Loading...
HomeMy WebLinkAboutT-4214020CV N C2 a Z O z w ry 0 ry X a z O z w Of 1 z Q U Z X a Z O z w Of J Q z CO P-4 3 a O ry 3' O X 0 z w w J X a c 0 ry m N CV a z O z w z O X z c� J Q X 0 N O N ry w 0 ry O CD d U LU Y 0 a=— (zo J (6 A O a m cn o E N Q � c9 U L1J M W w ono _ ,oC�) D N X C CO 0 3 0 o O o : 0 O �i a x m0w� Q o a- xx 2Ei To N 1 r 1 O 108TH AVE SE LOCATION MAP METRO RAPIDRIDE J 2 ti 00 W Cn WIRING SCHEDULE RUN NO. CONDUIT SIZE SHELTER LIGHTS TECH GROUND SERVICE PULL TAPE REMARKS X PYLON 1 2" RGS METRO SERVICE 244 2 2" RGS METRO ELEC. #12-3TC 248 #8G LABEL CONDUCTORS WITH 3 3/4" RGS METRO ELEC. #12-3TC "SHELTER LIGHTS" LABEL CONDUCTORS WITH "TECH 4 1" RGS METRO ELEC. 248 #8G PYLON" 5 1.5" PVC METRO ITS. 1 SPARE 6 2" PVC METRO ITS. 1 SPARE 7 PER PSE PER PSE PROVIDED BY PSE AD -READY SUBMITTAL No. I REVISION 2-#8, #8G #12-3TC, 248, #8G EX. PSE SERVICE POLE POLE #316235-166294 PER PSE PSE PROVIDES SECONDARY JB 2-#4 ELECTRICAL WIRING SCHEMATIC 7 jN (425) 453-5000 YWA �`�r•� 1 100 112TH AVE NE, SUITE 500 41 ,jacobsBELLEVUE, WA 98004 fT If ro concord ENGINEERING t;GISTS0,' '*`_s`SIONAL1� 6/12/2024 DESIGNED: A. KING DRAWN: S. XIA CHECKED: X. ZHANG CHECKED: K. CHANG YUEN IB STATION PANEL: # VOLTAGE RATING: 120 VOLTS, 1 PHASE, 2 WIRE BUS RATING: 100 AMPS MAIN BREAKER: 60 AMPS FEED: BOTTOM FAULT CURRENT: 5,000 AMPS INTERRUPTING CAPACITY: 22,000 AMPS CIRCUIT DESCRIPTION VA CKT BRKR TECH PYLON 203 1 1/20 SHELTER LIGHTS 154 2 1/20 SPACE 3 SPACE 4 SPACE 5 SPACE 6 GFCI 180 7 1/20 CONNECTED LOAD = (203+154+180) = 537 VA = 4.475 AMPS AVERAGE CONTINUOUS LOAD = ((203+154)*1.25+180) = 626 VA = 5.219 AMPS AVERAGE APPROVED: G.FRANCO King County PROJECT NO: E00566E18 METRO CONTRACT NO: CXXXXXXXX GENERAL NOTES 1. PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION. 2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND UTILITIES AND/OR TREE ROOTS ARE PRESENT. 3. INSTALL SPARE CONNECTIONS FOR FUTURE METRO FIBER OPTIC COMMUNICATION TO THE STATION. 4. SEE 1S1.28 FOR STATION PLANS AND AMENITIES DETAILS. CONSTRUCTION NOTES OTRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. O3 PROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL SERVICE PEDESTAL. SEE 1 E2.01 FOR MOUNTING AND FOUNDATION DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS SHOWN BY "F" ON THE PLANS. 4O PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10-04. LABEL JUNCTION BOX "METRO". = O5 SERVICE POINT. COORDINATE WITH PSE ELECTRICAL SERVICE REPRESENTATIVE FOR CONNECTION TO THE SECONDARY SERVICE 0000 JUNCTION BOX (SR# TO BE ISSUED AT A LATER DATE). 0 0' 10, 20' Fi EVELOPMENT ENGINEERING ichael Sippo 09/11/2024 METRO TRANSIT CAPITAL DIVISION DATE: RAPIDRIDE I LINE I JUNE2024 RENTON SEGMENT DRAWING NO: ELECTRICAL SITE PLAN 1 E1.10 D# 57260 SHEET NO: OF 304 473