HomeMy WebLinkAboutT-4214023J
W
U
Q
Or
x
Z
U'
Q
x
z
O
z
W
Of
Of
p
x
z
O
z
w
n,
p
J
x
z
O
z
w
Of
JI
x
3
z
O
z
W
p
x
3
a
Z
O
H
Z
W
W'
z'
z
Q
U
z
x
Z
O
F-
z
w
ry
F-
_.
M
Z�
O
N
N
00
iz�)
z
O
z
W
of JI
W
��
0
CV
O
N
N I
r'
W
W p
ry
0 m
o �o
_jo�
J CU
cu
� 00
oE�,
M CZ
w�Cz
moo
COo�
CD N U
C� � LU
0 o w
o S w
x
0 ~ W LU
U'
a-xQ
o2Ei
qq
r
N
11
1
r
1
O
WIRING SCHEDULE
RUN NO.
X
CONDUIT SIZE
SHELTER LIGHTS
TECH PYLON
GROUND
SERVICE
PULL TAPE
REMARKS
1 —r
3" PVC PSE SERVICE
344/0
SERVICE PANEL
LOCATION: SHATTUCK AVE S & S GRADY WAY
120/240 V 1 PHASE 3 WIRE 22K AIC
POWER SOURCE: PSE UNDGR XFMR VAULT #317523-165914 FAULT CURRENT: AMPS
200 AMP MAIN BREAKER
NO.
AMP.
POLES
KVA
CIRCUIT DESCRIPTION
NO.
AMP.
POLES
KVA
CIRCUIT DESCRIPTION
1
40
1
2.67
TRAFFIC SIGNAL
2
20
2
0.36
INTERSECTION LIGHTING (E)
3
20
2
0.12
STREET LIGHTING (A)
4
20
2
0.51
PEDESTRIAN LIGHTING (C)
5
20
2
0.48
PEDESTRIAN LIGHTING (D)
6
7
8
9
10
11
12
CONTINUOUS LOAD:
4.14
TOTAL LOAD:
5.18
I
I
I
EX. PSE UNDGR XFMR VAULT
SERVICE CABINET
SEE SIGNAL PLAN
1TS1.02
SEE SIGNAL PLAN
1TS1.02
TRAFFIC SIGNAL
CABINET
SEE SIGNAL PLAN
1TS1.02
SEE SIGNAL PLAN
1TS1.02
SEE LIGHTING P
1 L 1.02
3-#4/0
SERVICE WIRING SCHEMATIC
DESIGNED: APPROVED:
AD -READY SUBMITTAL 7 �NGZ A KING G FRANCO
(425) 453-5000Y WAS �`�r•� DRAWN:
1 100 112TH AVE NE, SUITE 500 �w °F �j�� Gi King County
,jacobBELLEVUE, WA 98004 f 3 S. XIA
14
j � CHECKED: PROJECT N0:
1 �j I
0 ��,� C434g�9 ty " ...
METRO
concord� `�' rsTE � X ZHANG E00566E18
No. REVISION BY APP'D DATE :NAL CHECKED: CONTRACT NO:
ENGINEERING 6/12/2024
K. CHANG YUEN CXXXXXXXX
GENERAL NOTES
1. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR
CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND
UTILITIES AND/OR TREE ROOTS ARE PRESENT.
2. SEE 1TS1.02 FOR SIGNAL PLANS AND DETAILS.
CONSTRUCTION NOTES
2O BORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES
AS NEEDED. RESTORE AREA DISTURBED BY BORING OPERATIONS
BACK TO PRECONSTRUCTION CONDITION.
O6 SERVICE POINT. COORDINATE WITH PSE ELECTRICAL SERVICE
REPRESENTATIVE FOR SERVICE CONNECTION (SR# TO BE ISSUED AT
A LATER DATE).
0' 10' 20'
IDEVELOPMENT ENGINEERING SCALE: 1" - 10'
Michael Sippo 09/11 /2024 01 1 T-421423
METRO TRANSIT CAPITAL DIVISION
RAPIDRIDE I LINE
RENTON SEGMENT
ELECTRICAL SITE PLAN
S GRADY WAY & SHATTUCK AVE S
DATE:
JUNE 2024
DRAWING NO:
1 E1.12
SHEET NO: OF
307 473
N
M
O
O
O
1
r
N
19
a
O
N
O
O
O
1
N
N
a
J