Loading...
HomeMy WebLinkAboutT-4214022CV N C2 a Z 0 z w ry 0 Dif r N a z � 0 z w l z O z Q U Z x a Z 0 z w ry a Z 0 z w ry 3: 0 X a z 0 z w rr z 0 z w ry 0' J X a z 0 z w CO z 0 z w J X a z 0 z w Of I w x a 0 ry a_ 3 0 X 0 z w w J x a 0 W ry m N CV z 0 z w z 0 Q x a z c� J Q X 3 a 0 N O N ft� w 0 Of 0 m 0 U LU Y 0 a== (zo� J (6 A O a m co oEF- N Q � N F--� L1J N W 7w 00 �oC�) o N X oC a N CO 0 0 (�o m 0 W 0 oa-x2Ei 52+00 -—i- LOCATION MAP 0 cn 108TH AVE SE 1f►l 108TH AVE SE US (IS I 7 I I 161, (IS 53+00 (IS PSE PROVIDE^ SECONDARY, SEE LIGHTING PLAN lL1.17 #12-3TC, 248, #8G #12-3TC " F a— PER PSE 2-#8, #8G POLE #316019-166284 ELECTRICAL SERVICE SCHEMATIC OS Gsl n PSE PROVIDED SECONDARY JB - (IS PSE PROVIDED SECONDARYJB R PSE IB STATION PANEL: # VOLTAGE RATING: 120 VOLTS, 1 PHASE, 2 WIRE BUS RATING: 100 AMPS MAIN BREAKER: 60 AMPS FEED: BOTTOM FAULT CURRENT: 9,000 AMPS INTERRUPTING CAPACITY: 22,000 AMPS CIRCUIT DESCRIPTION VA CKT BRKR TECH PYLON 203 1 1/20 SHELTER LIGHTS 154 2 1/20 SPACE 3 SPACE 4 SPACE 5 SPACE 6 GFCI 180 7 1/20 CONNECTED LOAD = (203+154+180) = 537 VA = 4.475 AMPS AVERAGE CONTINUOUS LOAD = ((203+154)*1.25+180) = 626 VA = 5.219 AMPS AVERAGE GENERAL NOTES 1. PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION. 2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND UTILITIES AND/OR TREE ROOTS ARE PRESENT. 3. INSTALL SPARE CONNECTIONS FOR FUTURE METRO FIBER OPTIC COMMUNICATION TO THE STATION. 4. SEE 1S1.29 FOR STATION PLANS AND AMENITIES DETAILS. CONSTRUCTION NOTES 1\ TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. OPROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL SERVICE PEDESTAL. SEE 1 E2.01 FOR MOUNTING AND FOUNDATION DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS SHOWN BY "F" ON THE PLANS. 4\ PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10-04. LABEL JUNCTION BOX "METRO". OSERVICE POINT. COORDINATE WITH PSE ELECTRICAL SERVICE REPRESENTATIVE FOR CONNECTION TO THE SECONDARY SERVICE JUNCTION BOX (SR# TO BE ISSUED AT A LATER DATE). WIRING SCHEDULE RUN N0. CONDUIT SIZE SHELTER LIGHTS TECH GROUND SERVICE PULL TAPE REMARKS ZL PYLON 1 2" RGS METRO SERVICE 244 2 2" RGS METRO ELEC. #12-3TC 248 #8G LABEL CONDUCTORS WITH 3 3/4" RGS METRO ELEC. #12-3TC "SHELTER LIGHTS" LABEL CONDUCTORS WITH "TECH 4 1" RGS METRO ELEC. 248 #8G PYLON" 5 1.5" PVC METRO ITS. 1 SPARE 6 2" PVC METRO ITS. 1 SPARE 7 PER PSE PER PSE PROVIDED BY PSE 7 dHO dHO dHO dHO CD EX. PSE SERVICE POLE 5 POLE #316019-166284 [DEVELOPMENT ENGINEERING chael Sippo 09/11 /2024 ' SCALE: 1" = 10' T-421422 AD -READY SUBMITTAL - DESIGNED: APPROVED: METRO TRANSIT CAPITAL DIVISION DATE. JUNE 2024 ---. yZ ING � A. KING G. FRANCO RAP I D R I D E I LINE (425) 453-5000 � � was `�r� DRAWN: 1 100 112TH AVE NE, SUITE 500 � � �w °F �Gi � La King County .JacobsBELLEVUE, WA 98004 fT S. XIA 141 j � CHECKED: PROJECT NO: R E N TO N SEGMENT DRAWING NO: �p 4METRO 1E1.11 `O ��'GISTEgI X.ZHANG E00566E18 ELECTRICAL SITE PLAN tA concord No. REVISION BY APP'D DATE ���`S,:N==� CHECKED: CONTRACT NO: E N G I N E E R I N G 6/12/2024 I D# 57250 SHEET 306 OF 473 K. CHANG YUEN CXXXXXXXX