o CISTEg X.ZHANG E00566E18 concord ���`SIONAL �1� CHECKED: CONTRACT NO: No. REVISION BY APP D DATE ENGINEERING , w 6/12/2024 K. CHANG YUEN CXXXXXXXX 0 PER PSE EX. PSE SERVICE POLE POLE #316392-166291 TR X 0 m OB STATION PANEL: # VOLTAGE RATING: 120 VOLTS, 1 PHASE, 2 WIRE BUS RATING: 100 AMPS MAIN BREAKER: 60 AMPS FEED: BOTTOM FAULT CURRENT: 9,300 AMPS INTERRUPTING CAPACITY: 22,000 AMPS CIRCUIT DESCRIPTION VA CKT BRKR TECH PYLON 203 1 1/20 SHELTER LIGHTS 154 2 1/20 SPACE 3 SPACE 4 SPACE 5 SPACE 6 GFCI 180 7 1/20 CONNECTED LOAD = (203+154+180) = 537 VA = 4.475 AMPS AVERAGE CONTINUOUS LOAD = ((203+154)*1.25+180) = 626 VA = 5.219 AMPS AVERAGE LIM King County METRO GENERAL NOTES 1. PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION. 2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND UTILITIES AND/OR TREE ROOTS ARE PRESENT. 3. INSTALL SPARE CONNECTIONS FOR FUTURE METRO FIBER OPTIC COMMUNICATION TO THE STATION. 4. SEE 1S1.26 FOR STATION PLANS AND AMENITIES DETAILS. CONSTRUCTION NOTES 1O TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. O3 PROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL SERVICE PEDESTAL. SEE 1 E2.01 FOR MOUNTING AND FOUNDATION DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS SHOWN BY "F" ON THE PLANS. 4O PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10-04. LABEL JUNCTION BOX "METRO". OSERVICE POINT. COORDINATE WITH PSE ELECTRICAL SERVICE REPRESENTATIVE FOR CONNECTION TO THE SECONDARY SERVICE JUNCTION BOX (SR# TO BE ISSUED AT A LATER DATE). N 0' 10, 20' DEVELOPMENT ENGINEERING SCALE: 1" - 10' Michael Sippo 09/11 /2024 T-421418 METRO TRANSIT CAPITAL DIVISION DATE: RAPIDRIDE I LINE JUNE2024 RENTON SEGMENT DRAWING NO: ELECTRICAL SITE PLAN 1 E1.08 D# 60323 SHEET NO: OF 302 473