Loading...
HomeMy WebLinkAboutT-4214019CV N C2 a Z O z w ry 0 X a z O z w Of 1 z Q U Z x a Z O z w Of J Q Z CO P-4 0 3 a O ry 3' O X 0 z w w J x a c 0 c a> ry m m N CV a Z O z w z i O x z c� J Q X a 0 N 0 N ry w 0 ry O m 0 o U w Y 0 (zo J (6 A O a m co o E N Q � rn U wow w a) _ 00 ,oC�) C- D N X C CO 0 3 0 o O o : 0 O �i a x m0w� Q o a- xx 2Ei H co r- W Cn 108TH AVE SE LOCATION MAP J 2 ti 00 W Cn 2 2" RGS METRO ELEC. #12-3TC 248 #8G 3 3/4" RGS METRO ELEC. #12-3TC LABEL CONDUCTORS WITH "SHELTER LIGHTS" 4 1" RGS METRO ELEC. 248 #8G LABEL CONDUCTORS WITH "TECH PYLON" 5 1.5" PVC METRO ITS. 1 SPARE 6 2" PVC METRO ITS. 1 SPARE 7 PER PSE PER PSE PROVIDED BY PSE AD -READY SUBMITTAL No. I REVISION 2-#4 #12-3TC, 248, #8G #12-3TC 248, #8G POLE #316221-166288 0% PER PSE PSE PROVIDED SECONDARYJB °yo PER PSE ELECTRICAL WIRING SCHEMATIC oyA CIRCUIT DESCRIPTION VA CKT BRKR TECH PYLON 203 1 1/20 SHELTER LIGHTS 154 2 1/20 SPACE 3 SPACE 4 SPACE 5 SPACE 6 GFCI 180 7 1/20 CONNECTED LOAD = (203+154+180) = 537 VA = 4.475 AMPS AVERAGE CONTINUOUS LOAD = ((203+154)*1.25+180) = 626 VA = 5.219 AMPS AVERAGE 7 (425) 453-5000 %?INCr Ash'j �`�r•� 1 100 112TH AVE NE, SUITE 500 �w °F �cGl ,jacobsBELLEVUE, WA 98004 If concord ENGINEERING t;GISTS0,' '*`_s`SIONAL1� 6/12/2024 DESIGNED: A. KING DRAWN: S. XIA CHECKED: X. ZHANG CHECKED: K. CHANG YUEN APPROVED: G.FRANCO PROJECT NO: E00566E18 CONTRACT NO: CXXXXXXXX EX. PSE POLE LIM King County METRO GENERAL NOTES 1. PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION. 2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND UTILITIES AND/OR TREE ROOTS ARE PRESENT. 3. INSTALL SPARE CONNECTIONS FOR FUTURE METRO FIBER OPTIC COMMUNICATION TO THE STATION. 4. SEE 1S1.27 FOR STATION PLANS AND AMENITIES DETAILS. CONSTRUCTION NOTES 1O TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. TPROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL SERVICE PEDESTAL. SEE 1 E2.01 FOR MOUNTING AND FOUNDATION DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS SHOWN BY "F" ON THE PLANS. 4O PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10-04. LABEL JUNCTION BOX "METRO". OSERVICE POINT. COORDINATE WITH PSE ELECTRICAL SERVICE REPRESENTATIVE FOR CONNECTION TO THE SECONDARY SERVICE JUNCTION BOX (SR# TO BE ISSUED AT A LATER DATE). 0' 10, 20' DEVELOPMENT ENGINEERING0 SCALE: 1" = 10' Michael Sippo 09/11 /2024 T-421419 METRO TRANSIT CAPITAL DIVISION DATE: RAPIDRIDE I LINE I JUNE2024 RENTON SEGMENT DRAWING NO: ELECTRICAL SITE PLAN 1 E1.09 D# 57300 SHEET NO: OF 303 473