HomeMy WebLinkAboutT-4214022CV
N
C2
a
Z
0
z
w
ry
0
Dif
r
N
a
z �
0
z
w
l
z O
z
Q
U
Z
x
a
Z
0
z
w
ry
a
Z
0
z
w
ry
3:
0
X
a
z
0
z
w
rr
z
0
z
w
ry
0'
J
X
a
z
0
z
w
CO
z
0
z
w
J
X
a
z
0
z
w
Of I
w
x
a
0
ry
a_
3
0
X
0
z
w
w
J
x
a
0
W
ry
m
N
CV
z
0
z
w
z
0
Q
x
a
z
c�
J
Q
X
3
a
0
N
O
N
ft�
w
0
Of
0
m
0
U
LU Y
0
a==
(zo�
J (6
A O
a m co
oEF-
N Q �
N F--�
L1J N W
7w
00
�oC�)
o N X
oC
a N
CO 0 0
(�o
m 0 W 0
oa-x2Ei
52+00
-—i-
LOCATION MAP
0
cn
108TH AVE SE
1f►l
108TH AVE SE
US
(IS
I
7
I
I
161,
(IS
53+00
(IS
PSE PROVIDE^
SECONDARY,
SEE LIGHTING PLAN
lL1.17
#12-3TC, 248, #8G
#12-3TC
" F
a— PER PSE
2-#8, #8G
POLE #316019-166284
ELECTRICAL SERVICE SCHEMATIC
OS Gsl
n
PSE PROVIDED
SECONDARY JB
- (IS
PSE PROVIDED
SECONDARYJB
R PSE
IB STATION
PANEL: #
VOLTAGE RATING: 120 VOLTS, 1 PHASE, 2 WIRE
BUS RATING: 100 AMPS
MAIN BREAKER: 60 AMPS
FEED: BOTTOM
FAULT CURRENT: 9,000 AMPS
INTERRUPTING CAPACITY: 22,000 AMPS
CIRCUIT DESCRIPTION
VA
CKT
BRKR
TECH PYLON
203
1
1/20
SHELTER LIGHTS
154
2
1/20
SPACE
3
SPACE
4
SPACE
5
SPACE
6
GFCI
180
7
1/20
CONNECTED LOAD = (203+154+180) = 537 VA = 4.475 AMPS AVERAGE
CONTINUOUS LOAD = ((203+154)*1.25+180) = 626 VA =
5.219 AMPS AVERAGE
GENERAL NOTES
1. PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT
TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE
CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION.
2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR
CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND
UTILITIES AND/OR TREE ROOTS ARE PRESENT.
3. INSTALL SPARE CONNECTIONS FOR FUTURE METRO FIBER OPTIC
COMMUNICATION TO THE STATION.
4. SEE 1S1.29 FOR STATION PLANS AND AMENITIES DETAILS.
CONSTRUCTION NOTES
1\ TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH
AND CONDUIT TO AVOID UTILITIES.
OPROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL
SERVICE PEDESTAL. SEE 1 E2.01 FOR MOUNTING AND FOUNDATION
DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS
SHOWN BY "F" ON THE PLANS.
4\ PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT
STANDARD PLAN J-40.10-04. LABEL JUNCTION BOX "METRO".
OSERVICE POINT. COORDINATE WITH PSE ELECTRICAL SERVICE
REPRESENTATIVE FOR CONNECTION TO THE SECONDARY SERVICE
JUNCTION BOX (SR# TO BE ISSUED AT A LATER DATE).
WIRING SCHEDULE
RUN N0.
CONDUIT SIZE
SHELTER LIGHTS
TECH
GROUND
SERVICE
PULL TAPE
REMARKS
ZL
PYLON
1
2" RGS METRO SERVICE
244
2
2" RGS METRO ELEC.
#12-3TC
248
#8G
LABEL CONDUCTORS WITH
3
3/4" RGS METRO ELEC.
#12-3TC
"SHELTER LIGHTS"
LABEL CONDUCTORS WITH "TECH
4
1" RGS METRO ELEC.
248
#8G
PYLON"
5
1.5" PVC METRO ITS.
1
SPARE
6
2" PVC METRO ITS.
1
SPARE
7
PER PSE
PER PSE
PROVIDED BY PSE
7
dHO dHO dHO
dHO
CD
EX. PSE SERVICE POLE 5
POLE #316019-166284
[DEVELOPMENT ENGINEERING
chael Sippo 09/11 /2024 ' SCALE: 1" = 10'
T-421422
AD -READY SUBMITTAL -
DESIGNED: APPROVED: METRO TRANSIT CAPITAL DIVISION DATE. JUNE 2024
---.
yZ ING � A. KING G. FRANCO RAP I D R I D E I LINE
(425) 453-5000 � � was `�r� DRAWN:
1 100 112TH AVE NE, SUITE 500 � � �w °F �Gi � La King County
.JacobsBELLEVUE, WA 98004 fT S. XIA
141 j � CHECKED: PROJECT NO: R E N TO N SEGMENT DRAWING NO:
�p 4METRO 1E1.11
`O ��'GISTEgI X.ZHANG E00566E18 ELECTRICAL SITE PLAN
tA concord
No. REVISION BY APP'D DATE ���`S,:N==� CHECKED: CONTRACT NO:
E N G I N E E R I N G 6/12/2024 I D# 57250 SHEET 306 OF 473
K. CHANG YUEN CXXXXXXXX