HomeMy WebLinkAboutT-4214020CV
N
C2
a
Z
O
z
w
ry
0
ry
X
a
z
O
z
w
Of 1
z
Q
U
Z
X
a
Z
O
z
w
Of
J
Q
z
CO
P-4
3
a
O
ry
3'
O
X
0
z
w
w
J
X
a
c
0
ry
m
N
CV
a
z
O
z
w
z
O
X
z
c�
J
Q
X
0
N
O
N
ry
w
0
ry
O
CD
d
U
LU Y
0
a=—
(zo
J (6
A O
a m cn
o E
N Q �
c9 U
L1J M W
w
ono _
,oC�)
D N X
C CO 0 3
0 o O
o : 0
O
�i a x
m0w�
Q
o a- xx 2Ei
To
N
1
r
1
O
108TH AVE SE
LOCATION MAP
METRO RAPIDRIDE
J
2
ti
00
W
Cn
WIRING SCHEDULE
RUN NO.
CONDUIT SIZE
SHELTER LIGHTS
TECH
GROUND
SERVICE
PULL TAPE
REMARKS
X
PYLON
1
2" RGS METRO SERVICE
244
2
2" RGS METRO ELEC.
#12-3TC
248
#8G
LABEL CONDUCTORS WITH
3
3/4" RGS METRO ELEC.
#12-3TC
"SHELTER LIGHTS"
LABEL CONDUCTORS WITH "TECH
4
1" RGS METRO ELEC.
248
#8G
PYLON"
5
1.5" PVC METRO ITS.
1
SPARE
6
2" PVC METRO ITS.
1
SPARE
7
PER PSE
PER PSE
PROVIDED BY PSE
AD -READY SUBMITTAL
No. I REVISION
2-#8, #8G
#12-3TC, 248, #8G
EX. PSE SERVICE POLE
POLE #316235-166294
PER PSE
PSE PROVIDES
SECONDARY JB
2-#4
ELECTRICAL WIRING SCHEMATIC
7 jN
(425) 453-5000 YWA �`�r•�
1 100 112TH AVE NE, SUITE 500 41
,jacobsBELLEVUE, WA 98004 fT
If ro
concord
ENGINEERING
t;GISTS0,'
'*`_s`SIONAL1�
6/12/2024
DESIGNED:
A. KING
DRAWN:
S. XIA
CHECKED:
X. ZHANG
CHECKED:
K. CHANG YUEN
IB STATION
PANEL: #
VOLTAGE RATING: 120 VOLTS, 1 PHASE, 2 WIRE
BUS RATING: 100 AMPS
MAIN BREAKER: 60 AMPS
FEED: BOTTOM
FAULT CURRENT: 5,000 AMPS
INTERRUPTING CAPACITY: 22,000 AMPS
CIRCUIT DESCRIPTION
VA
CKT
BRKR
TECH PYLON
203
1
1/20
SHELTER LIGHTS
154
2
1/20
SPACE
3
SPACE
4
SPACE
5
SPACE
6
GFCI
180
7
1/20
CONNECTED LOAD = (203+154+180) = 537 VA = 4.475 AMPS AVERAGE
CONTINUOUS LOAD = ((203+154)*1.25+180) = 626 VA =
5.219 AMPS AVERAGE
APPROVED:
G.FRANCO
King County
PROJECT NO:
E00566E18 METRO
CONTRACT NO:
CXXXXXXXX
GENERAL NOTES
1. PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT
TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE
CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION.
2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR
CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND
UTILITIES AND/OR TREE ROOTS ARE PRESENT.
3. INSTALL SPARE CONNECTIONS FOR FUTURE METRO FIBER OPTIC
COMMUNICATION TO THE STATION.
4. SEE 1S1.28 FOR STATION PLANS AND AMENITIES DETAILS.
CONSTRUCTION NOTES
OTRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH
AND CONDUIT TO AVOID UTILITIES.
O3 PROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL
SERVICE PEDESTAL. SEE 1 E2.01 FOR MOUNTING AND FOUNDATION
DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS
SHOWN BY "F" ON THE PLANS.
4O PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT
STANDARD PLAN J-40.10-04. LABEL JUNCTION BOX "METRO".
=
O5 SERVICE POINT. COORDINATE WITH PSE ELECTRICAL SERVICE
REPRESENTATIVE FOR CONNECTION TO THE SECONDARY SERVICE
0000
JUNCTION BOX (SR# TO BE ISSUED AT A LATER DATE).
0
0' 10, 20'
Fi
EVELOPMENT ENGINEERING
ichael Sippo 09/11/2024
METRO TRANSIT CAPITAL DIVISION DATE:
RAPIDRIDE I LINE I
JUNE2024
RENTON SEGMENT DRAWING NO:
ELECTRICAL SITE PLAN 1 E1.10
D# 57260 SHEET NO: OF
304 473