Loading...
HomeMy WebLinkAboutT-4214023J W U Q Or x Z U' Q x z O z W Of Of p x z O z w n, p J x z O z w Of JI x 3 z O z W p x 3 a Z O H Z W W' z' z Q U z x Z O F- z w ry F- _. M Z� O N N 00 iz�) z O z W of JI W �� 0 CV O N N I r' W W p ry 0 m o �o _jo� J CU cu � 00 oE�, M CZ w�Cz moo COo� CD N U C� � LU 0 o w o S w x 0 ~ W LU U' a-xQ o2Ei qq r N 11 1 r 1 O WIRING SCHEDULE RUN NO. X CONDUIT SIZE SHELTER LIGHTS TECH PYLON GROUND SERVICE PULL TAPE REMARKS 1 —r 3" PVC PSE SERVICE 344/0 SERVICE PANEL LOCATION: SHATTUCK AVE S & S GRADY WAY 120/240 V 1 PHASE 3 WIRE 22K AIC POWER SOURCE: PSE UNDGR XFMR VAULT #317523-165914 FAULT CURRENT: AMPS 200 AMP MAIN BREAKER NO. AMP. POLES KVA CIRCUIT DESCRIPTION NO. AMP. POLES KVA CIRCUIT DESCRIPTION 1 40 1 2.67 TRAFFIC SIGNAL 2 20 2 0.36 INTERSECTION LIGHTING (E) 3 20 2 0.12 STREET LIGHTING (A) 4 20 2 0.51 PEDESTRIAN LIGHTING (C) 5 20 2 0.48 PEDESTRIAN LIGHTING (D) 6 7 8 9 10 11 12 CONTINUOUS LOAD: 4.14 TOTAL LOAD: 5.18 I I I EX. PSE UNDGR XFMR VAULT SERVICE CABINET SEE SIGNAL PLAN 1TS1.02 SEE SIGNAL PLAN 1TS1.02 TRAFFIC SIGNAL CABINET SEE SIGNAL PLAN 1TS1.02 SEE SIGNAL PLAN 1TS1.02 SEE LIGHTING P 1 L 1.02 3-#4/0 SERVICE WIRING SCHEMATIC DESIGNED: APPROVED: AD -READY SUBMITTAL 7 �NGZ A KING G FRANCO (425) 453-5000Y WAS �`�r•� DRAWN: 1 100 112TH AVE NE, SUITE 500 �w °F �j�� Gi King County ,jacobBELLEVUE, WA 98004 f 3 S. XIA 14 j � CHECKED: PROJECT N0: 1 �j I 0 ��,� C434g�9 ty " ... METRO concord� `�' rsTE � X ZHANG E00566E18 No. REVISION BY APP'D DATE :NAL CHECKED: CONTRACT NO: ENGINEERING 6/12/2024 K. CHANG YUEN CXXXXXXXX GENERAL NOTES 1. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND UTILITIES AND/OR TREE ROOTS ARE PRESENT. 2. SEE 1TS1.02 FOR SIGNAL PLANS AND DETAILS. CONSTRUCTION NOTES 2O BORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES AS NEEDED. RESTORE AREA DISTURBED BY BORING OPERATIONS BACK TO PRECONSTRUCTION CONDITION. O6 SERVICE POINT. COORDINATE WITH PSE ELECTRICAL SERVICE REPRESENTATIVE FOR SERVICE CONNECTION (SR# TO BE ISSUED AT A LATER DATE). 0' 10' 20' IDEVELOPMENT ENGINEERING SCALE: 1" - 10' Michael Sippo 09/11 /2024 01 1 T-421423 METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT ELECTRICAL SITE PLAN S GRADY WAY & SHATTUCK AVE S DATE: JUNE 2024 DRAWING NO: 1 E1.12 SHEET NO: OF 307 473 N M O O O 1 r N 19 a O N O O O 1 N N a J