Loading...
HomeMy WebLinkAboutT-4214027qq r N 11 qrL COL REBAR PER STRUCTURAL DRAWINGS li- COL (REAR) C L ♦ ♦ J + SEE DETAILS 3 AND 4 0 (FRONT) CONNECT END OF GROUND WIRE TO REBAR WITH GROUND CLAMP BURNDY GAR644C-RB SHELTER FOOTING GROUNDING DETAIL 1 SCALE: NTS SHELTER LIGHTING POWER ENCLOSURE #4 AWG COPPER GROUNDING ELECTRODE CONDUCTOR (19 STRANDED BARE) ROUTED UNDER • 8 - ; ' CONDUITS, BONDED TO SHELTER FOUNDATION a _ �•-°. -° - a ' REBAR AND SHELTER STRUCTURAL STEEL °- _ - - ¢ °' _ .aa GROUNDING ELECTRODE DETAIL SCALE: NTS PVC CAP FOAM FILL —\ SEE DETAIL 1 FOR ROUTING THROUGH FOOTING #4 STRANDED COPPER ELECTRODE BURIED CONDUIT AND GROUNDING ELECTRODE INTERNAL SHELTER LIGHTING DETAIL 0� SCALE: NTS CONSTRUCTION NOTES OCONDUIT SHALL BE INSTALLED AT LEAST 24" BELOW FINISHED GRADE. O2 FOR SHELTER GROUNDING, TIE 25 FEET OF #4 19 STRANDED GREEN THHN COPPER GROUNDING ELECTRODE (STRIPPED OF JACKETING) TO THE SHELTER FOUNDATION REBARS WITH TIE WIRES. LEAVE 2 FEET AT THE END FOR ATTACHMENT TO THE GROUNDING LUG ON THE SHELTER LEG. SEE DETAIL 2. OTO PROTECT THE GROUND WIRE UNTIL THE SHELTER IS INSTALLED, PLACE THE 2-FT END OF THE #4 COPPER ELECTRODE INTO THE %4" DIA RGS CONDUIT AS SHOWN IN DETAIL 3. SECURE %4,, RGS CONDUIT IN PLACE. SEAL THE RGS CONDUIT/COUPLING WITH DUCT TAPE. CAP THE ASSEMBLY WITH A 3" PVC CAP AND FILL VOID WITH SPRAY -ON FOAM. TOP OF PVC CAP SHALL BE %4" BELOW THE FINISHED CONCRETE. O4 THE #4 19 STRANDED GREEN THHN COPPER GROUND ELECTRODE SHALL BE ENCLOSED BY AT LEAST 2" OF CONCRETE IN ACCORDANCE WITH NEC 250.52(A)(3). OSEE FOUNDATION DETAILS FOR EXACT LOCATION OF THE ELECTRICAL LEG FOR SPECIFIC SHELTER CONFIGURATIONS. OPRIOR TO INSTALLING SHELTER, CHIP AWAY THE %" CONCRETE COVER AND REMOVE THE PVC CAP, FOAM AND DUCT TAPE. THEN PULL OUT THE #4 COPPER ELECTRODE. CONNECT THE ELECTRODE TO THE SHELTER LEG VIA A GROUNDING LUG. TAKE EVERY PRECAUTION TO PROTECT THE GROUNDING WIRE AND NOT ALLOW DEBRIS TO ENTER THE CONDUITS. FILL THE VOID OF THE CHIPPED OUT CONCRETE WITH HIGH STRENGTH GROUT AFTER EXTENDING THE CONDUITS TO THE NEMA BOX. O7 CONNECT THE #4 WIRE TO THE STAINLESS STEEL %" STUD WITH A BURNDY YA4CTC38. CONTRACTOR SHALL CLEAN THREADS PRIOR TO INSTALLING THE #4 WIRE. ELECTRICAL CONDUIT TO POWER PEDESTAL BACK OF PLATFORM CONDUIT ENTRY LOCATION SHELTER COLUMN DETAIL SCALE: NTS DOWNSPOUT CLADDING ASSEMBLY BASE PLATE COLUMN AND GUSSET PLATES ANCHOR BOLTS AND NUTS ELECTRICAL CONDUIT COMM. CONDUIT 0 DEVELOPMENT ENGINEERING c\i Cm w o Michael Sippo 09/11 /2024 0 z � , c w o0 J (6 w �cuJ T— 21427 X DESIGNED: APPROVED: DATE: AD READY SUBMITTAL o E _ METROTRANSIT CAPITAL DIVISION who ,• yZNG Z •, A. KING G. FRANCO RAP I D R I D E I LINE m �' (425) 453-5000 of WAs�, `�r DRAWN: o 0 1 100 112TH AVE NE, SUITE 500 o � BELLEVUE, WA 98004 ti1v King County o y 3 A. KING o 0 4 CHECKED: PROJECT N0: R E N TO N SEGMENT DRAWING N0: X.ZHANG E00566E18 SHELTER GROUNDING 1 E2.04 U �� ��GI STEg�'9 �'' .. 0 o � w concord : _ .METRO DETAILS SHEET NO: OF 0 w LU `S`SIONAL 1� CHECKED: CONTRACT NO: . p w No. REVISION BY APP'D DATE ENGINEERING �� �� 311 473 J � Q 6/12/2024 0 a- x K. CHANG YUEN CXXXXXXXX N M O O O r N a