Loading...
HomeMy WebLinkAboutT-4214033qq qrm 11 r qe O O HOLE GROUNDING LUG TECH PYLON FOOTING GROUNDING DETAIL 1 SCALE: NTS FTG 5 6 STRUCTURAL STEEL GROUND LUG #4 STRANDED COPPER ELECTRODE GROUNDING ELECTRODE TECH PYLON FOUNDATION DETAIL 2 SCALE: NTS AD -READY SUBMITTAL No. I REVISION #4 STRANDED COPPER 2 4 ELECTRODE BACK OF CHANNEL :ia cy.1110vmZ •yI:W"l�J;f.11 91;fWAI T11101 W1011 CONDUIT SCHEDULE CONDUIT CONNECTION 1" RGS ELECTRICAL TO POWER PEDESTAL 1.5" PVC COMMUNICATION TO SHELTER 1.5" PVC COMMUNICATION TO SHELTER #2 (IF 2 SHELTERS AT ZONE) 2" PVC COMMUNICATION TO COMMUNICATIONS JUNCTION BOX PVC CAP FOAM FILL --\ SEE DETAIL 1 FOR ROUTING THROUGH FOOTING #4 STRANDED COPPER ELECTRODE BURIED CONDUIT AND GROUNDING ELECTRODE TECH PYLON DETAIL 3 SCALE: NTS ON►0A A co b (425) 453-5000YjN As �`�r•� 1100 112TH AVE NE, SUITE 500 4w °F94,11. h'j�cGl BELLEVUE, WA 98004 If f I ' BY APP'D DATE BY ENGINEERING DESIGNED: A. KING DRAWN: A. KING CHECKED: STEg�9 �'' X. ZHANG ��S`SIONAL 1� CHECKED: ' 6/12/2024 K. CHANG YUEN ELECTRICAL CONDUIT TO POWER PEDESTAL APPROVED: G.FRANCO PROJECT NO: E00566E18 CONTRACT NO: CXXXXXXXX CONSTRUCTION NOTES O1 CONDUIT SHALL BE INSTALLED AT LEAST 24" BELOW FINISHED GRADE. OFOR TECH PYLON GROUNDING, TIE 25 FEET OF #4 19 STRANDED GREEN THHN COPPER GROUNDING ELECTRODE (STRIPPED OF JACKETING) TO THE TECH PYLON FOUNDATION REBARS WITH TIE WIRES. LEAVE 2 FEET AT THE END FOR ATTACHMENT TO THE GROUNDING LUG ON THE TECH PYLON LEG. SEE DETAIL 2. OTO PROTECT THE GROUND WIRE UNTIL THE SHELTER IS INSTALLED, PLACE THE 2 FT END OF THE #4 STRANDED BARE COPPER ELECTRODE INTO 1" RGS ELECTRICAL CONDUIT AS SHOWN IN DETAIL 3. SECURE 1" RGS COUPLING IN PLACE. SEAL THE RGS CONDUIT/COUPLING WITH DUCT TAPE. CAP THE ASSEMBLY WITH A 3" PVC CAP AND FILL VOID WITH SPRAY -ON FOAM. TOP OF PVC CAP SHALL BE %4" BELOW THE FINISHED CONCRETE GRADE. OTHE #4 STRANDED BARE COPPER GROUND ELECTRODE SHALL BE ENCLOSED BY AT LEAST 2" OF CONCRETE IN ACCORDANCE WITH NEC 250.52(A)(3) AND INSTALLED TO THE BOTTOM OF THE REBAR MAT. OPRIOR TO INSTALLING TECH PYLON, CHIP AWAY THE Y4" CONCRETE COVER AND REMOVE THE 3" PVC CAP, FOAM, AND ANTI -CORROSION TAPE. THEN PULL OUT THE #4 COPPER ELECTRODE. CONNECT THE N ELECTRODE TO THE GROUNDING LUG INSIDE THE TECH PYLON LEG. TAKE EVERY PRECAUTION TO PROTECT r THE GROUNDING WIRE AND NOT ALLOW DEBRIS TO ENTER CONDUITS. FILL THE VOID OF THE CHIPPED OUT CONCRETE WITH HIGH STRENGTH GROUT AFTER EXTENDING THE CONDUITS TO THE NEMA BOX INSIDE THE O TECH PYLON. r N OCONNECT THE #4 WIRE TO THE STAINLESS STEEL 3/" STUD WITH A BURNDY YA4CTC38 (OR APPROVED V EQUAL). CONTRACTOR SHALL CLEAN THREADS PRIOR TO INSTALLING THE #4 WIRE. OCONNECT END OF GROUND WIRE TO REBAR WITH GROUND CLAMP BURNDY GAR644C-RB (OR APPROVED EQUAL), CONDUIT ENTRY LOCATION TECH PYLON DETAIL 4 SCALE: NTS LIM King County METRO MAIN BASE PLATE BEAM DEVELOPMENT ENGINEERING ` Michael Sippo 09/11 /2024 F-T-421433 METRO TRANSIT CAPITAL DIVISION DATE: RAPIDRIDE I LINE RENTON SEGMENT TECH PYLON GROUNDING DETAILS JUNE 2024 DRAWING NO: 1 E2.10 SHEET NO: OF 317 473