HomeMy WebLinkAboutT-4214019CV
N
C2
a
Z
O
z
w
ry
0
X
a
z
O
z
w
Of 1
z
Q
U
Z
x
a
Z
O
z
w
Of
J
Q
Z
CO
P-4
0
3
a
O
ry
3'
O
X
0
z
w
w
J
x
a
c
0
c
a>
ry
m
m
N
CV
a
Z
O
z
w
z
i
O
x
z
c�
J
Q
X
a
0
N
0
N
ry
w
0
ry
O
m
0
o U
w Y
0
(zo
J (6
A O
a m co
o E
N Q �
rn U
wow
w
a) _
00
,oC�)
C-
D N X
C CO 0 3
0 o O
o : 0
O
�i a x
m0w�
Q
o a- xx 2Ei
H
co
r-
W
Cn
108TH AVE SE
LOCATION MAP
J
2
ti
00
W
Cn
2
2" RGS METRO ELEC.
#12-3TC
248
#8G
3
3/4" RGS METRO ELEC.
#12-3TC
LABEL CONDUCTORS WITH
"SHELTER LIGHTS"
4
1" RGS METRO ELEC.
248
#8G
LABEL CONDUCTORS WITH "TECH
PYLON"
5
1.5" PVC METRO ITS.
1
SPARE
6
2" PVC METRO ITS.
1
SPARE
7
PER PSE
PER PSE
PROVIDED BY PSE
AD -READY SUBMITTAL
No. I REVISION
2-#4
#12-3TC, 248, #8G
#12-3TC 248, #8G
POLE #316221-166288
0%
PER PSE PSE PROVIDED
SECONDARYJB
°yo
PER PSE
ELECTRICAL WIRING SCHEMATIC oyA
CIRCUIT DESCRIPTION
VA
CKT
BRKR
TECH PYLON
203
1
1/20
SHELTER LIGHTS
154
2
1/20
SPACE
3
SPACE
4
SPACE
5
SPACE
6
GFCI
180
7
1/20
CONNECTED LOAD = (203+154+180) = 537 VA = 4.475 AMPS AVERAGE
CONTINUOUS LOAD = ((203+154)*1.25+180) = 626 VA = 5.219 AMPS AVERAGE
7
(425) 453-5000 %?INCr Ash'j
�`�r•�
1 100 112TH AVE NE, SUITE 500 �w °F �cGl
,jacobsBELLEVUE, WA 98004 If
concord
ENGINEERING
t;GISTS0,'
'*`_s`SIONAL1�
6/12/2024
DESIGNED:
A. KING
DRAWN:
S. XIA
CHECKED:
X. ZHANG
CHECKED:
K. CHANG YUEN
APPROVED:
G.FRANCO
PROJECT NO:
E00566E18
CONTRACT NO:
CXXXXXXXX
EX. PSE POLE
LIM King County
METRO
GENERAL NOTES
1. PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT
TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE
CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION.
2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR
CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND
UTILITIES AND/OR TREE ROOTS ARE PRESENT.
3. INSTALL SPARE CONNECTIONS FOR FUTURE METRO FIBER OPTIC
COMMUNICATION TO THE STATION.
4. SEE 1S1.27 FOR STATION PLANS AND AMENITIES DETAILS.
CONSTRUCTION NOTES
1O TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH
AND CONDUIT TO AVOID UTILITIES.
TPROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL
SERVICE PEDESTAL. SEE 1 E2.01 FOR MOUNTING AND FOUNDATION
DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS
SHOWN BY "F" ON THE PLANS.
4O PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT
STANDARD PLAN J-40.10-04. LABEL JUNCTION BOX "METRO".
OSERVICE POINT. COORDINATE WITH PSE ELECTRICAL SERVICE
REPRESENTATIVE FOR CONNECTION TO THE SECONDARY SERVICE
JUNCTION BOX (SR# TO BE ISSUED AT A LATER DATE).
0' 10, 20'
DEVELOPMENT ENGINEERING0
SCALE: 1" = 10'
Michael Sippo 09/11 /2024 T-421419
METRO TRANSIT CAPITAL DIVISION DATE:
RAPIDRIDE I LINE I
JUNE2024
RENTON SEGMENT DRAWING NO:
ELECTRICAL SITE PLAN 1 E1.09
D# 57300 SHEET NO: OF